###### (Automatically generated documentation) # Reduce LPD by Percentage for Peak Hours ## Description This measure reduces lighting loads by a user-specified percentage for a user-specified time period (usually the peak hours). This is applied throughout the entire building. ## Modeler Description This measure will clone all of the lighting schedules for each zone. Then the schedules are adjusted by the specified percentage during the specified time period. ## Measure Type ModelMeasure ## Taxonomy ## Arguments ### Percentage Reduction of Lighting Power (%) Enter a value between 0 and 100 **Name:** lpd_reduce_percent, **Type:** Double, **Units:** , **Required:** true, **Model Dependent:** false ### Start Time for the Reduction In HH:MM:SS format **Name:** start_time, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### End Time for the Reduction In HH:MM:SS format **Name:** end_time, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### Use alternative default start and end time based on the climate zone of the model? This will overwrite the star and end time you input **Name:** alt_periods, **Type:** Boolean, **Units:** , **Required:** false, **Model Dependent:** false ### First start date for the Reduction In MM-DD format **Name:** start_date1, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### First end date for the Reduction In MM-DD format **Name:** end_date1, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### Second start date for the Reduction (optional) Specify a date in MM-DD format if you want a second period of reduction; leave blank if not needed. **Name:** start_date2, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### Second end date for the Reduction Specify a date in MM-DD format if you want a second period of reduction; leave blank if not needed. If either the start or end date is blank, the period is considered not used. **Name:** end_date2, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### Second start date for the Reduction (optional) Specify a date in MM-DD format if you want a third period of reduction; leave blank if not needed. **Name:** start_date3, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false ### Second end date for the Reduction Specify a date in MM-DD format if you want a third period of reduction; leave blank if not needed. If either the start or end date is blank, the period is considered not used. **Name:** end_date3, **Type:** String, **Units:** , **Required:** false, **Model Dependent:** false