3.0 reduce_epd_by_percentage_for_peak_hours d8b88a6d-a5ec-4187-844f-0ac050979aab 9fb17ece-5c39-43fd-ad78-afa49f651171 20210915T221935Z 8FF5BF06 ReduceEPDByPercentageForPeakHours Reduce EPD by Percentage for Peak Hours This measure reduces electric equipment loads by a user-specified percentage for a user-specified time period (usually the peak hours). The reduction can be applied to at most three periods throughout out the year specified by the user. This is applied throughout the entire building. The original schedules for equipment in the building will be found and copied. The copies will be modified to have the percentage reduction during the specified hours, and be applied to the specified date periods through out the year. The rest of the year will keep using the original schedules. epd_reduce_percent Percentage Reduction of Electric Equipment Power (%) Enter a value between 0 and 100 Double true false 50 start_time Start Time for the Reduction In HH:MM:SS format String false false 17:00:00 end_time End Time for the Reduction In HH:MM:SS format String false false 21:00:00 alt_periods Use alternative default start and end time based on the climate zone of the model? This will overwrite the star and end time you input Boolean false false false true true false false start_date1 First start date for the Reduction In MM-DD format String false false 03-01 end_date1 First end date for the Reduction In MM-DD format String false false 05-01 start_date2 Second start date for the Reduction (optional) Specify a date in MM-DD format if you want a second period of reduction; leave blank if not needed. String false false end_date2 Second end date for the Reduction Specify a date in MM-DD format if you want a second period of reduction; leave blank if not needed. If either the start or end date is blank, the period is considered not used. String false false start_date3 Second start date for the Reduction (optional) Specify a date in MM-DD format if you want a third period of reduction; leave blank if not needed. String false false end_date3 Second end date for the Reduction Specify a date in MM-DD format if you want a third period of reduction; leave blank if not needed. If either the start or end date is blank, the period is considered not used. String false false Equipment.Electric Equipment Intended Software Tool Apply Measure Now string Intended Software Tool OpenStudio Application string Intended Software Tool Parametric Analysis Tool string Measure Type ModelMeasure string Intended Software Tool OpenStudio Application string Intended Software Tool Parametric Analysis Tool string LICENSE.md md license CD7F5672 README.md.erb erb readmeerb 703C9964 example_model.osm osm test 53D14E69 reduce_epd_by_percentage_for_peak_hours_copy_test.rb rb test C3AF76E0 OpenStudio 3.1.0 3.1.0 measure.rb rb script 9AD49EEE README.md md readme 4E787ECA