Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
FLORIDA | FORT MYERS-CAPE | CULVERT REPLACEMENT CARREL ROAD NEAR GLENN DRIVE;REPLACE OR WIDEN BR CULVERT;CONSTRUCTION;LAP | Pavement Improvement | $300,000 |
FLORIDA | HOLMES BOULEVARD FROM 54TH STREET TO 66TH STREET;SIDEWALK;CONSTRUCTION | Transportation Enhancements | $62,020 | |
FLORIDA | PALM DRIVE FROM 66TH STREET TO 85TH STREET;SIDEWALK;CONSTRUCTION | Transportation Enhancements | $14,181 | |
FLORIDA | 85TH STREET FROM GULF DRIVE TO MARINA DRIVE;SIDEWALK;CONSTRUCTION | Transportation Enhancements | $19,373 | |
FLORIDA | 22ST AVENUE WEST FROM 26TH STREET WEST TO 27TH STREET WEST;SIDEWALK;CONSTRUCTION SUPPORT | Transportation Enhancements | $36,866 | |
FLORIDA | SARASOTA-BRADENTON | 27TH STREET WEST FROM 23RD AVENUE WEST TO 22ND AVENUE WEST;SIDEWALK;CONSTRUCTION | Transportation Enhancements | $72,034 |
FLORIDA | SARASOTA-BRADENTON | 23RD AVENUE WEST FROM 26TH STREET WEST TO 27TH STREET WEST;SIDEWALK;CONSTRUCTION SUPPORT | Transportation Enhancements | $20,380 |
FLORIDA | 21ST AVENUE WEST FROM 30TH STREET WEST TO 34TH STREET WEST;SIDEWALK;CONSTRUCTION | Transportation Enhancements | $91,945 | |
FLORIDA | FORT MYERS-CAPE | BUCKINGHAM ROAD FROM SR 82 TO NEAL ROAD;BIKE LANE/SIDEWALK;CONSTRUCTION;LAP | Pavement Improvement | $799,999 |
FLORIDA | FORT MYERS-CAPE | CR 865- DANIELS PKWY AT BELL TOWER BOULEVARD;ADD TURN LANE(S);CONSTRUCTION;LAP | Pavement Improvement | $600,000 |
FLORIDA | FORT MYERS-CAPE | SANIBEL CAUSEWAY (SUMMERLIN ROAD) BIKE LANE;BIKE LANE/SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $535,969 |
FLORIDA | FORT MYERS-CAPE | SUNSHINE BOULEVARD AT CR 884 (LEE BLVD);ADD TURN LANE(S);CONSTRUCTION;LAP | Pavement Improvement | $500,000 |
FLORIDA | FORT MYERS-CAPE | HOMESTEAD ROAD SOUTH AT MILWAULKEE BOULEVARD;ADD TURN LANE(S);CONSTRUCTION;LAP | Safety/Traffic Management | $100,000 |
FLORIDA | JACKSONVILLE | SR 212 (BEACH BLVD) FROM HODGES BLVD TO SAN PABLO;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | Pavement Widening | $29,834,384 |
FLORIDA | SR 23 (BFCR) OVERPASS @ PLANTATION OA BLVD.;NEW ROAD CONSTRUCTION;CONSTRUCTION;DB | Pavement Widening | $14,671,695 | |
FLORIDA | SR 200 (A1A) FROM STRATTON ROAD TO GRIFFIN ROAD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | Pavement Widening | $56,634,327 | |
FLORIDA | OCALA | NE 36TH AVE FROM NE 14TH STREET TO NE 35TH STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $551,159 |
FLORIDA | OCALA | NE 25TH AVE FROM NE 24TH ST TO NE 35TH ST;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $133,985 |
FLORIDA | OCALA | ML KING AVE FROM NW 22ND ST TO NW 35TH ST;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $226,790 |
FLORIDA | OCALA | SE 18TH AVENUE FROM SE 21ST LANE TO SE 31ST STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $159,918 |
FLORIDA | ORLANDO | LAKE MARY BOULEVARD FROM MARKHAM WOODS ROAD TO RINEHART ROAD;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $1,270,000 |
FLORIDA | ORLANDO | RINEHART ROAD FROM 46A TO LAKE MARY BLVD;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $578,000 |
FLORIDA | ORLANDO | HOWELL BRANCH RD FROM SEMINOLE CO LINE TO SR 436;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $600,000 |
FLORIDA | ORLANDO | INTERNATIONAL PKWY FROM SR 46A TO AAA BLVD;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $360,507 |
FLORIDA | ORLANDO | WEST 25TH ST (CR46A) FROM E OLD LAKE MARY RD TO US 17/92;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $1,176,000 |
FLORIDA | TAMPA-ST.PETERSBURG-CLEARWATER,FL | I-4/SELMON EXPRESSWY FROM S OF SELMON EXPRSSW TO I-4;INTERCHANGE (NEW);CONSTRUCTION | New Construction | $105,004,102 |
FLORIDA | TAMPA-ST.PETERSBURG-CLEARWATER,FL | US 19 (SR 55) FROM N OF WHITNEY RD TO N OF SR 60;INTERCHANGE (NEW);CONSTRUCTION | Pavement Widening | $44,990,142 |
FLORIDA | MELBOURNE-COCOA | I-95 FROM S OF SR514 (MALABAR TO PALM BAY RD;ADD LANES & REHABILITATE PVMN;CONSTRUCTION;DB | Pavement Widening | $40,228,654 |
FLORIDA | LEESBURG-EUSTIS | SR 25 (US 27) FROM 1000'N LAKE LOUISA TO N OF CLUSTER OAK DR;ADD LANES & REHABILITATE PVMN;CONSTRUCTION;DB | Pavement Widening | $38,044,947 |
FLORIDA | OCALA | SR 35 (BASELINE RD) FROM S CR464(MARICAMP RD TO SR 40;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | Pavement Widening | $49,051,059 |
FLORIDA | ORLANDO | SR 50 FROM W OF AVALON RD SR 429 (WESTERN BELTWAY);ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | Pavement Widening | $35,128,657 |
FLORIDA | ORLANDO | SR 434 FROM SR 414 (MAITLAND BLVD) TO LOTUS LANDING BLVD;ADD LANES & RECONSTRUCT;CONSTRUCTION;DB | Pavement Widening | $6,790,000 |
FLORIDA | SARASOTA-BRADENTON | 10TH STREET WEST FROM 14TH AVENUE WEST TO 8TH AVENUE WEST;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $96,873 |
FLORIDA | SARASOTA-BRADENTON | CATTLEMAN ROAD FROM BHIA VISTA STREET T SR 780 S OF FRUITVILLE R;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $395,068 |
FLORIDA | SARASOTA-BRADENTON | VENICE AVENUE AT HARBOR DRIVE;INTERSECTION (MODIFY);CONSTRUCTION;LAP | Pavement Improvement | $455,000 |
FLORIDA | SARASOTA-BRADENTON | SR 758 (SIESTA DR) FROM HENSON BAYOO BRIDGE TO SIESTA KEY BRIDGE;DRAINAGE IMPROVEMENTS;CONSTRUCTION;LAP | Pavement Improvement | $1,053,068 |
FLORIDA | SARASOTA-BRADENTON | UNIVERSITY PARKWAY FROM US 41 TO OLD US 301;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $753,068 |
FLORIDA | SARASOTA-BRADENTON | UNIVERSITY PARKWAY FROM US 301 TO I-75;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $3,189,595 |
FLORIDA | SARASOTA-BRADENTON | UNIVERSITY PARKWAY FROM US 301 TO I-75;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $2,148,068 |
FLORIDA | OCALA | MARION OAKS SIDEWALK ON MARION OAKS DR, MARIO OAKS BLVD,MARION OAK LN;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $843,000 |
FLORIDA | OCALA | NE/SE 36TH AVENUE FROM SE 31ST STREET TO NE 14TH STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $1,531,987 |
FLORIDA | ORLANDO | CROSS SEMINOLE TRAIL OVER HOWELL CREEK MULTI-USE TRAIL;PEDESTRIAN/WILDLIFE OVERPASS;CONSTRUCTION;LAP | Transportation Enhancements | $1,250,000 |
FLORIDA | ORLANDO | INTERNATIONAL PKWY FROM AAA BLVD TO LAKE MARY BLVD;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $427,297 |
FLORIDA | MIAMI-HIALEAH, FL | SR 5/US-1 FROM 4.6 MI N OF C-111 C TO 2.3MI S OF CARD SND R;FLEXIBLE PAVEMENT RECONSTRUCT;CONSTRUCTION | Pavement Improvement | $19,989,043 |
FLORIDA | SR 5/OVRSEAS HRT.TRL LOWER SUGARLOAF HISTORIC BRIDGE AT MM 15.5;BIKE PATH/TRAIL;CONSTRUCTION;LAP | Transportation Enhancements | $843,134 | |
FLORIDA | BAYPOINT BR. #904140 AT PALM DRIVE (SADDLEBUNCH KEY);BRIDGE-REPAIR/REHABILITATION;CONSTRUCTION;LAP | Bridge Improvement | $296,620 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | NW 121 WAY/BR#876300 FROM NW SOUTH RIVER DRIV TO OKEECHOBEE ROAD;BRIDGE REHABILITATION;CONSTRUCTION;LAP | Bridge Improvement | $25,491 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 56 STREET FROM S.W. 67 AVENUE TO S.W. 57 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $210,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 72 AVENUE FROM S.W. 85 STREET TO S.W. 72 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $300,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | MIAMI-DADE CO COMMSN DISTRICT 1 - ADA BUS STO ACCESS(VARIOUS LOCATIONS;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION;LAP | Transportation Enhancements | $162,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | MIAMI-DADE CO COMMSN DISTRICT 4 - ADA BUS STO ACCESS(VARIOUS LOCATIONS;PEDESTRIAN SAFETY IMPROVEMENT;CONSTRUCTION;LAP | Transportation Enhancements | $220,000 |
FLORIDA | CAROLINE STREET FROM TELEGRAPH LANE TO MARGARET STREET (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $117,000 | |
FLORIDA | EATON STREET FROM WHITEHEAD STREET TO PEACON LANE (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $117,000 | |
FLORIDA | WILLIAM STREET FROM CAROLINE STREET TO LAZY WAY LANE (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $63,750 | |
FLORIDA | TWELFTH STREET FROM FLAGLER AVENUE T K-MART/PATTERSON ST.(ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $34,000 | |
FLORIDA | VIRGINA STREET FROM WINDSOR LANE TO JOSE MARTI DRIVE (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $212,500 | |
FLORIDA | APPLEROUTH LANE FROM WHITEHEAD STREET TO DUVAL STREET (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $27,625 | |
FLORIDA | TELEGRAPH LANE FROM CAROLINE STREET TO GREENE STREET (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $68,000 | |
FLORIDA | DUCK AVENUE FROM 14TH STREET TO 20TH AVENUE (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $552,500 | |
FLORIDA | WHITEHEAD STREET AT PETRONIA STREET (ADA);SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $52,000 | |
FLORIDA | EISENHOWER DRIVE FROM PALM AVENUE TO TRUMAN AVENUE (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $110,500 | |
FLORIDA | LEON STREET FROM CATHERINE STREET TO FLAGLER AVENUE (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $221,000 | |
FLORIDA | UNITED STREET FROM PEARL STREET TO GEORGE STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $418,466 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SR 915/NE 6 AVENUE FROM NE 113 STREET TO NE 121 STREET;LANDSCAPING;CONSTRUCTION | Transportation Enhancements | $74,073 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | NE 87 STREET FROM NE 2 AVENUE TO NE 4 ROAD;RESURFACING;CONSTRUCTION | Pavement Improvement | $51,650 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | NW 67 AVE/LUDLAM RD FROM NW 38 TERRACE TO NW 40 STREET;DRAINAGE IMPROVEMENTS;CONSTRUCTION | Pavement Improvement | $47,780 |
FLORIDA | PENSACOLA | SR 95 (US 29) FROM SOUTH OF JACKSON ST TO NORTH OF COTTAGE ST;DRAINAGE IMPROVEMENTS;AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $500,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | CITY OF NO MIAMI BCH CITYWIDE SIDEWALKS (VARIOUS LOCATIONS);SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $112,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | MIAMI-DADE CO COMMSN DISTRICT 9 - ILLUMINATE SIGNS (VARIOUS LOCATIONS;TRAFFIC SIGNAL UPDATE;CONSTRUCTION;LAP | Safety/Traffic Management | $400,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | MIAMI-DADE CO COMMSN D9 - PAVEMENT MARKING @ VARIOUS LOCATIONS;SIGNING/PAVEMENT MARKINGS;CONSTRUCTION;LAP | Safety/Traffic Management | $186,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | MIAMI-DADE CO COMMSN D4 - PAVEMENT MARKING @ VARIOUS LOCATIONS;SIGNING/PAVEMENT MARKINGS;CONSTRUCTION;LAP | Safety/Traffic Management | $150,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | MIAMI-DADE CO COMMSN D2 - PAVEMENT MARKING @ VARIOUS LOCATIONS;SIGNING/PAVEMENT MARKINGS;CONSTRUCTION;LAP | Safety/Traffic Management | $442,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 212 STREET FROM SW 122 AVENUE TO SW 119 AVENUE;GUARDRAIL;CONSTRUCTION;LAP | Safety/Traffic Management | $105,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | PALM AVENUE FROM 45TH STREET TO 47TH STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $381,655 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | WEST 53RD STREET FROM WEST 8TH AVENUE TO WEST 4TH AVENUE;FLEXIBLE PAVEMENT RECONSTRUCT;CONSTRUCTION;LAP | Pavement Improvement | $1,505,033 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | WEST 53RD STREET FROM WEST 12TH AVENUE TO WEST 8TH AVENUE;FLEXIBLE PAVEMENT RECONSTRUCT;CONSTRUCTION;LAP | Pavement Improvement | $1,159,125 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | EAST 4TH AVENUE FROM EAST 25TH STREET TO EAST 32ND STREET;FLEXIBLE PAVEMENT RECONSTRUCT;CONSTRUCTION;LAP | Pavement Improvement | $1,611,511 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | WEST 29TH STREET FROM SR 25/OKEECHOBEE RD TO WEST 4TH AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $507,800 |
FLORIDA | MILTON AVENUE FROM BALTZELL TO SR 10 (US 90);RESURFACING;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $306,898 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 32 AVENUE FROM N.W. 199 STREET TO N.W. 183 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $210,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 17 AVENUE FROM N.W. 79 STREET TO N.W. 71 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $283,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 32 AVENUE FROM N.W. 54 STREET TO N.W. 46 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $283,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.E. 61/62 STREET FROM N. MIAMI AVENUE TO US-1 (BISCAYNE);RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $362,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | IVES DAIRY ROAD FROM HIGHLAND LAKES BLVD TO N.E. 24 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $395,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 24 STREET FROM SW 57 AVENUE TO SW 42 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $321,126 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | NW 67 AVENUE FROM W. FLAGLER STREET TO TAMIAMI CANAL DRIVE;RESURFACING;CONSTRUCTION | Pavement Improvement | $42,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | NW 7 STREET FRM NW 87 AVENUE TO NW 82 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $198,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | WEST FLAGLER STREET FROM WEST 92 AVENUE TO WEST 87 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $260,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 72 STREET FROM SW 57 AVENUE TO OLD CUTLER RD;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $480,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 80 STREET FROM S.W. 57 AVENUE TO S.W. 47 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $185,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 168 STREET FROM SW107 AVENUE TO SW 97 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $250,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 187 AVENUE FROM SW 344 STREET TO SW 320 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $378,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 320 STREET FROM SW 192 AVENUE TO SW 177 AVENUE`1;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $390,000 |
FLORIDA | GREENWAY X-ING GRADE 475A,475B,95TH & 25TH ST UN-PASSES @ CR 475 & 484;BIKE PATH/TRAIL;CONSTRUCTION;LAP | Transportation Enhancements | $2,000,000 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 328 STREET FROM S.W. 137 AVENUE TO S.W. 117 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $340,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 288 STREET FROM SR 821/FL TURNPIKE TO S.W. 132 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $420,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 137 AVENUE FROM S.W. 42 STREET TO S.W. 26 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $672,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 7 STREET FROM N.W. 114 AVENUE TO N.W. 107 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $384,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 25 STREET AT N.W.107 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $192,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 95 STREET FROM N.W. 36 AVENUE TO N.W. 33 AVENUE;DRAINAGE IMPROVEMENTS;CONSTRUCTION;LAP | Pavement Improvement | $236,429 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 58 STREET FROM N.W. 95 AVENUE TO N.W. 87 AVENUE;DRAINAGE IMPROVEMENTS;CONSTRUCTION;LAP | Pavement Improvement | $277,951 |
FLORIDA | TALLAHASSEE | CR 155 MERIDIAN RD @ CR 0342 BANNERMAN RD & CR 0346 OX BOTTOM RD INTERSECTIONS; LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $889,431 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 328 STREET FROM S.W. 167 AVENUE TO S.W. 137 AVENUE;LIGHTING;CONSTRUCTION;LAP | Safety/Traffic Management | $1,345,064 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | PALM DRIVE/SW 344 ST FROM SR 5/US-1 TO SW 167 AVENUE;LIGHTING;CONSTRUCTION;LAP | Safety/Traffic Management | $230,754 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 72 ST/SUNSET DR. FROM S.W. 65 AVENUE TO S.W. 63 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $253,166 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 162 AVENUE FROM SW 78 STREET TO SW 75 STREET;GUARDRAIL;CONSTRUCTION;LAP | Safety/Traffic Management | $15,240 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 132 AVENUE FROM SW 17 STREET TO SW 13 STREET;GUARDRAIL;CONSTRUCTION;LAP | Safety/Traffic Management | $50,415 |
FLORIDA | SOUTHARD STREET FROM GRINNELL STREET TO BAHAMA STREET (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $143,000 | |
FLORIDA | FLEMING STREET FROM NASSAU LANE TO BAHAMA STREET (ADA;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $156,000 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | LEHMAN CSWY PATH FROM W. COUNTRY CLUB DR. TO E. COUNTRY CLUB DR.;BIKE PATH/TRAIL;CONSTRUCTION;LAP | Transportation Enhancements | $452,788 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 78 STREET FROM SW 163 AVENUE TO SW 162 AVENUE;GUARDRAIL;CONSTRUCTION;LAP | Safety/Traffic Management | $20,745 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 56 STREET FROM SW 162 AVENUE TO SW 157 AVENUE;GUARDRAIL;CONSTRUCTION;LAP | Safety/Traffic Management | $39,600 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 109 AVENUE FROM S.W. 8 STREET TO WEST FLAGLER STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $322,621 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | CITY OF WEST MIAMI FROM S.W. 64 AVENUE @ S.W. 22 STREET;INTERSECTION (MODIFY);CONSTRUCTION;LAP | Safety/Traffic Management | $38,540 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | CITY OF WEST MIAMI FROM S.W. 64 AVENUE @ S.W. 18 STREET;INTERSECTION (MODIFY);CONSTRUCTION;LAP | Safety/Traffic Management | $39,163 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | CITY OF WEST MIAMI FROM S.W. 64 AVENUE @ S.W. 14 STREET;INTERSECTION (MODIFY);CONSTRUCTION;LAP | Safety/Traffic Management | $51,110 |
FLORIDA | MIAMI-HIALEAH, FL | S.W. 114 AVENUE FROM S.W. 7 TERRACE TO WEST FLAGLER STREET;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $180,725 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 120 STREET FROM S.W. 147 AVENUE TO S.W. 137 AVENUE;SIDEWALK;CONSTRUCTION;LAP | Safety/Traffic Management | $88,184 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 127 AVENUE FROM CORAL WAY TO S.W. 8 STREET;SIDEWALK;CONSTRUCTION;LAP | Safety/Traffic Management | $30,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 72 STREET FROM S.W. 157 AVENUE TO S.W. 152 AVENUE;SIDEWALK;CONSTRUCTION;LAP | Safety/Traffic Management | $30,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | COLLINS AVENUE FROM N.W. 171ST STREET TO N.W. 183RD STREET;SIDEWALK;CONSTRUCTION;LAP | Transportation Enhancements | $456,640 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.E. 19TH AVENUE FROM N.E. 171 STREET TO N.E. 183 STREET;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $813,438 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 192 STREET FROM SW 197 AVENUE TO SW 187 AVENUE;GUARDRAIL;CONSTRUCTION;LAP | Safety/Traffic Management | $155,000 |
FLORIDA | FORT WALTON BEACH | WRIGHT PKWY FROM US 98 MIRACLE STRIP PKWY TO HOLLYWOOD BLVD & BAY DR SE FROM BAY DR SE TO BAY DR NE;LAP;(ARRA) | Pavement Improvement | $432,798 |
FLORIDA | CITY OF BLOUNTSTOWN PAVEMENT MARKINGS;SAFETY PROJECT;LAP; AMERICAN RECOVERY & REINVESTMENT (ARRA) | Safety/Traffic Management | $55,000 | |
FLORIDA | GADSDEN COUNTY PAVEMENT MARKINGS;SAFETY PROJECT;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $500,000 | |
FLORIDA | TALLAHASSEE | GADSDEN COUNTY PAVEMENT MARKINGS;SAFETY PROJECT;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $596,702 |
FLORIDA | CR 30A FROM SR 30E CAPE SAN BLAS ROAD TO APPROX. 0.3 MILE EAST;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $170,000 | |
FLORIDA | HOLMES COUNTY PAVEMENT MARKINGS;SAFETY PROJECT;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $450,000 | |
FLORIDA | LIBERTY COUNTY GUARDRAIL;SAFETY PROJECT;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $228,445 | |
FLORIDA | FORT WALTON BEACH | HOLLYWOOD BLVD FROM HILL AVENUE TO MARY ESTHER BLVD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $2,450,653 |
FLORIDA | FORT WALTON BEACH | SCENIC HIGHWAY US 98 RECONSTRUCTION AND LANDSCAPING;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) | Pavement Improvement | $760,955 |
FLORIDA | WAKULLA COUNTY;SAFETY PROJECT;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $200,000 | |
FLORIDA | FORT WALTON BEACH | CR 30A BIG REDFISH LAKE PEDESTRIAN BRIDGE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $569,900 |
FLORIDA | WASHINGTON COUNTY PAVEMENT MARKINGS;SAFETY PROJECT;LAP; AMERICAN RECOVERY & REINVESTMENT (ARRA) | Safety/Traffic Management | $480,000 | |
FLORIDA | STATE PARK RD SR 77 FALLING WATERS ENTRANCE;RESURFACING;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $240,000 | |
FLORIDA | SOMBRERO BEACH ROAD FROM END OF ROADWAY TO AVENIDA PRIMICERA;FLEXIBLE PAVEMENT RECONSTRUCT;CONSTRUCTION;LAP | Pavement Improvement | $1,010,000 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | HARBOR DRIVE FROM WEST MASHTA DRIVE TO CYPRESS DRIVE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $105,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | HARBOR DRIVE FROM WEST MCINTYRE DRIVE TO CYPRESS DRIVE;LIGHTING;CONSTRUCTION;LAP | Safety/Traffic Management | $156,587 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | N.W. 22ND AVENUE FROM N.W. 79 STREET TO SR 826/PALMETTO EXPY.;LIGHTING;CONSTRUCTION;LAP | Safety/Traffic Management | $2,360,000 |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | S.W. 112 STREET FROM SR5/US-1 S.DIXIE HW TO S.W. 67 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $165,365 |
FLORIDA | CALHOUN COUNTY GUARDRAIL;CONSTRUCTION; AMERICAL RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $185,478 | |
FLORIDA | CALHOUN COUNTY THERMO STRIPING;SAFETY PROJECT;AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $264,522 | |
FLORIDA | SR 363 NORTH OF PINE STREET CROSSWALKS & SIDEWALKS;AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $50,000 | |
FLORIDA | CITY OF GRETNA CITY ST SIDEWALKS;DB; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $400,000 | |
FLORIDA | CR 175 FROM HIGHWAY 2 TO NOMA CEMETERY;SIDEWALK;DB; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $110,000 | |
FLORIDA | SR 79 FIRST AVENUE SIDEWALKS;DB; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $110,000 | |
FLORIDA | COUNTY ROAD RESURFACING/SAFETY IMPROVEMENTS;DB; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $700,000 | |
FLORIDA | SR 69 SIDEWALK PROJECT PHASE 1;DB; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $309,392 | |
FLORIDA | FORT WALTON BEACH | SR 285 SIDEWALKS CITY OF NICEVILLE;DB; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $182,439 |
FLORIDA | FORT WALTON BEACH | LIVE OAK AVE FROM 20TH ST TO 25TH ST & 19TH ST FROM NORTH HEDGER TO LIVE OAK SIDEWALKS;CITY OF DEFUNIAK SPRINGS; DB;ARRA | Transportation Enhancements | $251,379 |
FLORIDA | FORT WALTON BEACH | CR 30A W OF TOPSAIL HILL ST PARK TO E OF SUNRISE CIRCLE;RESURFACING;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) | Pavement Improvement | $925,630 |
FLORIDA | COLLEGE STREET FROM KELSON TO NORTH OF WORKFORCE WAY;RESURFACING;LAP; AMERICAN RECOVER & REINVESTMENT ACT (ARRA) | Pavement Improvement | $314,931 | |
FLORIDA | FORT WALTON BEACH | SR 20 FROM KYLEA LAIRD ROAD TO E OF WASHINGTON STREET;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $110,000 |
FLORIDA | TALLAHASSEE | SR 369 (US 319) AT RUSSELL DRIVE INTERSECTION;ADD LEFT TURN LANE; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Widening | $374,871 |
FLORIDA | SR 166 FROM BALES AVENUE TO MARIANNA HIGH SCHOOL;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $938,489 | |
FLORIDA | CITY OF MARIANNA CROSSWALK SAFETY IMPROVEMENTS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Safety/Traffic Management | $162,617 | |
FLORIDA | TALLAHASSEE | LUCY ST FROM MAGNOLIA DR HILLCREST ST SIDEWALKS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $157,202 |
FLORIDA | TALLAHASSEE | SR 371 LAKE BRADFORD FROM PINEVIEW ELEMENTARY TO STADIUM DR;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $174,865 |
FLORIDA | TALLAHASSEE | JOE LOUIS ST FROM ALABAMA ST TO PRESTON ST & INGLESIDE AVE FROM END OF SIDEWALK E MARTIN TO TERRACE ST SIDEWALKS;(ARRA) | Transportation Enhancements | $742,205 |
FLORIDA | FORT WALTON BEACH | COUNTRY CLUB AVE NE FROM MOONEY ROAD NE TO MOONEY ROAD NE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $448,334 |
FLORIDA | CR 269 SOUTH MAIN ST FROM SR 10 (US 90) TO 1/4 MI SOUTH OF US 90;LAP | Pavement Improvement | $272,023 | |
FLORIDA | TALLAHASSEE | DEMPSEY MAYO RD FROM MAHAN DR TO MICCOUSUKEE RD;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $342,893 |
FLORIDA | TALLAHASSEE | PERKINS ROAD FROM N MONROE ST TO OLD BAINBRIDGE RD;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $97,738 |
FLORIDA | TALLAHASSEE | VELDA DAIRY RD FROM BRADFORDVILLE RD TO KERRY FOREST PKWY;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESMENT ACT (ARRA) | Transportation Enhancements | $484,376 |
FLORIDA | FORT WALTON BEACH | BROOKMEADE DRIVE SIDEWALKS;CONSTRUCTION;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $110,000 |
FLORIDA | ST. GEORGE ISLAND SIDEWALKS;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $214,102 | |
FLORIDA | PENSACOLA | CR 297 DOG TRACK RD FROM 5,940' NORTH TO GULF BEACH HIGHWAY;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $363,178 |
FLORIDA | PENSACOLA | CR 95A OLD PALAFOX FROM E ROBERTS BLVD TO 9 MILE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $858,684 |
FLORIDA | PENSACOLA | CR 498 COPTER RD FROM ELLYSON PK ENTRANCE TO 9 MILE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $499,053 |
FLORIDA | PENSACOLA | CR 453 W STREET FROM NORTH SR 95 (US 29) TO FAIRFIELD DRIVE;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $2,527,424 |
FLORIDA | PENSACOLA | CR 297 DOG TRACK RD FROM SR 173 BLUE ANGEL TO SR 30 (US 98);LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $871,927 |
FLORIDA | PENSACOLA | EAST JOHNSON AVE FROM GATEWOOD ROAD TO SR 290 OLIVE ROAD;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Pavement Improvement | $409,790 |
FLORIDA | PENSACOLA | BROAD STREET FROM UNTREINER AVE TO ALEXIA AVE;SIDEWALK;LAP; AMERICAN RECOVERY & REINVESTMENT ACT (ARRA) | Transportation Enhancements | $143,690 |
FLORIDA | WITHLACOOCHEE TRAIL CONNECTION FROM N TRAIL ND TO NE OF US 41 & RIVER;BIKE PATH/TRAIL;CONSTRUCTION;LAP | Transportation Enhancements | $320,000 | |
FLORIDA | MIAMI-HIALEAH-FT.LAUD-HOL-WPALM | SW 328 STREET FROM SW 192 AVENUE TO SW 187 AVENUE;RESURFACING;CONSTRUCTION;LAP | Pavement Improvement | $126,000 |
GEORGIA | COLUMBUS (AL) | Project 0000099 consists of the construction of a 10 to 12 foot multi use trail beginning at Columbus State University and extending northeasterly to Cooper Creek Park. The proposed project would be c | Transportation Enhancements | $1,250,000 |
GEORGIA | This project proposes to realign on new location SR 11/US 129 and SR 31, 122/ US 221 to create two, (2), 90 degree "T" intersections with SR 37 to improve safety and turning movements. These intersec | Pavement Widening | $3,129,018 | |
GEORGIA | ATLANTA | This project consists of reconstructing the existing intersection of SR 5 and Rose Avenue, located just north of I-20 in Douglas County. The existing intersection has an undesirable "scissor-type" con | Safety/Traffic Management | $2,843,820 |
GEORGIA | This project consists of a bridge replacement on CR 134/County Line Road over Polecat Creek on the Gordon and Murray county line. Also, there will be three overflow box culverts to prevent flooding. | Bridge Replacement | $1,687,138 | |
GEORGIA | The construction proposes to construct a new 160' x 44' concrete bridge over Dry Creek at the existing bridge site. The approaches will consist of two, 12' lanes with 10' rural shoulders (2 paved). Tr | Bridge Replacement | $3,122,043 | |
GEORGIA | This project is a bridge replacement on S.R. 56/Nail Bridge @ the Ohoopee River 2 miles west of Reidsville. | Bridge Replacement | $4,177,171 | |
GEORGIA | This project will replace the structurally deficient bridge on CR 76 over Drag Nasty Creek with a new 180' x 28' reinforced concrete bridge. The existing approaches consist of two 9 ft travel lanes, | Bridge Replacement | $1,674,423 | |
GEORGIA | ATLANTA | The proposed project is located on SR 3/US 41 beginning approximately at the Cobb/Bartow County line and extending north to the SR 293 Connector in Bartow County. The proposed improvement will add tu | Safety/Traffic Management | $18,081,428 |
GEORGIA | ATLANTA | This project includes construction of sidewalks on both sides of Covington Hwy from Memorial Dr. to W. Austin Dr for a total of 1.58 miles. Project will be 5' ADA compliant sidewalks with a 2' stamped | Transportation Enhancements | $2,483,200 |
GEORGIA | ATLANTA | This project is located on Eagle's Landing Parkway, 0.4 miles east of the I-75 interchange in Henry County. This project proposes to continue the widening of Eagle's Landing Parkway from Eagle's Poin | Pavement Widening | $33,591,874 |
GEORGIA | This project is a bridge replacement on C.R. 203 / Glisson Road @ Wolfe Creek. The existing bridge, constructed in 1955, is load limited with a sufficiency rating of 27. | Bridge Replacement | $1,710,677 | |
GEORGIA | This project is a bridge replacement on C.R. 223/Portal Highway @ Little Stocking Head Creek in Candler County, 5 miles north of Metter. The existing bridge, constructed in 1967, is load limited with | Bridge Replacement | $1,792,577 | |
GEORGIA | This project is a bridge replacement on C.R. 223/Portal Highway @ Big Branch and @ Lotts Creek in Bulloch/Candler Counties. The existing bridges, constructed in 1953, are 27.5' wide with sufficiency | Bridge Replacement | $2,911,530 | |
GEORGIA | ATLANTA | Intersection improvements on Kimball Bridge Rd at Waters Rd in Fulton County will provide Kimball Bridge Rd. one left turn lane, a through lane and one right turn lane. Westbound Kimball Bridge Rd. a | Pavement Improvement | $1,422,750 |
GEORGIA | ATLANTA | This project proposes to improve accessibility, mobility and safety by connecting to a bike and pedestrian system that is planned for the entire midtown area. Upon its completion, the project would r | Transportation Enhancements | $4,766,040 |
GEORGIA | ATLANTA | This proposed project will connect to the existing intersection of McGinnis Ferry Road and Satellite Boulevard, with only minor improvements to Satellite Boulevard and McGinnis Boulevard. The roadway | New Construction | $28,745,941 |
GEORGIA | ATLANTA | This project includes enhancements to pedestrian safety and improved near term traffic flow. The project will also address aesthetic concerns typically involved with streetscape improvements. Improv | Transportation Enhancements | $3,329,993 |
GEORGIA | The Homerville Depot, also known as Station 11 will be restored to its original architectural style to the extent possible. Vinyl siding that has been installed on the west end of the Depot will be re | Transportation Enhancements | $500,000 | |
GEORGIA | COLUMBUS (AL) | Streetscape on Veterans Pkwy SR 1/US 27 beginning at 8th Street and extending northerly to 13th Street. The total length of the project is .65 mile. Improvements consists of streetscape elements. P | Transportation Enhancements | $1,250,000 |
GEORGIA | The aesthetic revitalization of a portion of Georgia Highway 109 east of Georgia Highway 18 intersection. As a part of the proposal, some of the existing sidewalk and stand-up curb and gutter will ne | Transportation Enhancements | $156,000 | |
GEORGIA | Streetscape improvements within the downtown of Rockmart along: State Route 6 (Elm Street) from CSX Railroad right-of-way to Slate Street; Marble Street from State Route 6 (Elm Street) to 325 feet nor | Transportation Enhancements | $281,000 | |
GEORGIA | ATLANTA | The proposed project is entirely contained within Dekalb County. The project consists of the South and North Hairston Road corridors from Kenilworth Drive to Mainstreet Park Drive. The total project | Safety/Traffic Management | $873,026 |
GEORGIA | ATLANTA | The proposed project along Buford Hwy. in Gwinnett County will upgrade signal equipment and install fiber optic interconnect. Installation of ITS on Buford Highway from Global Forum Boulevard to Sugar | Safety/Traffic Management | $2,402,881 |
GEORGIA | ATLANTA | This project includes the design of fiber optic communications cable and closed-circuit television (CCTV) cameras along Sugarloaf Parkway from Peachtree Industrial Boulevard in Duluth to SR 20/Grayson | Safety/Traffic Management | $2,335,467 |
GEORGIA | ATLANTA | Project is streetscape designs & intersection improvements along SR 154/Memorial Dr. from SR 155/Candler Rd to Mountain Dr. for a total of 3.40 miles. Sidewalk improvements will include upgrading exis | Transportation Enhancements | $8,332,459 |
GEORGIA | The proposed project is a restoration/rehabilitation of a 5,000 square foot historic Ice Plant located at 252 Barron Street, Waynesboro, Georgia. The project includes stabilization of the existing bu | Transportation Enhancements | $725,000 | |
GEORGIA | The Bainbridge Central Business District is well defined on the north by Calhoun Street and on the south by Shotwell Street. The main street through Downtown Bainbridge is Broad Street. Another well | Transportation Enhancements | $625,000 | |
GEORGIA | ATLANTA | Deepdene Park will be rehabilitated. The Mead at the east end and the West Lawn at the west end of Deepdene Park will have the open, pastoral character of the other five Olmsted parks and will be conn | Transportation Enhancements | $1,250,000 |
GEORGIA | ATLANTA | This project involves clearing, grading, and installing a 10' to 12' wide concrete trail from MLK High School on Snapfinger Rd. to the Arabia Mountain Trail at Lyons Rd. The trail is part of an effort | Transportation Enhancements | $750,000 |
GEORGIA | ATLANTA | The project will provide pedestrian improvements within the City of Fayetteville along Lee Street. This will involve adding curb and gutter. Construction of a 5 foot sidewalk with a 2 foot grass bu | Transportation Enhancements | $625,000 |
GEORGIA | Will involve the construction of sidewalks, curb and gutter, seatwalls, lighting, street furniture and landscaping around the historic Old Haralson County Courthouse. Phase one included improvements o | Transportation Enhancements | $438,000 | |
GEORGIA | ATLANTA | The proposed project would provide a trailhead facility. The project will be constructed on two city owned parcels adjacent to Cleveland Street and Smith Street in Locust Grove. The trailhead will a | Transportation Enhancements | $313,000 |
GEORGIA | ATLANTA | The project will provide a trailhead facility adjacent to downtown Dallas, on an approximate 1 acre site at the intersection of South Main Street and Hardee Street. The trailhead will serve as the do | Transportation Enhancements | $625,000 |
GEORGIA | Ellaville Sidewalk Project - East side of Hill Street between West Buena Vista Street and CR 133 - South side of West Buena Vista Street from Hill Street to Existing sidewalk - North side of CR 13 | Transportation Enhancements | $275,000 | |
GEORGIA | ATLANTA | This project consists of traffic signal upgrades in the City of Griffin at the following locations: Poplar St. @ 6th St., Poplar St. @ 8th St., Poplar St. @ 9th St., Poplar St. @ 10th St., Solomon St. | Safety/Traffic Management | $1,829,194 |
GEORGIA | ATLANTA | This project consists of traffic signal upgrades at the following intersections: College St. @ 6th St., Hill St. @ Chappell St., Chappell St. @ 9th St., Quilly St. @ 9th St., W. Ellis @ N. Pine Hill. | Safety/Traffic Management | $491,514 |
GEORGIA | ATLANTA | A Strategic Regional Thoroughfare Plan will establish a systematic concept, including various operational and characteristic guidelines that are consistent with maximizing travel performance. This pl | Other | $1,000,000 |
GEORGIA | ATLANTA | The purpose of this project is to improve the operating characteristics of the intersection of SR 8 (Lawrenceville Highway) and Pleasant Hill Road/Lester Road in Gwinnett County, just north of Lilburn | Safety/Traffic Management | $11,343,125 |
GEORGIA | ATLANTA | The purpose of this project is to improve the operation characteristics of the intersection of SR 8 (Lawrenceville Highway) and Beaver Ruin Road/Arcado Road in Gwinnett County, within the city limits | Safety/Traffic Management | $7,610,767 |
GEORGIA | CHATTANOOGA (TN) | ARRA 2009 - CONSTRUCTION FOR PI# 0001418, CST SR 2/BATTLEFIELD PARKWAY @ CR 6/PINE GROVE ROAD | Safety/Traffic Management | $1,700,677 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0004394 - GRTA, CST | Transportation Enhancements | $5,064,095 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0004397 - GRTA, CST | Pavement Improvement | $1,344,853 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0004403 - GRTA, CST | Pavement Improvement | $10,690,903 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0004404 - GRTA, CST | Pavement Improvement | $1,698,210 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0004644 - GRTA, CST | Pavement Improvement | $21,425,200 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0008525 - GRTA, CST | Pavement Improvement | $1,554,089 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0008529 - GRTA, CST | Pavement Improvement | $1,204,159 |
GEORGIA | ATLANTA | ARRA 2009 - CONSTRUCTION FOR PI# 0008584, CST | Safety/Traffic Management | $1,767,050 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities for S.R. 314 and S.R. 54 at various intersections in Fayette County. The intersections are as follows: | Safety/Traffic Management | $213,440 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities at five locations for S.R. 42 in Clayton County. The intersections are as follows: | Safety/Traffic Management | $925,621 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities at various locations on Old Alabama Rd in the City of Roswell. The intersections are as follows: | Safety/Traffic Management | $1,170,063 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities at various locations on Chamblee Tucker Rd, Clairmont Rd, & New Peachtree Rd. The intersections are as follow | Safety/Traffic Management | $1,295,995 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities at various locations on Briarcliff Rd & Shallowford Rd in Dekalb County. The intersections are as follows: | Safety/Traffic Management | $1,523,139 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities at various locations on Chamblee Dunwoody Rd & N.Shallowford Rd in Dekalb County. The intersections are as fo | Safety/Traffic Management | $2,597,044 |
GEORGIA | ATLANTA | Project Description: Upgrade existing traffic signal equipment and pedestrian facilities at various locations on LaVista Rd, Northlake Pkwy, & Henderson Mill Rd in Dekalb County. The intersections a | Safety/Traffic Management | $2,103,688 |
GEORGIA | ATLANTA | This project consists of the upgrade of the traffic signals at 5 locations in Cobb County. Pedestrian improvements will be included in the project. The intersections are as follows: 1. Mableto | Safety/Traffic Management | $638,529 |
GEORGIA | AUGUSTA (SC) | This project is the replacement of a structurally deficient bridge on SR 223 over Euchee Creek, 2.2 miles Northwest of Grovetown, Georgia. The construction proposes to relocate SR 223 south of its pr | Bridge Replacement | $3,161,914 |
GEORGIA | This project is located approximately four miles northwest of Pearson, Georgia in Atkinson County. It consists of a bridge replacement over Pudding Creek along CR 42/Antioch Church Road. The existing | Bridge Replacement | $2,004,568 | |
GEORGIA | ATLANTA | The construction proposes to add 5' sidewalks 2' behind the back of the existing curb on both sides of Holcomb Bridge Rd between Old Holcomb Bridge Rd and the southbound ramps of SR 400 for a total of | Transportation Enhancements | $1,500,000 |
GEORGIA | ALBANY | This project widens/reconstructs Gillionville Road from Eight Mile Road to Lockett Station Road. The existing two lane roadway will be widened to four lanes, with bike lanes and a 5 foot sidewalk in | Pavement Widening | $10,244,983 |
GEORGIA | This project is the construction of the North Gordon Bypass from SR 57 at the Twiggs/Wilkinson County Line to SR 243 milepost 3.32, the bridge over Commissioner Creek for a distance of 7.2 miles. This | New Construction | $56,366,519 | |
GEORGIA | SAVANNAH | This project consists of the replacement of the US 17/SR 25 bridge over Norfolk Southern Railroad approximately 5.5 miles north of Savannah in Port Wentworth. The new structure will be a 177-ft long | Bridge Replacement | $4,501,577 |
GEORGIA | ATLANTA | This project consists of the replacement of the bridge over I-85 and widening of SR 324 approaching the bridge. SR 324 will be widened to a four-lane divided curb and gutter facility with a 24 foot r | Bridge Replacement | $15,700,000 |
GEORGIA | ATLANTA | This project will include the installation of the NaviGAtor system along I-675 from I-75 to I-285. Included in the project will be two changeable message signs, vehicle detection coverage, CCTV camer | Safety/Traffic Management | $4,206,417 |
GEORGIA | ATLANTA | This project is the milling and resurfacing of SR 162. This section of SR 162 needs resurfacing because the existing pavement is deteriorating. SR 162 was last resurfaced in 1985. | Pavement Improvement | $1,219,810 |
GEORGIA | This project is the resurfacing of SR 82. This section of SR 82 needs resurfacing because the existing pavement is deteriorating. SR 82 was last resurfaced in 1998. | Pavement Improvement | $1,616,826 | |
GEORGIA | This project is the milling and resurfacing of SR 50. This section of SR 50 needs resurfacing because the existing pavement is deteriorating. SR 50 was last resurfaced in 2002. | Pavement Improvement | $3,341,684 | |
GEORGIA | This project is the milling and resurfacing of SR 31. This section of SR 31 needs resurfacing because the existing pavement is deteriorating. SR 31 was last resurfaced in 1996. | Pavement Improvement | $1,141,947 | |
GEORGIA | ALBANY | This project is the milling and resurfacing of SR 133. This section of SR 133 needs resurfacing because the existing pavement is deteriorating. SR 133 was last resurfaced in 1998. | Pavement Improvement | $305,250 |
GEORGIA | This project is the resurfacing of SR 98. Ths section of SR 98 needs resurfacing because the existing pavement is deteriorating. SR 98 was last resurfaced in 1983. | Pavement Improvement | $1,332,000 | |
GEORGIA | This project is the milling and rsurfacing of SR 75. This section of SR 75 needs resurfacing because the existing pavement is deteriorating. SR 75 was last resurfaced in 1988. | Pavement Improvement | $710,400 | |
GEORGIA | GAINESVILLE | This project is the resurfacing of SR 283. This section of SR 283 needs resurfacing because the existing pavement is deteriorating. SR 283 was last resurfaced in 2001. | Pavement Improvement | $2,036,850 |
GEORGIA | This project is the resurfacing of SR 135. This section of SR 135 needs resurfacing because the existing pavement is deteriorating. SR 135 was last resurfaced in 1997. | Pavement Improvement | $3,718,827 | |
GEORGIA | SAVANNAH | This project is the milling and resurfacing of SR 307. This section of SR 307 needs resurfacing because the existing pavement is deteriorating. SR 307 was last resurfaced in 1988. | Pavement Improvement | $2,271,368 |
Source: FDIC