Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
NEBRASKA | STATEWIDE | Preliminary Engineering | Other | $997,500 |
NEVADA | Cold in Place Recycle | Pavement Improvement | $1,588,585 | |
NEVADA | Continuation of Rail Line for Historic Rail Road | Transportation Enhancements | $2,757,000 | |
NEVADA | Cold in Place Recycle | Pavement Improvement | $1,011,170 | |
NEVADA | Overlay Plantmix Bituminous Surface | Pavement Improvement | $14,016,262 | |
NEVADA | Overlay Plantmix Bituminous Surface | Pavement Improvement | $12,349,915 | |
NEVADA | Overlay Plantmix Bituminous Surface | Pavement Improvement | $2,587,040 | |
NEVADA | Overlay Plantmix Bituminous Surface | Pavement Improvement | $8,839,236 | |
NEVADA | Overlay Plantmix Bituminous Surface | Pavement Improvement | $10,645,650 | |
NEVADA | Construct a Wildlife Overpass | New Bridge Construction | $2,372,433 | |
NEVADA | Construct a Visitor Center | Other | $575,000 | |
NEVADA | LAS VEGAS | Various landscaping and aesthetic proejct on US95 in Clark County, NV. | Transportation Enhancements | $6,450,944 |
NEVADA | Overlay Plantmix Bituminous Surface | Pavement Improvement | $3,010,930 | |
NEVADA | Cold in Place Recycle | Pavement Improvement | $1,191,458 | |
NEVADA | Cold in Place Recycle | Pavement Improvement | $3,256,353 | |
NEW HAMPSHIRE | NASHUA | CONSTRUCT 4,000 LF OF 5' WIDE BITUMINOUS SIDEWALK ON ONE SIDE & CONSTRUCT 4000 LF OF 4' WIDE BITUMINOUS & BICYCLE LANE ON ONE SIDE: LOCATED ON THE EAST SIDE OF NH 102 BETWEEN EVERGREEN DRIVE AND MEGAN | Transportation Enhancements | $357,000 |
NEW HAMPSHIRE | BOSTON(NH)LAWREN-HAVERH,MA(MA-NH-RI | EXIT 3 AREA, NB MAINLINE CONSTRUCTION FROM SALEM TOWN LINE TO MILE MARKER 6.3, INCLUDING INTERIM TRANSITIONS, AND APPROXIMATELY 3700 I.f. OF SB MAINLINE RECONSTRUCTION NORTH OF EXIT 3 (WINDHAM) | New Construction | $27,135,146 |
NEW HAMPSHIRE | WIDEN FE EVERETT TURNPIKE | Pavement Widening | $10,365,671 | |
NEW HAMPSHIRE | VILLAGE PEDESTRIAN IMPROVEMENTS: RECONSTRUCT APPROX. 2,800' OF ROADSIDE IN THE VILLAGE TO RESTORE DEFINITION OF PEDESTRIAN ACCESS BY WAY OF SIDEWALKS AND CROSSWALKS. RECONSTRUCT SIDEWALKS, DELINEATI | Transportation Enhancements | $617,600 | |
NEW HAMPSHIRE | KING ST SIDEWALK CONNECTOR: CONSTRUCT SIDEWALKS ALONG NORTH MAIN ST FORM EXISTING SIDEWALK TO INTERSECTION OF US 3/4 & FROM US 3/4 INTERSECTION TO RIVER RD CONNECTING WITH EXISTING SIDEWALK ON KING ST | Transportation Enhancements | $484,050 | |
NEW HAMPSHIRE | LACONIA - OPECHEE - WINNISQUAM (WOW) TRAIL PHASE 1 - CONSTRUCT 7040' (Segments 7-10) SHARED USE PATH FOR BICYCLES & PEDESTRIANS IN RAILROAD CORRIDOR FROM MAIN ST (Laconia) TO ELM ST (Lakeport) (Phase | Transportation Enhancements | $560,900 | |
NEW HAMPSHIRE | MANCHESTER | EARTHWORK CONTRACT WEST OF THE MERRIMACK RIVER | New Construction | $8,523,588 |
NEW HAMPSHIRE | ALBUQUERQUE AVENUE TRAIL COMPLETION: CONSTRUCT 0.85 MILES AND 0.95 MILES OF PEDESTRIAN BIKEWAY ADJACENT TO ALBUQUERQUE AVENUE (TE Program) [06-26TE][ARRA] | Transportation Enhancements | $462,525 | |
NEW HAMPSHIRE | 3 1/2" PAVEMENT OVERLAY FROM EXIT 6 IN EPPING TO SQUAMSCOTT RIVER BRIDGE IN EXETER | Pavement Improvement | $7,817,109 | |
NEW HAMPSHIRE | EXIT 12A NORTH TO EXIT 13, MICROSURFACING OF TW ONLY (7.3 MILES) | Pavement Improvement | $1,129,625 | |
NEW HAMPSHIRE | NORTH MAIN STREET EAST TO NH9, MICROSURFACING OF TW ONLY (4.9 MILES) [Parent = IPPP*3927] [ARRA] | Pavement Improvement | $817,740 | |
NEW HAMPSHIRE | EXIT 14 NORTH TO EXIT 17, 1.5" TW INLAY WITH 1.5" FULL WIDTH OVERLAY (6.1 MILES) [Parents = IPPP*3927, BRPPI 6601 AND GRR 785] [ARRA] | Pavement Improvement | $5,356,186 | |
NEW HAMPSHIRE | EXIT 19 NORTH TO EXIT 22, LEVEL .5" AND 1" OVERLAY (3.5 MILES) [PARENT = IPPP*3927 & BRPPI*6601] [ARRA] | Pavement Improvement | $2,188,626 | |
NEW HAMPSHIRE | I-93 NB AND SB; PAVEMENT REHABILITATION FROM EXIT 27 NORTH TO EXIT 28 (3.1 MILES) PARENT= IPPP*3927 & BRPPI*6601] [ARRA] | Pavement Improvement | $908,540 | |
NEW HAMPSHIRE | BOSTON(NH)LAWREN-HAVERH,MA(MA-NH-RI | PORTSMOUTH TRAFFIC CIRCLE TO HIGH LEVEL BRIDGE, LEVEL AND 1.5" OVERLAY (1.6 MILES) [PARENT = IPPP*3927] [ARRA] | Pavement Improvement | $3,470,149 |
NEW HAMPSHIRE | EXIT 30 TO EXIT 32, 2" FULL WIDTH INLAY (5.4 MILES) [PARENT = IPPP*3927 & BRPPI 6601] [ARRA] | Pavement Improvement | $8,082,360 | |
NEW HAMPSHIRE | EXIT 23 NORTH TO EXIT 24, 1" OVERLAY WITH .5" LEVEL (6.1 MILES) [PARENT = IPPP*3927] [ARRA] | Pavement Improvement | $3,924,108 | |
NEW HAMPSHIRE | EXIT 11 NORTH TO EXIT 12A, 1.5" FULL WIDTH INLAY (4.9 MILES) | Pavement Improvement | $5,315,917 | |
NEW HAMPSHIRE | DISTRICT 1: RESURFACING & OTHER RELATED WORK | Pavement Improvement | $3,309,050 | |
NEW HAMPSHIRE | DISTRICT 2: RESURFACING & OTHER RELATED WORK | Pavement Improvement | $3,212,580 | |
NEW HAMPSHIRE | DISTRICT 3: RESURFACING & OTHER RELATED WORK | Pavement Improvement | $3,127,940 | |
NEW HAMPSHIRE | RESURFACING & OTHER RELATED WORK (BET-RES*581) [ARRA] | Pavement Improvement | $2,765,000 | |
NEW HAMPSHIRE | RESURFACING & OTHER RELATED WORK (BET-RES*581) [ARRA] | Pavement Improvement | $3,131,447 | |
NEW HAMPSHIRE | BOSTON(NH)LAWREN-HAVERH,MA(MA-NH-RI | RESURFACING & OTHER RELATED WORK (BET-RES*581) [ARRA] | Pavement Improvement | $3,129,935 |
NEW JERSEY | This project replaces the two bascule bridges located closest to Somers Point and Ocean City at Ship Channel and Beach Thorofare, respectively, with high level fixed span (55` clearance) bridges & eli | Bridge Replacement | $70,000,000 | |
NEW JERSEY | Project provides for milling and resurfacing within exiting pavement limits. | Pavement Improvement | $2,339,513 | |
NEW JERSEY | Drainage project including the construction of inlets, pipes, detention basins and outfalls. In addition, milling and resurfacing of Rt 30 is included in the project scope of work to address the wet | Pavement Improvement | $14,830,877 | |
NEW JERSEY | The project involves deck repair, curb repair and applying deck overlay system on the entire deck of Rt.72 Over Manhawkin Bay bridge. | Bridge Improvement | $6,937,485 | |
NEW JERSEY | Final design work for bridge deck replacement | Other | $1,231,167 | |
NEW JERSEY | The project involves roadway & drainage improvements on Route 29 in West Amwell Township & City of Lambertville. The proposed Smart Solutions scope includes pavement resurfacing, profile and cross-sl | Pavement Improvement | $2,689,584 | |
NEW JERSEY | ROUTE 29 WEST AMWELL TOWNSHIP DRAINAGE (SHEET FLOW) | Other | $168,405 | |
NEW JERSEY | This project will paint two Route 1&9 Truck movable bridges over the Hackensack and Passaic Rivers. | Pavement Improvement | $30,563,320 | |
NEW JERSEY | Milling and resurfacing of pavement to extend the usable life of the highway. Existing underclearances will be maintained. Drainage work will be limited to resetting of existing facilities. | Pavement Improvement | $4,664,536 | |
NEW JERSEY | Replace the bridge decks of Rt 440 NB over Ramp WI and Ramp WK over CR 514. Both bridges are within the interchange of RT 440, CR 514 and NJTA exit 10. | Pavement Improvement | $5,909,780 | |
NEW JERSEY | Final design work for bridge deck replacement | Other | $1,015,247 | |
NEW JERSEY | Final design work for bridge deck replacement | Other | $410,961 | |
NEW JERSEY | PHILADELPHIA-WILMINGTON(PA-DE-NJ-MD | TUCKAHOE ROAD, CR555 | Pavement Improvement | $4,126,930 |
NEW JERSEY | Addresses painting needs for 9 bridges along the I-78 corridor. | Pavement Improvement | $3,826,000 | |
NEW JERSEY | The project is to perform preventive repairs and safety improvements to this section of I-78 (M.P 57.7 to 58.5). This includes rubblization and overly of the existing pavement, reconstruction of exist | Pavement Improvement | $20,155,549 | |
NEW JERSEY | Final design work for bridge deck replacement | Other | $457,281 | |
NEW JERSEY | This project is a pavement reconstruction project consisting of remoal of existing concrete slab and full depth replacement with Hot mix asphalt. | Pavement Improvement | $4,744,211 | |
NEW JERSEY | This project will mill and resurface this section of I-80 between M.P. 58.9-65.4. There will be some deck patching performed. Guide rail upgrades will be included. | Pavement Improvement | $15,937,762 | |
NEW JERSEY | This is a resurfacing project consists of milling 2" and repaved with 5" of Superpave Hot Mix Asphalt. Substandard guide rail will be upgraded. Existing vertical under-clearances will be maintained at | Pavement Improvement | $11,502,043 | |
NEW JERSEY | Addresses painting needs for 9 bridges along the I-80 corridor. | Pavement Improvement | $8,655,670 | |
NEW JERSEY | This project consists of replacing the existing decks as well as pier repairs | Bridge Improvement | $10,007,145 | |
NEW JERSEY | Addresses painting needs for 5 bridges along the I-80 corridor. | Pavement Improvement | $9,775,670 | |
NEW JERSEY | This project will paint 16 bridges on Route I-280 | Pavement Improvement | $8,290,733 | |
NEW JERSEY | This project will paint 16 bridges on Route I-280 | Pavement Improvement | $8,788,000 | |
NEW JERSEY | This project will paint 17 bridges on Route I-280 | Pavement Improvement | $6,190,000 | |
NEW JERSEY | The project consist of milling and resurfacing and upgrading guide rail will be upgraded to meet existing standards as necessary. Two deck replacement and one superstructure replacement. | Pavement Improvement | $34,399,885 | |
NEW JERSEY | The project will construct improvements to restore the deck of the north bound structure. Improvements will consist of rehabilitation that includes partial depth deck replacement and deck sealing ove | Pavement Improvement | $2,525,004 | |
NEW JERSEY | This project will paint 49 bridges on Route I-295 | Pavement Improvement | $2,911,670 | |
NEW JERSEY | I-295 pavement rehabilitation from Route 45 (Interchange 24) to Berlin-Haddonfield Rd (CR 561) (Interchange 32) Milepost 24.5- 32.4; Bridge deck replacements on 4 mainline structures. | Pavement Improvement | $76,235,658 | |
NEW JERSEY | ROW acquisition to allow for the construction of a new alignment to carry I-295 mainline through the interchange. The existing interchange does not provide a direct connection for I-295 thru traffic. | Other | $4,807,500 | |
NEW JERSEY | KINGS HIGHWAY STREETSCAPE IMPROVEMENTS | Transportation Enhancements | $243,245 | |
NEW JERSEY | MARKET STREET COMMONS AND STREETSCAPE | Transportation Enhancements | $485,649 | |
NEW JERSEY | BURLINGTON STREET STREETSCAPE IMPROVEMENTS | Transportation Enhancements | $523,841 | |
NEW JERSEY | Deck replacement with minor Abutment repairs . | Pavement Improvement | $1,875,487 | |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | Design work. Allows for the completion of final design. Completing final design will allow the construction phase to begin sooner for pavement restoration and drainage improvements on Route 35. | Other | $1,491,129 |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | Design work. Allows for the completion of final design. Completing final design will allow the construction phase to begin sooner for pavement restoration and drainage improvements on Route 35. | Other | $1,498,266 |
NEW JERSEY | Provides for new bridge deck construction. | Bridge Improvement | $2,969,721 | |
NEW JERSEY | BROAD STREET STREETSCAPE | Transportation Enhancements | $1,015,894 | |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | Design work which will allow for construction phase of project to begin sooner. The construction phase will allow for a Rt. 7 project (Contract 3 of 4) to provide for the new vertical lift span | Other | $3,471,845 |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | Design work which will allow for construction phase of project to begin sooner. The construction phase (Contract 4 of 4) will provide final bridge & approach roadway segments for the vertical lift br | Other | $9,716,313 |
NEW JERSEY | Final design work for bridge deck replacement | Other | $547,268 | |
NEW JERSEY | This is a bridge superstructure replacement project. Vertical underclearance will be improved for Rt. 46 EB | Bridge Improvement | $1,156,497 | |
NEW JERSEY | Major roadway, structures and drainage improvements at the intersection of Rt. 46 and Main Street; two bridge replacements (Structures 0220157 and 0220158). | Pavement Improvement | $32,590,495 | |
NEW JERSEY | Utility Work for major roadway, structures and drainage improvements at the intersection of Rt. 46 and Main Street. | Other | $2,589,220 | |
NEW JERSEY | This project concsists of the milling and resurfacing of Route 440 from milepost 18.90 to milepost 20.3, both in the northbound and southbound directions. The project is located in the City of Bayonn | Pavement Improvement | $3,398,471 | |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | Superstructure replacement. Roff Avenue goes over Rt. 46. Rt. 46 is in a cut section with high retaining walls. The Road itself is a historic district. | Bridge Improvement | $2,040,931 |
NEW JERSEY | This project consists of superstructure replacement over Route 46 in Clifton City, Passaic County. There will be cast in place concrete deck with new pier caps and bearings that will improve a bridge | Pavement Improvement | $3,303,102 | |
NEW JERSEY | Partial deck replacement including re-profiling of the deck and roadway approaches to improve drainage, reconstruction of deteriorated concrete abutment headers, and patching of spalls in the undersid | Bridge Improvement | $1,147,227 | |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | TURKEY BROOK PATH PARKWAY PROJECT | Other | $180,150 |
NEW JERSEY | This project will provide for the construction of the continuation of the Hudson River Waterfront Walkway in front of Stevens Institute. The Project is sponsored by the NJDEP in conjunction with Ste | Transportation Enhancements | $1,902,500 | |
NEW JERSEY | Contract # 10 will protect about 5.14 miles of Route 18, from MP 16.56 to MP 19.20, MP 24.30 to MP 25.2; and MP 28.70 to MP 30.70; and 4.64 miles of Route I-95, from MP 0.55 to MP 2.22 and from MP 5. | Safety/Traffic Management | $4,554,354 | |
NEW JERSEY | Contract # 11 will protect about 5.05 miles of Route 24, from MP 1.35 to MP 1.6, MP 1.82 to MP 5.0; and MP 5.2 to MP 6.82 and 3.77 miles of Route I-280, from MP 1.1 to MP 1.7 and from MP 2.3 to MP 3.2 | Safety/Traffic Management | $2,945,648 | |
NEW JERSEY | NEW YORK-NORTHEASTERN NJ (NY) | This project provides for the construction and inspection of various County roads located throughout Somerset County. | Transportation Enhancements | $5,580,954 |
NEW MEXICO | US 62, Texas State Line to Carlsbad, MP 16.25 - 26.25, construct new lanes | Pavement Widening | $15,600,000 | |
NEW MEXICO | LAS CRUCES | I-10, Six Laning (Texas state line to Las Cruces | Pavement Widening | $10,000,000 |
NEW MEXICO | I-40, Paseo del Volcan / West Central / Access to Double Eagle II Airport Interchange, MP 150-151 | Pavement Widening | $14,800,000 | |
NEW MEXICO | US 84/285 MM 185.0 TO 186.5 | Pavement Widening | $14,000,000 | |
NEW MEXICO | US 84, Pojoaque to Espanola, Northern half of Corridor, MP 187.25 to MP 188.75 | Pavement Improvement | $9,500,000 | |
NEW MEXICO | US 64, Raton to Clayton reconstruction | New Construction | $28,993,729 | |
NEW MEXICO | NM 128, Jct NM31 E thru Jal to Texas S/L, MP 24.7 - 38.81 | Pavement Improvement | $8,000,000 | |
NEW MEXICO | ALBUQUERQUE | PASEO DEL VOLCON ( NORHTHERN SECTION)STAGE II | Pavement Widening | $14,000,000 |
NEW MEXICO | US 491, Tohatchi to Shiprock | New Construction | $31,500,000 | |
NEW MEXICO | US 491 MP 15.6 TO MP 29.5 | Pavement Improvement | $11,000,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $643,000 | |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | GLEN CLOVE:FERRY TERMINAL & BOAT BASIN-WATERBORN AND SITE IMPROVEMENTS-INSTALL NEW BULKHEAD/DOCKS/ESPLANADE/PARK/PED (PHASE 1). | Other | $8,000,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | IMPROVE ROADWAY, PEDESTRIAN, AND STREETSCAPE IMPROVEMENTS ALONG PROSPECT AVENUE FOR THE NEW CASSEL REVITALIZATION PROJECT IN NORTH HEMPSTEAD. | Safety/Traffic Management | $5,000,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | NASSAU COUNTY:TRAFFIC SIGNAL EXPANSION PHASE 2-FURTHER EXPAND NASSAU CO'S CENTRAL COMPUTERIZED TRAFFIC SIGNAL SYSTEM. | Safety/Traffic Management | $3,000,000 |
NEW YORK | ROAD RESURFACING PH 1 ON FEDERAL AID HIGHWAYS IN NASSAU COUNTY | Pavement Improvement | $4,500,000 | |
NEW YORK | ROAD RESURFACING PH 2 ON FEDERAL AID HIGHWAY IN NASSAU COUNTY | Pavement Improvement | $4,500,000 | |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | REHABILITATION OF COMMACK ROAD (CR-4) FROM NICOLLS ROAD TO VICINITY OF POLO STREET" | Pavement Improvement | $3,500,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | CR 67, MOTOR PARKWAY REHAB AND RESURFACING,FROM VICINITY OF LIE SERVICE ROAD TO CR17. | Pavement Improvement | $4,000,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | SUFFOLK COUNTY:2009 PAVEMENT RESURFACING LIE NORTH/SOUTH SERVICE ROADS FROM WASHINGTON AVE/WICKS RD TO OCEAN AVE (EXIT 59). | Pavement Improvement | $10,000,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | IMPLEMENT AN ALTERNATE TRANSP PATH FOR BICYCLE/PED USE TO CONNECT THE AREAS OF ACTIVITY CENTERS THROUGHOUT THE TOWN OF RIVERHEAD. | Transportation Enhancements | $3,158,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | DRAINAGE REPAIR / REPLACEMENT CONTRACT ON NY25A, NY102, SOUTHERN STATE PKWY AND ROBERT MOSES CAUSEWAY | Other | $781,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | PRIORITY SURFACE TREATMENT CONTRACT AT VARIOUS LOCATIONS ON RT 25A AND NORTHERN STATE PKWY | Pavement Improvement | $6,518,300 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | CONCRETE PAVEMENT REPAIR CONTRACT AT VARIOUS LOCATION ON MEADEOW BROOK PKWAY,SAGTICKOS PKWY,SOUTHERN STATE PKWY, WATAGH STATE PKWY AND OCEAN PKWY | Pavement Improvement | $1,894,701 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | STEEL BRIDGE PAINTING TO PROTECT STRUCTUREAL INTEGRITY IN TOWN OF ISLIP, BROOKHAVEN AND BABYLON | Bridge Improvement | $4,940,948 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | NASSAU AND SUFFOLK COUNTIES:ROUTES NY110, NY27A, NY24, NY25, AND NY102. PE FOR PAVEMENT REHABILITATION (1-6). | Other | $518,000 |
NEW YORK | NASSAU AND SUFFOLK COUNTIES:VARIOUS LOCATIONS. PE FOR LED REPLACEMENT BLOCK (TRAFFIC SIGNALS) (1-6). | Safety/Traffic Management | $100,000 | |
NEW YORK | REPLACING INCANDANCENT TRAFFIC SIGNALS WITH LED THAT ARE MORE ENERGY EFFICIENT ON FEDERAL AID HIGHWAYS IN NASSAU AND SUFFOLK COUNTY. | Safety/Traffic Management | $4,208,000 | |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | NASSAU & SUFFOLK COUNTIES:VARIABLE MESSAGE SIGN REPLACEMENT ON FEDERAL AID HIGHWAYS. PE (1-6). | Other | $100,000 |
NEW YORK | VARIABLE MESSAGE SIGN REPLACEMENT ON FEDERAL AID HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES | Safety/Traffic Management | $3,807,000 | |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | SUFFOLK COUNTY: CONCRETE PAVEMENT REPAIR CONTRACT, 908K SAGTIKOS PKWY, NY 231. PE PH 1-6. | Other | $109,000 |
NEW YORK | THIS PROJECT WILL MITIGATE ENVIRONMENTAL CONCERNS RESULTING FROM CONTAMINATION THAT OCCURRED FROM A DRAINAGE SYSTEM FAILURE ALONG NY25A AND WILL REPAIR AND INSTALL A NEW STORM WATER TREATMENT SYSTEM | Other | $1,047,717 | |
NEW YORK | ALBANY-SCHENECTADY-TROY | MAXWELL ROAD @ ALBANY SHAKER ROAD INTERSECTION, TOWN OF COLONIE, ALBANY COUNTY,Highway Reconstruction/Widening and Intersection Reconstruction | Pavement Widening | $5,921,200 |
NEW YORK | BIN 2260060) CLINTON STREET AND (BIN 2260070) SAUNDERS & DIVISION STREET BRIDGES OVER Delaware AND HUDSON RAILROAD, BRIDGE REPLACEMENT, Town and Village of Whitehall | Bridge Replacement | $4,696,000 | |
NEW YORK | BIN 3305570; CR3 WARRENSBURG RD./STONY CREEK, Town of Stony Creek, Bridge Replacement | Bridge Replacement | $1,458,010 | |
NEW YORK | ALBANY-SCHENECTADY-TROY | BRIDGE AVENUE BRIDGE OVER MOHAWK RIVER: BRIDGE REPLACEMENT, BIN 2200390, City of Cohoes, Albany County | Bridge Replacement | $7,463,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | 19TH STREET, FROM CITY OF WATERVLIET LINE TO CONGRESS STEET BRIDGE: RECONSTRUCTION | Pavement Improvement | $7,650,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | Reconstruction of DELAWARE AVENUE, FROM MADISON AVENUE TO THRUWAY BRIDG | Pavement Improvement | $14,897,612 |
NEW YORK | ALBANY-SCHENECTADY-TROY | Route 2, FROM 5TH AVENUE TO 11TH STREET: City of Troy, RECONSTRUCTION | Pavement Widening | $7,254,669 |
NEW YORK | CARETAKER BRIDGE OVER WALOOOMSAC RIVER, BIN 2201640, Town of Hoosick, Bridge Replacement | Bridge Replacement | $1,346,156 | |
NEW YORK | NEW BALTIMORE RD OVER HANNACROIS CREEK, NEW BALTIMORE, BRIDGE REPLACEMENT (BIN 3201340) | Bridge Replacement | $1,262,477 | |
NEW YORK | ALBANY-SCHENECTADY-TROY | CHURCH STREET (Route 9N), FROM WEST AVENUE TO NORTH VAN RENSSELaer Street, City of Saratoga Springs, Saratoga County (left turn lane, signals, drainage, curbs, sidewalks, streetlights and landscaping) | Pavement Improvement | $2,755,616 |
NEW YORK | BIN 3305560; TR13 GRISTMILL RD./STONY CREEK, WARREN CO., Town of Stony Creek, Bridge Replacement | Bridge Replacement | $1,017,426 | |
NEW YORK | COUNTY ROUTE 84, BLUE RIDGE ROAD, I87 TO COUNTY ROUTE 25, HIGHWAY RESURFACING (MILL AND FILL), TOWN OF ESSEX, ESSEX COUNTY | Pavement Improvement | $4,632,100 | |
NEW YORK | BAY STREET REHABILITATION, MULTI COURSE OVERLAY, CITY OF GLENS FALLS, WARREN COUNTY | Pavement Improvement | $2,889,596 | |
NEW YORK | DAY PECKINPAUGH CANAL MOTORSHIP MUSEUM. THIS PROJECT WILL CONVERT A HISTORIC 1921 CANAL MOTORSHIP INTO A FLOATING MUSEUM WITH EXHIBITS THAT WILL TRAVEL TO PORTS ACROSS NEW YORK STATE | Transportation Enhancements | $3,139,000 | |
NEW YORK | TICONDEROGA TRAIN TRESTLE CONVERSION AND HISTORIC TRAIL EXPANSION, TOWN OF TICONDEROGA, ESSEX COUNTY (TRANSPORTATION ENHANCEMENT PROJECT) | Transportation Enhancements | $325,000 | |
NEW YORK | ALBANY-SCHENECTADY-TROY | WASHINGTON AVENUE: FULLER ROAD TO I-90; JERMAIN STREET TO NORTH MAIN AVENUE; ONTARIO STREET TO LARK STREET, MILLING, PAVING AND AMERICANS WITH DISABILITIES ACT COMPLIANCE. | Pavement Improvement | $3,040,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | COUNTY ROAD 145 (OAKWOOD AVENUE); Near St. Peter\'s Cemetery TO TROY CITY LINE NORTH (at Highpointe Drive), CITY OF TROY, Town of Brunswick, Rensselaer County,RESURFACING AND AMERICANS WITH DISABILITI | Pavement Improvement | $880,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | RIVER ROAD / PROVIDENCE AVENUE RESURFACING AND AMERICANS WITH DISABILITIES ACT COMPLIANCE, RIVER ROAD/ROSENDALE ROAD TO GENERAL ELECTRIC CIRCLE; GENERAL ELECTRIC CIRCLE TO ROUTE 146; ROUTE 146 TO SCHE | Pavement Improvement | $1,440,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | ROSENDALE ROAD, RIVER ROAD TO ROUTE 7 NEAR UNION STREET, TOWN OF NISKAYUNA.RESURFACING AND AMERICANS WITH DISABILITIES ACT COMPLIANCE | Pavement Improvement | $373,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | VAN VRANKEN AVENUE: NOTT STREET TO MAXON ROAD, CITY OF SCHENECTADY, RESURFACING AND AMERICANS WITH DISABILITIES ACT COMPLIANCE | Pavement Improvement | $1,770,000 |
NEW YORK | ALBANY-SCHENECTADY-TROY | MALTA:COUNTY ROAD 108/DUNNING STREET FOR HIGHWAY RESURFACING/ADA COMPLIANCE. | Pavement Improvement | $464,000 |
NEW YORK | ATHENS:COUNTY ROUTE 28/ELM AVENUE FROM ROUTE 9W TO 2nd STREET FOR HIGHWAY RESURFACING/ADA COMPLIANCE. | Pavement Improvement | $572,000 | |
NEW YORK | HIGHWAY RESURFACING, ROUTE 5 AT VARIOUS LOCATIONS FROM WASHINGTON AVENUE (CITY OF SCHENECTADY) TO EAGLE STREET (CITY OF ALBANY). INSTALL SEVERAL BUS RAPID TRANSIT (BRT) STATIONS AND AMERICAN WITH DIS | Pavement Improvement | $6,470,044 | |
NEW YORK | PAVEMENT MAINTENANCE PAVING/RESURFACING ON VARIOUS FEDERAL AID HIGHWAYS IN ALBANY COUNTY (9.7 KM), RENSSELAER COUNTY (3.7 KM), SARATOGA COUNTY (24.9 KM), AND SCHENECTADY COUNTY (0.4 KM) | Pavement Improvement | $10,206,979 | |
NEW YORK | ALBANY-SCHENECTADY-TROY | SCHENECTADY TRAIL REHABILITATION, REHABILITATION OF THE EXISTING TRAIL FROM THE JAY STREET AREA IN THE CITY OF SCHENECTADY TO THE AREA NEAR THE NISKAYUNA SECTION OF THE TRAIL, SCHENECTADY COUNTY | Transportation Enhancements | $1,650,000 |
NEW YORK | RTE.169/CSX & ERIE CANAL (BIN 4050290); CITY OF LITTLE FALLS, Bridge Preventative Maintenance, bridge deck treatment | Bridge Improvement | $1,507,303 | |
NEW YORK | SYLVAN BEACH PEDESTRIAN CONNECTION PROJECT, ARRA TRANSPORTATION ENHANCEMENT PROJECT, VILLAGE OF SYLVAN BEACH, ONEIDA COUNTY | Transportation Enhancements | $731,000 | |
NEW YORK | MOHAWK STREET BEAUTIFICATION ENHANCEMENT PROJECT, ARRA TRANSPORTATION ENHANCEMENT PROJECT, VILLAGE OF HERKIMER, HERKIMER COUNTY | Transportation Enhancements | $800,000 | |
NEW YORK | MAIN STREET STREETSCAPE ENHANCEMENT PROJECT, ARRA TRANSPORTATION ENHANCEMENT PROJECT, VILLAGE OF DOLGEVILLE, HERKIMER COUNTY | Transportation Enhancements | $1,000,000 | |
NEW YORK | CHURCH AND MAIN STREETSCAPE ENHANCEMENT PROJECT, VILLAGE OF CANAJOHARIE, MONTGOMERY COUNTY | Transportation Enhancements | $1,000,000 | |
NEW YORK | BRIDGE PAINTING PROJECT 8 (including but not limited to BINs 1002180 1026220 1042210 1051241). | Bridge Improvement | $2,423,639 | |
NEW YORK | BRIDGE CLEANING PROJECT 8 | Bridge Improvement | $292,091 | |
NEW YORK | UTICA-ROME | PM PAVING PROJECT: RTS 5A & 69 | Pavement Improvement | $2,762,997 |
NEW YORK | UTICA-ROME | BRIDGE JOINT REPAIRS, VARIOUS LOCATIONS IN ONEIDA COUNTY (BINS, INCLUDING BUT NOT LIMITED TO, 1002341 1073730 1002322 1002321) | Bridge Improvement | $440,478 |
NEW YORK | BRIDGE PAINTING AT VARIOUS LOCATIONS IN FULTON, HERKIMER, MONTGOMERY AND ONEIDA COUNTIES. | Bridge Improvement | $2,657,480 | |
NEW YORK | PAVEMENT REHABILITATION, RT. 5S, HERKIMER COUNTY LINE TO SANDERS ROAD, TOWNS OF MINDEN, MONTGOMERY COUNTY AND RT. 29, VAIL MILLS TO SARATOGA COUNTY LINE, TOWNS OF MAYFIELD AND BROADALBIN, VILLAGE OF B | Pavement Improvement | $1,248,000 | |
NEW YORK | UTICA-ROME | RTS. 5S (MAIN STREET FRANKFORT TO RT. 51 ILION) AND 28 (RT. 8 TO COMSTOCK BRIDGE) AND RTS. 5S & 28 OVERLAP , PAVEMENT REHABILITATION, TOWNS OF FRANKFORT, GERMAN FLATTS, AND HERKIMER, VILLAGES OF HERKI | Pavement Improvement | $1,750,887 |
NEW YORK | UTICA-ROME | RTS. I790, 12, 233 AND 921W, PAVEMENT REHABILITATION, TOWNS OF BOONVILE, KIRKLAND, NEW HARTFORD, WESTMORELAND AND WHITESTOWN, VILLAGES OF BOONVILLE AND YORKVILLE, CITIES OF ROME AND UTICA, ONEIDA COUN | Pavement Improvement | $5,157,057 |
NEW YORK | PAVEMENT REHABILITATION (such as highway resurfacing) ON VARIOUS LOCAL ROADS (on the federal aid system) IN THE CITIES OF AMSTERDAM, GLOVERSVILLE, JOHNSTOWN AND LITTLE FALLS | Pavement Improvement | $3,863,869 | |
NEW YORK | Highway Resurfacing on Route 67 in the Towns of Amsterdam and Mohawk, Montgomery County (Vendor Placed Paving) | Pavement Improvement | $144,000 | |
NEW YORK | Highway Resurfacing on Routes 8, 12 and 20 in the Towns of Trenton, Stuben, Forestport, Cazenovia, Oneida County and the Town of Brookfield, Madison County (Vendor Placed Paving) | Pavement Improvement | $1,525,000 | |
NEW YORK | Highway Resurfacing on Route 12B in the Towns of Marshall, Kirkland, Oneida County and in the Towns of Madison and Augusta, Madison County (Vendor Placed Paving) | Pavement Improvement | $972,000 | |
NEW YORK | REPLACE THE RT.90 BRIDGES OVER LITTLE SALMON CREEK & PAINES CREEK, BIN 1034430 & 1034420, TOWNS OF LEDYARD AND GENOA, CAYUGA CO. | Bridge Replacement | $3,561,174 | |
NEW YORK | REPLACEMENT OF THE BARTELL RD. BRIDGE OVER I-81, BIN 1031740, TOWN OF CICERO, ONONDAGA CO. | Bridge Replacement | $6,791,356 | |
NEW YORK | SYRACUSE | RESURFACE I690 AND ITS SERVICE ROADS, BETWEEN NORTH CLINTON ST AND I481, CITY OF SYRACUSE, ONONDAGA CO | Pavement Improvement | $9,956,552 |
NEW YORK | SYRACUSE | RESURFACE RT 20, LAFAYETTE/POMPEY TOWN LN - MADISON CO LN, TOWN OF POMEY ONONDAGA CO., VENDOR PLACE PAVING PROJECT (VPP) | Pavement Improvement | $1,431,000 |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $514,000 | |
NEW YORK | ITHACA | RESURFACE RT 79, TIOGA CO LN TO BESNER HILL,TOWN OF CAROLINE TOMPKINS CO, VENDOR PLACE PAVING PROJECT (VPP) | Pavement Improvement | $1,434,000 |
NEW YORK | ITHACA | RT 79, ITHACA W CITY LN TO W BORDER OF TOMPKINS CO, TOWNS OF ITHACA AND ENFIELD,TOMPKINS CO, VENDOR PLACE PAVING PROJECT (VPP) | Pavement Improvement | $1,080,000 |
NEW YORK | OSWEGO CO: TOWN OF HANNIBAL. RESURFACE RT 34 FROM CAYUGA COUNTY LINE TO RT 104 FOR A VENDOR PLACE PAVING PROJECT. | Pavement Improvement | $529,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $445,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $940,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $960,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $1,207,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $900,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $900,000 | |
NEW YORK | REHABILITATION OF THE DORWIN AVE BRIDGE OVER THE ONONDAGA CREEK, BIN 2208280, CITY OF SYRACUSE, ONONDAGA CO. | Bridge Improvement | $1,415,000 | |
NEW YORK | SYRACUSE | TAFT RD.,SOUTH BAY TO NORTHERN BLVD., TOWNS OF CICERO AND CLAY, ONONDAGA CO. (RECONSTRUCTION) | Pavement Improvement | $8,434,943 |
NEW YORK | ITHACA | WARREN RD (CR 121), FROM RT 13 TO NORTH ASBURY RD, RECONSTRUCTION, VILLAGE AND TOWN OF LANSING, TOMPKINS CO. | Pavement Improvement | $5,313,433 |
NEW YORK | CR 114, BREWER RD/BLACK BROOK, BIN 3209700,REPLACEMENT, TOWN OF WATERLOO, SENECA CO. | Bridge Replacement | $415,000 | |
NEW YORK | 2009 CLEAN & PAINT BRIDGES IN CAYUGA, ONONDAGA, AND OSWEGO COUNTIES | Bridge Improvement | $1,949,980 | |
NEW YORK | ITHACA | COLUMBIA ST PEDESTRIAN BRIDGE REHABILITATION ENHANCEMENT PROJECT, CITY OF ITHACA, TOMPKINS CO. | Transportation Enhancements | $1,077,628 |
NEW YORK | TRUSTON DEPOT ALIVE AGAIN ENHANCEMENT PROJECT, TOWN OF TRUXTON, CORTLAND CO. (REHAB/PRESERVATION/ OPERATION OF HISTORIC BLDGS, LANDSCAPING) | Transportation Enhancements | $409,734 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $770,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $760,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $1,000,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $670,000 | |
NEW YORK | RESURFACE VARIOUS FEDERAL AID ROUTES IN RURAL LOCATIONS IN REG 3, (VPP) BLOCK Ê- 3VPP09 | Pavement Improvement | $1,200,000 | |
NEW YORK | BRIDGE REPAIRS JOB ORDER CONTRACT, VARIOUS LOCATIONS REGIONWIDE | Bridge Improvement | $2,204,260 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $211,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $582,000 | |
NEW YORK | ROCHESTER | HIGHWAY RESURFACING, RT. 15 FROM RT. 252 TO I390 (MAINTENANCE BY CONTRACT), TOWNS OF BRIGHTON AND HENRIETTA, MONROE COUNTY | Pavement Improvement | $1,981,778 |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $214,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $774,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $573,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $252,000 | |
NEW YORK | ROCHESTER | HIGHWAY RESURFACING, RT. 31F FROM RT. 250 TO COUNTY ROUTE 50 AND FROM COUNTY ROUTE 50 TO WAYNE COUNTY (MAINTENANCE BY CONTRACT), VILLAGE OF FAIRPORT, MONROE COUNTY. | Pavement Improvement | $1,226,967 |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $592,000 | |
NEW YORK | GENESEE VALLEY GREENWAY TRAIL BRIDGE OVER THE RIVER AT RT 36, New Pedestrian/Bicycle bridge, Towns of Mt. Morris and Leicester, Livingston County | Bridge Improvement | $1,875,479 | |
NEW YORK | RT 36 FROM STEUBEN TO RT 63 AND FROM RT 63 TO RT 436, Town of Dansville, Livingston County, Highway Resurfacing | Pavement Improvement | $664,113 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $728,000 | |
NEW YORK | RT. 39 EDGE DRAIN INSTALLATION, RT. 98 TO EAGLE RD., TOWNS OF ARCADE AND EAGLE, WYOMING COUNTY | Pavement Improvement | $728,106 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $558,000 | |
NEW YORK | ROCHESTER | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $647,000 |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $633,000 | |
NEW YORK | RT 77 FROM RT 20 TO Route 5; Rt. 33, Village Line to Village Line, Towns of Darien & Pembroke, Village of Corfu, Genesee County, Highway Resurfacing | Pavement Improvement | $2,910,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $540,000 | |
NEW YORK | ROCHESTER | HIGHWAY RESURFACING, RT. 9T, KREAG RD. TO RT. 64, TOWNS OF PERINTON AND PITTSFORD, MONROE COUNTY | Pavement Improvement | $940,000 |
NEW YORK | HIGHWAY RESURFACING, RT. 96 FROM RT. 88 TO LESTER ROAD IN THE VILLAGE OF PHELPS (MAINTENANCE BY CONTRACT), VILLAGE OF PHELPS, ONTARIO COUNTY | Pavement Improvement | $464,099 | |
NEW YORK | ROCHESTER | RT. 98, RT. 5 (MAIN ST.) TO NOONAN DRIVE, CITY OF BATAVIA, GENESEE COUNTY - HIGHWAY RESURFACING | Pavement Improvement | $528,133 |
NEW YORK | ROCHESTER | RESURFACING ON ROUTE 104 FROM ROUTE 259 TO ROUTE 261, TOWNS OF GREECE AND PARMA, MONROE COUNTY | Pavement Improvement | $1,320,000 |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $106,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $1,032,000 | |
NEW YORK | ROCHESTER | RESURFACE RT 259 FROM COLBY ST TO BIG RIDGE RD, VILLAGE OF SPENCERPORT AND TOWN OF OGDEN, MONROE CO. | Pavement Improvement | $1,406,970 |
NEW YORK | ROCHESTER | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $236,000 |
NEW YORK | NEW YORK-NORTHEASTERN NJ (NJ) | NY112 RECONDITIONING AND PRESERVATION FROM PINE RD. TO NY347 | Pavement Improvement | $49,166,000 |
NEW YORK | ROCHESTER | Rt. 332 (Main St.)/RT. 942T (S. MAIN ST.), CHAPEL ST. TO RT. 5 AND RT. 20 TO LAKE SHORE DRIVE, CITY OF CANANDAIGUA, ONTARIO COUNTY, HIGHWAY RESURFACING | Pavement Improvement | $1,792,000 |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $967,000 | |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $522,000 | |
NEW YORK | ROCHESTER | I390 FROM THE NEW YORK STATE THRUWAY TO THE I590 SPLIT - TOWN OF HENRIETTA, MONROE COUNTY, PREVENTATIVE MAINTENANCE RESURFACING | Pavement Improvement | $2,372,993 |
NEW YORK | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $402,000 | |
NEW YORK | ROCHESTER | RT 531 FROM RT 36 TO I490 HIGHWAY RESURFACING, TOWNS OF GATES AND OGDEN, MONROE COUNTY | Pavement Improvement | $2,430,400 |
NEW YORK | ROCHESTER | CRACK SEALING AT VARIOUS LOCATIONS IN GENESEE AND MONROE COUNTIES | Pavement Improvement | $263,924 |
NEW YORK | ROCHESTER | BRIDGE WASHING AND DECK SEALING AT VARIOUS LOCATIONS REGIONWIDE | Bridge Improvement | $525,076 |
NEW YORK | ROCHESTER | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $478,000 |
NEW YORK | ROCHESTER | RESURFACING OF VARIOUS FA ROUTES REGIONWIDE - 4VPP01 | Pavement Improvement | $713,000 |
NEW YORK | HIGHWAY RESURFACING, COUNTY ROUTE 19 (TOWNLINE ROAD), RT. 33 TO HAWLEY DRIVE AND COUNTY ROUTE 48 (HAWLEY DRIVE), BANK STREET TO BATAVIA-STRAFFORD TOWN LINE ROAD, TOWN OF BATAVIA, GENESEE COUNTY. | Pavement Improvement | $860,000 | |
NEW YORK | HIGHWAY RESURFACING, COUNTY ROUTE 33 (SILKER HILL ROAD), FROM NEW YORK STATE ROUTE 15 TO SOUTH MCMILLAN CREEK; ALSO COUNTY ROUTE 64 FROM NEW YORK STATE ROUTE 36 TO NEW YORK STATE ROUTE 39, TOWNS OF CO | Pavement Improvement | $1,601,310 | |
NEW YORK | DANSVILLE:HIGHWAY RESURFACING ON MAPLE STREET (RT 63-RT 36), COTTAGE ST (RT 256-PARK AVE), & MOREY AVENUE (RT 63-RT 256). | Pavement Improvement | $370,000 | |
NEW YORK | GENESEO:HIGHWAY RESURFACING ON LIMA ROAD FROM NORTH STREET TO THE GENESEO VILLAGE LINE. | Pavement Improvement | $285,000 | |
NEW YORK | ROCHESTER | BRIDGE PREVENTATIVE MAINTENANCE, Drive Park (2211310), East Main St. (2211350), Main St. (2211270), Court St. (2211250), Elmwood Ave. (4025890), Lake Ave. (2211370), Andrews St. (2211280), Ford St. (4 | Bridge Improvement | $2,002,000 |
NEW YORK | ROCHESTER:HIGHWAY RESURFACING AND CORRIDOR ENHANCMENTS ON VARIOUS FEDERAL AID HIGHWAYS. | Pavement Improvement | $2,549,000 | |
NEW YORK | ROCHESTER | STREETSCAPE, NORTH CLINTON AVE. 1. Crosswalks, Reconstruction of 2 intersections. 2. Spot sidewalk & curb replacement. 3. Lighting & landscaping. 4. Bus shelters. 5. Gateway signs. 6. Upgra | Other | $1,100,000 |
NEW YORK | ROCHESTER | HIGHWAY RESURFACING,COLD WATER RD.,TOWN OF CHILI; ELMGROVE RD.,TOWN OF GATES; STONEY POINT RD.,TOWN OF OGDEN; CURTIS RD.,TOWN OF PARMA;NORTH GREECE RD.,TOWN OF GREECE;EAST RIVER RD I.,TOWN OF RUSH; A | Pavement Improvement | $3,555,000 |
NEW YORK | HIGHWAY RESURFACING; DEWEY AVENUE; LONG POND ROAD; ENGLISH ROAD; EAST RIDGE ROAD; NORTH GOODMAN STREET; THOMAS AVENUE; CULVER ROAD; PANORAMA TRAIL; OLD RIDGE ROAD; MONROE COUNTY | Pavement Improvement | $6,104,500 | |
NEW YORK | ROCHESTER | MONROE CO DECK SEALING FLYNN ROAD BRIDGE, BIN 3317590;BRICK SCHOOLHOUSE RD. BRIDGE, BIN 3361660 PANORAMA TRAIL BRIDGE, BIN 1095720. BRIDGE PAINTING REDMAN RD. BRIDGE, BIN3317650;NO HAMLIN RD BRIDGE, B | Bridge Improvement | $560,000 |
NEW YORK | CANANDAIGUA:HIGHWAY RESURFACING ON LAKESHORE DRIVE FROM MUAR STREET TO SOUTH MAIN STREET. | Pavement Improvement | $160,000 | |
NEW YORK | ROCHESTER | CANDAIGUA:WEST AVENUE OVER SUCKER BROOK FOR BRIDGE REPLACEMENT. | Bridge Replacement | $556,600 |
NEW YORK | HIGHWAY RESURFACING, COUNTY RD 41 FROM RT. 332 TO COUNTY RD 8, TOWN OF FARMINGTON, ONTARIO COUNTY;AND COUNTY RD 6 FROM COUNTY RD 4 TO ROUTES 5 & 20, TOWN OF GENEVA, ONTARIO COUNTY; AND BANKERT RD., FR | Pavement Improvement | $2,790,000 | |
NEW YORK | SIGN REPLACEMENT PROGRAM, TOWNS OF ALBION,BARRE, CARLTON, CLARENDON, GAINES, KENDALL, MURRAY,RIDGEWAY,SHELBY AND YATES, ORLEANS COUNTY | Other | $200,000 | |
NEW YORK | NEWARK & ARCADIA:VAN BUREN STREET OVER CSX RAILROAD FOR BRIDGE REHABILITATION. | Bridge Improvement | $475,000 | |
NEW YORK | HIGHWAY RESURFACING, LAKE BLUFF RD. (COUNTY ROAD 72) FROM RT. 104 TO RIDGE ROAD, TOWN OF SODUS; AND NEWARK MARION ROAD (COUNTY ROAD 220), LYON ROAD TO THE GRAVEL PIT, TOWN OF PALMYRA, WAYNE COUNTY | Pavement Improvement | $177,000 | |
NEW YORK | SODUS:HIGHWAY RESURFACING ON COUNTY ROAD 103/RIDGE ROAD FROM EAST WILLIAMSON HAMLET TO VAN SLYKE ROAD. | Pavement Improvement | $418,000 | |
NEW YORK | HIGHWAY RESURFACING, ATLANTIC AVE. (COUNTY ROAD 23) FROM DOWNS ROAD TO RT. 350, TOWN OF WALWORTH, WAYNE COUNTY | Pavement Improvement | $135,000 | |
NEW YORK | WILLIAMSON:RIDGE ROAD SIDEWALK REPLACEMENT. | Transportation Enhancements | $80,000 | |
NEW YORK | HIGHWAY RESURFACING, BIXBY HILL RD. (COUNTY ROAD 59) FROM RT. 39 TO CATTARAUGUS COUNTY, TOWN OF ARCADE, WYOMING COUNTY | Pavement Improvement | $700,000 | |
NEW YORK | ROCHESTER | ROCHESTER:LAKE AVENUE PREVENTIVE BRIDGE MAINTENANCE OVER CSXT. | Bridge Improvement | $80,000 |