Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
OHIO | DAYTON | STREET RESURFACING. | Pavement Improvement | $205,282 |
OHIO | Resurfacing and reconstruction. | Other | $50,000 | |
OHIO | Track Rehabilitation | Other | $1,200,000 | |
OHIO | Deck overlay and fence installation. | Bridge Improvement | $7,500,000 | |
OHIO | AKRON | REPLACE OR REHAB BRIDGE OVER CUYAHOGA RIVER AND CSX. IMPROVE CRAIN AVE. INTERSECTION IMPROVEMENT OF THREE INTERSECTIONS. | Bridge Replacement | $3,000,000 |
OHIO | It is proposed to widen SR104 from US35 to the new relocated SR207 by adding additional thru traffic lanes and a center turn lane. PE Only-100% LPA Funds. | Pavement Improvement | $6,500,000 | |
OHIO | Part 2 of 3, the Nelsonville By-Pass (CO Phase). Includes PE and RW phase activities. Some environmental under old PID 14040. Part 1 CO Phase under PID 80949. Part 3 CO Phase under PID 79577. ARR | New Construction | $55,880,000 | |
OHIO | CLEVELAND, OH | Construct a grade separation at Columbia Road (SR-252) and the CSX RailroadCompany tracks in the City of Olmsted Falls.SAFETEA-LU Earmark(NEW BRIDGE, SFN 1810391) | New Bridge Construction | $7,693,000 |
OHIO | Part 3 of 3, the Nelsonville By-Pass (CO phase). Part 1 CO Phase under PID 80949. PE, RW and CO Phase Part 2 under PID 23846. Some environmental under old PID 14040. ARRA ID 7217 | New Construction | $120,210,000 | |
OHIO | YOUNGSTOWN-WARREN | Mill and Fill. | Pavement Improvement | $236,500 |
OHIO | Replace small culvert PRE-40-0740. The existing culvert is an 84"x40" cast-in-place concrete culvert. | Pavement Improvement | $135,640 | |
OHIO | CINCINNATI (KY) | Resurfacing sections of Tylersville & River Roads and replacing the striping and RPMs in the same sections. | Pavement Improvement | $2,294,165 |
OHIO | CINCINNATI (KY) | Resurfacing, full depth pavement repair, berm repair, pavement striping, and RPMs on various County roads (approx. 28 miles). Curb and ADA curb ramps on Buckwheat Road. | Pavement Improvement | $2,464,300 |
OHIO | DAYTON | Simple overlay of pavement, striping and berm repair. | Pavement Improvement | $185,881 |
OHIO | CINCINNATI (KY) | Cornell Road to be microsurfaced. New pavement marking and curb ramps as well. | Pavement Improvement | $130,725 |
OHIO | CINCINNATI (KY) | Resurface a portion of the Reed Hartman Hwy. Also, perform pavement repair, curb & gutter repair, replace signal loops with video detection, replacing pavement striping, place new RPMs, and where ap | Pavement Improvement | $840,000 |
OHIO | CINCINNATI (KY) | Resurfacing, curb replacement, base repairs, and inlet reconstruction to restore roadway integrity. | Pavement Improvement | $635,000 |
OHIO | Widen existing bridge to standard shoulder widths. Ramp to be used as a detour for the Innerbelt Bridge. Project includes work necessary to create an additional temporary lane on I77 between I90 and | Bridge Improvement | $2,804,765 | |
OHIO | Hydrodemo the existing wearing course and overlay with micro-silica. (See PID 25492 for pavement major rehab) of 4 bridges. Perform necessary related work. Original project scope of the Disalle bridge | Bridge Improvement | $5,585,106 | |
OHIO | 11 - Bridge Replacement, No Added Capacity | Bridge Replacement | $910,619 | |
OHIO | FY09 Urban Paving Project - City Of Columbus.FRA-US40-8.59-10.55: Columbus. W Broad Street From Hague Ave To Central Ave.Added Federal/State Paving Of West Broad St Ramps (Broad St To I-70 WB And I-70 | Pavement Improvement | $654,980 | |
OHIO | general system - poor performing pavements | Pavement Improvement | $1,093,310 | |
OHIO | Pavement planing and resurfacing of the existing roadway with asphalt concrete.(Urban Paving Program) | Pavement Improvement | $227,525 | |
OHIO | Replace concrete ramps at IR-480 and W. 130th. | Pavement Improvement | $757,580 | |
OHIO | Replace 3 Span Slab Bridge Over Jerome Forkstimulus Estimate 430,310 (Cbrown 02/03/09)** Selected Stimulus Project ** | Bridge Replacement | $393,060 | |
OHIO | AKRON | Reconstruction. Adding turn lanes. | Other | $220,000 |
OHIO | Replace 3 Span Steel Beam Bridge Over Muddy Forkstimulus Estimate 508,333 (Cbrown 02/13/09)** Selected Stimulus Project ** | Bridge Replacement | $439,070 | |
OHIO | Rehabilitate Deficient 302' Structure Over IR71Stimulus Estimate 1,769,290 (Cbrown 01/20/09)** Selected Stimulus Project ** | Bridge Improvement | $1,643,250 | |
OHIO | TOLEDO (MI) | A partially ARRA funded and partially Urban Paving Program funded resurfacing of Telegraph Rd (US-24) from Alexis Rd (SR-184) to just south of the Michigan State Line in the City of Toledo. Perform n | Pavement Improvement | $315,000 |
OHIO | TOLEDO (MI) | The Partially (TMACOG) ARRA funded and partially Urban Paving Program funded resurfacing of Detroit Ave (US-24) in the City of Toledo from I-75 near Monroe St to Central Ave (SR-120). Perform necessa | Pavement Improvement | $570,000 |
OHIO | Track rehabilitation work to reduce derailment expenses and help railroad provide reliable service to two rail-dependent businesses that employ a total of 50 people. | Other | $67,000 | |
OHIO | Districtwide approach slab leveling | Bridge Improvement | $1,100,000 | |
OHIO | City of Orrville; Upgrade to Railroad lights and gates | Safety/Traffic Management | $850,000 | |
OHIO | West County Port Authority; Track Rehabilitation | Other | $1,000,000 | |
OHIO | Modernize Warning Devices And Reconstruct Ohi-Rail Grade Crossing AAR 503 455W. Arra Odot Tracking Id Is 12995. | Safety/Traffic Management | $250,000 | |
OHIO | Replacement of rail, ballast, crossing surfaces, and other system improvements along the city's 3.6-mile long rail line. | Other | $949,795 | |
OHIO | AKRON | Adding lanes in each direction plus additional turn lanes where necessary. | Pavement Improvement | $1,000,000 |
OHIO | District 12 ITS - Freeway Management System (MOT). TRAC Project.Moved from 2008 to 2009 due to Director request to redesign withoutfiber optic in the project. To be sold with D4 ITS project, PID77482 | Safety/Traffic Management | $26,662,500 | |
OHIO | CANTON | Widen Existing Road To 4 Lanes With Curb & Gutters, 5 Lanes To Be Provided At All Major Intersections Includes Storm Sewer & Traffic Signals. | Pavement Widening | $4,800,000 |
OHIO | RJ Corman Western Ohio Lines Rehabilitation (Allen, Van Wert, Auglaize, & Mercer Counties) | Other | $1,300,000 | |
OHIO | Transportation issue to be corrected : Mill and resurface roadway including repair of curbs, sidewalks and install ADA curb ramps. Install / upgrade lighting. | Pavement Improvement | $711,060 | |
OHIO | Modernization of warning devices at the CFE grade crossings; AARs 532 743U, 532 744B, 532 745H, 532 747W, 532 749K, 532 750E & 532 748 D | Safety/Traffic Management | $778,600 | |
OHIO | Replacement of existing 2 span steel truss and steel beam structure, also includes approach reconstruction | Bridge Replacement | $1,124,000 | |
OKLAHOMA | I-40: FR MILE POST 281.67 TO 288.22 | Pavement Improvement | $26,884,000 | |
OKLAHOMA | US-271: FR SH-112 WEST TO SH-9A (4 LN DIVIDED) REPLACE BR & REHB EXISTING LANES | Bridge Replacement | $5,968,238 | |
OKLAHOMA | SH-3: FROM 0.33 MI WEST OF THE PUSHMATAHA C/L EAST 1.82 MI | Pavement Widening | $3,818,000 | |
OKLAHOMA | I-35: FROM SH-29, NORTH 6.57 MI TO SH-19(MP 66.19 TO MP 72.76) | Pavement Improvement | $24,830,000 | |
OKLAHOMA | I-40: FROM 4.0 MI EAST OF SH 99, EAST 2.47 MI(MP 204.22 TO MP 206.69) | Pavement Improvement | $2,730,000 | |
OKLAHOMA | I-44: FROM US-62 (END OF HE BAILEY TP), NORTH 7.5 MI(MP 106.92 TO MP 114.42) | Pavement Improvement | $6,760,000 | |
OKLAHOMA | I-40: FROM FROM MILE MARKER 132 TO MILE MARKER 136(PAVE & BR REHAB) | Pavement Improvement | $30,000,000 | |
OKLAHOMA | I-35 BEGINNING AT MILEPOST 224.43 & EXTENDING NORTH TO MILEPOST 229.33 | Pavement Improvement | $21,586,000 | |
OKLAHOMA | I-40: RESURFACE FROM MILEPOST 25 TO 33 | Pavement Improvement | $13,379,000 | |
OKLAHOMA | US-412: FROM 0.12 MI EAST OF US-54, EAST 7.3 MI | Pavement Improvement | $6,297,000 | |
OKLAHOMA | US 64: FROM 7.5 MI EAST OF SH-56 EXTEND EAST 8.0 MILES (ADD ALTERNATE) | Pavement Improvement | $6,410,000 | |
OKLAHOMA | US 64: FROM THE TX CO LN, EXTEND EAST 4.5 MILES | Pavement Improvement | $3,567,000 | |
OKLAHOMA | US-283: OVER TWENTYFIVE MILE CREEK, 0.5 MILES NORTH OF JCT SH-15 | Pavement Improvement | $3,472,000 | |
OKLAHOMA | SH-7: OVER BEAVER CR, 2.4 MI WEST OF THE COMANCHE/STEPHENS C/L(1.6 MI EAST OF SH 65) | Bridge Replacement | $2,241,000 | |
OKLAHOMA | US-70: OVER RED OAK CR. APPROX. 1.8 MI. E. OF THE JEFFERSON C/L.(RDY= 09247(15) | Bridge Replacement | $1,272,000 | |
OKLAHOMA | US-81: INTERCHANGE @ BOIS D'ARC AVE. | Pavement Widening | $4,954,000 | |
OKLAHOMA | US-70 BEG @ JEFFERSON C/L & EXTENDING EAST 3.08 MILEBR=09247(14) | Pavement Improvement | $5,344,000 | |
OKLAHOMA | TULSA | I-244 FROM US-75 INTERCHANGE NORTH TO THE US-64 INTERCHANGE IN TULSA(N.B. LANES OF WEST LEG OF IDL)(DEL FR 03-09, ADD TO 04-09; AS PER O.E.) | Bridge Improvement | $11,850,000 |
OKLAHOMA | TULSA | I-244 FROM US-75 INTERCHANGE NORTH TO THE US-64 INTERCHANGE IN TULSA(S.B. LANES OF WEST LEG OF IDL)(DEL FR 03-09, ADD TO 04-09; AS PER O.E.) | Bridge Improvement | $19,716,000 |
OKLAHOMA | TULSA | I-244 FROM US-64 INTERCHANGE EAST TO THE US-75 INTERCHANGE IN TULSA(E.B. LANES OF NORTH LEG OF IDL)(DEL FR 03-09, ADD TO 04-09; AS PER O.E.) | Bridge Improvement | $15,100,000 |
OKLAHOMA | TULSA | I-244 FROM US-64 INTERCHANGE EAST TO THE US-75 INTERCHANGE IN TULSA(W.B. LANES OF NORTH LEG OF IDL)(DEL FR 03-09, ADD TO 04-09; AS PER O.E.) | Bridge Improvement | $18,100,000 |
OKLAHOMA | SH-151 OVER SH-51 & OVER SL&SF RR APPROX 1.5 MI EAST OF THE CREEK C/L | Bridge Replacement | $6,059,000 | |
OKLAHOMA | US-169 BEGIN APPROX 6.0 MILE SOUTH OF THE KANSAS S/L & EXT NORTH 6.0 MILETO THE KANSAS S/L. | Pavement Widening | $3,535,000 | |
OKLAHOMA | US-281: BEGIN 4.5 MILES NORTH OF THE WOODS/MAJOR COUTY LINE AND EXTENDSOUTH 3.7 MILES. | Pavement Improvement | $706,900 | |
OKLAHOMA | US-54: BEGIN 5.3 MILES SW OF THE SH-94 JCT., EXTEND NE 5.0 MILES | Pavement Improvement | $1,090,729 | |
OKLAHOMA | US-54: BEGIN APPROX 9.8 MILES NE OF THE TX ST LN, EXTEND NE 1.6 MILES (GOODWELL CITY LIMITS) | Pavement Improvement | $807,900 | |
OKLAHOMA | US-54: BEGIN APPROX 11.4 MILES NE OF THE TX ST LN, EXTEND NE 7.0 MILES (SOUTHBOUND LANES ONLY) | Pavement Improvement | $1,424,500 | |
OKLAHOMA | SH-45: BEGIN 4.6 MILES EAST OF THE US-281 JCT., EXTEND EAST 3.5 MILES | Pavement Improvement | $598,700 | |
OKLAHOMA | US-183: FROM 0.33 MI NORTH OF THE SH-33 EAST JCT, EXTEND NORTH 5.96 MI | Pavement Improvement | $1,197,383 | |
OKLAHOMA | US-183: BEGIN 0.17 MILE NORTH OF THE SH-47 EAST JCT AND EXTEND NORTH 4.66MILES. (ADD ALTERNATES) | Pavement Improvement | $938,475 | |
OKLAHOMA | US-62: BEGIN 2.37 MILES EAST OF THE US-283 JCT AND EXTEND EAST 7.7 MILES.(WEST BOUND LANES ONLY) | Pavement Improvement | $997,900 | |
OKLAHOMA | US-62: BEGIN AT THE TILLMAN/JACKSON COUNTY LINE AND EXTEND EAST 3.92 MILES.(WEST BOUND LANES ONLY) | Pavement Improvement | $795,600 | |
OKLAHOMA | US-62: BEGIN 3.92 MILES EAST OF THE TILLMAN/JACKSON COUNTY LINE AND EXTENDEAST. (WEST BOUND LANES ONLY) | Pavement Improvement | $1,463,000 | |
OKLAHOMA | US-412 BEGIN MCCLELAN KERR NAVIGATION CHANNEL, EXTEND EAST APPOX. 5 MILESTO THE END OF ASHALT PAVING | Pavement Improvement | $1,378,900 | |
OKLAHOMA | I-40: FROM SEMINOLE C/L EXTEND EAST 8.0 MI. (ADD ALTERNATE) | Pavement Improvement | $3,380,000 | |
OKLAHOMA | I-40: FROM SH-18 EXTEND EAST 7.72 MI. TO SEMINOLE C/L | Pavement Improvement | $1,296,700 | |
OKLAHOMA | I-40: FROM POTTAWATOMIE C/L EXTEND EAST 6.46 MI. | Pavement Improvement | $1,086,200 | |
OKLAHOMA | I-35: BEGINNING AT THE CARTER C/L EXTEND N. 6.56 MILES | Pavement Improvement | $4,927,000 | |
OKLAHOMA | US-70: BEGINNING 2.67 MILES E. OF I-35, EXTEND E. 8.0 MILES(ADD ALTERNATES) | Pavement Improvement | $2,915,633 | |
OKLAHOMA | US-69 BEG APPROX 1.44 MILE NORTH OF SH-75W & EXT NORTH APPROX 3.8 MILE.WITH 412 FOOT EXCEPTION FOR NORTH BOGGY RIVER BRIDGE, NORTHBOUND ONLY | Pavement Improvement | $640,070 | |
OKLAHOMA | US-69 BEG APPROX 0.21 MI NORTH OF TEXAS S/L, EXTEND NORTH APPROX 5.26 MILE(NORTH & SOUTHBOUND LANES) | Pavement Improvement | $3,992,600 | |
OKLAHOMA | I-40 BEG @ MILE MARKER 108 & EXTEND EAST TO MILE MARKER 115. | Pavement Improvement | $1,716,300 | |
OKLAHOMA | I-40 BEG @ MILE MARKER 115 & EXTEND EAST APPROX 4.2 MILE(EAST & WESTBOUND LANES) | Pavement Improvement | $922,650 | |
OKLAHOMA | SH-76 BEG @ THE CARTER C/L & EXT NORTH APPROX 8.0 MILE TO SH-29. | Pavement Improvement | $1,128,800 | |
OKLAHOMA | SH-9 BEG APPROX 11.3 MILE EAST OF SH-2 & EXTEND EAST APPROX 1.1 MILE. | Pavement Improvement | $242,250 | |
OKLAHOMA | SH-2 BEG APPROX 14.3 MILE NORTH OF HASKELL C/L & EXT NORTH APPROX 1.75 MILE | Pavement Improvement | $473,800 | |
OKLAHOMA | US-75 BEG @ I-40 & EXTEND NORTH APPROX 2.44 MILES | Pavement Improvement | $857,500 | |
OKLAHOMA | US-69 BEG 0.5 MI NORTH OF SH-51 & EXT NORTH 7.84 MILE TO THE MAYES C/L | Pavement Improvement | $1,716,800 | |
OKLAHOMA | US-69 BEG 0.25 MI SOUTH OF SH-51 & EXT NORTH 0.75 MILES | Pavement Improvement | $393,800 | |
OKLAHOMA | US 59 FROM SH 9 EXTEND NORTH 5 MILES | Pavement Widening | $12,000,000 | |
OKLAHOMA | US-270B BEG AT SH-48 & EXT EAST 1.96 MILE TO US-270. | Pavement Improvement | $387,000 | |
OKLAHOMA | SH-105 BEG @ US-177 & EXT EAST APPROX 8.0 MILE T0 SH-18. | Pavement Improvement | $985,000 | |
OKLAHOMA | SH-18 BEG @ SH-105 & EXT NORTH APPROX 5.0 MILE TO PAYNE C/L | Pavement Improvement | $487,000 | |
OKLAHOMA | US-69 BEG APPROX 4.5 MILE SOUTH OF THE CRAIG C/L & EXT NORTH TO COUNTY LINE | Pavement Improvement | $1,871,300 | |
OKLAHOMA | I-35 BEG APPROX 1.2 MILE NORTH OF PAYNE C/L & EXT NORTH APPROX 6.0 MILE(NORTH & SOUTH BOUND LANES) | Pavement Improvement | $1,255,000 | |
OKLAHOMA | OKLAHOMA CITY | I-235 BEG @ NORTH END OF OKLA RIVER BR & EXT NORTH APPROX 3.5 MILE TO NEWCONCRETE @ 36TH ST. (NORTH & SOUTH BOUND LANES) | Pavement Improvement | $2,532,000 |
OKLAHOMA | US-69 BEG @ ATOKA C/L & EXT NORTH APPROX 3.0 MILE. NORTH BOUND | Pavement Improvement | $1,571,640 | |
OKLAHOMA | US-69 BEG APPROX 0.3 MI N OF ATOKA C/L & EXT N APPROX 4.65 MI(SOUTHBND LNS)US-69 BEG APPROX 3.08 MI N OF ATOKA C/L, EXT N APPROX 1.05 MI(NORTHBND LNS) | Pavement Improvement | $2,121,700 | |
OKLAHOMA | SH-266 BEG @ SH-167 & EXT EAST APPROX 6.0 MILE. | Pavement Improvement | $1,008,200 | |
OKLAHOMA | SH-56 BEG APPROX. 5.1 MILE EAST OF SH-99 & EXTEND EAST APPROX 4.8 MILE | Pavement Improvement | $935,000 | |
OKLAHOMA | US-183/US-70 BEG APPROX 8.0 MILE NORTH OF TEXAS S/L & EXT NORTH APPROX4.0 MILE TO SOUTH EDGE OF FREDERICK. | Pavement Improvement | $713,900 | |
OKLAHOMA | CO BR: OVER CHOUTEAU CR, APPROX 0.3 MI SOUTH & 2.3 MI EAST OF CHOUTEAU | Bridge Replacement | $980,000 | |
OKLAHOMA | CO BR.: OVER BRUSHY CR. APPROX 2.2 MI S & 2.5 MI WEST OF THE US-412/US-69 JCT | Bridge Replacement | $290,000 | |
OKLAHOMA | CO. BR. OVER DELAWARE CR. OVERFLOW ON CINCINNATI AVE. 0.5 MI. SOUTHOF 86TH ST. NORTH | Bridge Replacement | $900,000 | |
OKLAHOMA | CO.BR. OVER UNNAMED CREEK ON N401, 0.6MI SOUTH AND 4.2MI EAST OF JCT US-75AND OK-KS BORDER. REPLACE LOW WATER CROSSING | Bridge Replacement | $636,000 | |
OKLAHOMA | CO. BR. OVER BRUSH CREEK APPROX. 0.8 MI. SOUTH AND 2.0 MI. EAST OF US-75/SH-10 EAST JCT. (REPLACE LOW WATER CROSSING) | New Bridge Construction | $480,000 | |
OKLAHOMA | CO RD(PEAVINE ROAD) 4 MILE NORTH & 0.2 MILE EAST OF NORTH JUNCTION US-59/SH-51(REPL. LOW WATER XING) | New Bridge Construction | $584,000 | |
OKLAHOMA | CO. BR. OVER TELAMAY HOLLOW CREEK, 3.2 MI EAST & 0.5 MI NORTH OF MOODY | Bridge Replacement | $288,000 | |
OKLAHOMA | CO.BR. OVER FLAT ROCK CREEK, 0.1 MILE NORTH OF RAIFORD | Bridge Replacement | $335,000 | |
OKLAHOMA | CO. BR. OVER CLOUD CR., 1.3 MI NORTH & 1.6 MI EAST OF BOYTON(DEL FR 05-09, ADD TO 07-09; HISTORIC BR ISSUES) **AUTH** | Bridge Replacement | $438,449 | |
OKLAHOMA | CO. BR.: OVER UNNAMED CR., 4.2 MI EAST & 2.0 MI NORTH OFUS-75/SH-16 JCT. | Bridge Replacement | $320,000 | |
OKLAHOMA | CO BR(NS-467) OVER PRAIRIE CREEK APPROX 1.6 MILE SOUTH & 1.0 MILE WEST OFAKINS.(REPLACE EXIST LOW WATER XING)(DEL FR 05-09, ADD TO 07-09; UTILITIES) | New Bridge Construction | $420,881 | |
OKLAHOMA | CO BR: 1.0 MI NORTH & 4.25 MI WEST OF US-69/SH-51 IN WAGONER | Bridge Replacement | $220,000 | |
OKLAHOMA | CO BR: OVER ISLAND BAYOU & TRIBUTARY, APPROX 2.6 MILES NORTH OFSH-78 ON NS 380 | Bridge Replacement | $558,000 | |
OKLAHOMA | CO BR OVER RED BRANCH CR APPROX.1.0 MI NORTH & 1.5 MI EASTOF SMITH-LEE | Bridge Replacement | $381,000 | |
OKLAHOMA | CO. BR. OVER PEACHLAND CR, APPROX. 0.7 MI NORTH 2.0 MI WEST OFBENGAL | Bridge Replacement | $535,000 | |
OKLAHOMA | CO BR: OVER FOURCHE MALINE CREEK, 1.5 MI NORTH & 2.3 MIEAST OF LEFLORE | Bridge Replacement | $1,000,000 | |
OKLAHOMA | CO BR OVER UNNAMED CREEK APPROX. 2.0 MI NORTH & 3.7 MI WESTWEST OF QUINTON | Bridge Replacement | $330,000 | |
OKLAHOMA | CO. BR.: OVER COAL CR. 2.5 MI. EAST & 2.2 MI. SOUTH OF LEHIGH,ON NS-384 | Bridge Replacement | $295,400 | |
OKLAHOMA | CO BR: OVER TRIB. TO KEEL CREEK, 7.8 MI NORTH & 7.2 MI EAST OF COALGATE | Bridge Replacement | $162,000 | |
OKLAHOMA | CO. BR.: OVER BIG CR., 0.3 MI NORTH & 3.6 MI EAST OF ALLEN(LOCAL #38A) (DEL FR 04-09, ADD TO 06-09; PAY ITEM PROBLEMS) **AUTH** | Bridge Replacement | $429,292 | |
OKLAHOMA | CO BR: OVER SPRING CREEK, 1.0 MI WEST & 0.7 MI SOUTH OFUS-177/SH-66 JCT. | Bridge Replacement | $259,200 | |
OKLAHOMA | CO BR: OVER HARRICAN CREEK, 0.4 MILES WEST AND 3.0 MILESSOUTH OF MICAWBER | Bridge Replacement | $401,400 | |
OKLAHOMA | CO. BR.: OVER GRAYSON CR., 2.0 MI SOUTH & 6.7 MI EAST OFSH-59A /SH-3W JCT | Bridge Replacement | $387,159 | |
OKLAHOMA | CO. BR.: OVER MILL CREEK, 0.5 MI NORTH & 2.0 MI EAST OF FITTSTOWN | Bridge Replacement | $275,105 | |
OKLAHOMA | CO. BR.: OVER POPSHEGO CR, 0.5 MI NORTH & 2.9 MI EAST OFST. LOUIS | Bridge Replacement | $491,743 | |
OKLAHOMA | CO. BR. OVER UNNAMED CREEK, 3.5 MILES NORTH OF SH-7. | Bridge Replacement | $544,000 | |
OKLAHOMA | CO. BR.: ON EW-81, OVER BLUE CR., 4.2 MI WEST OF MERIDIAN | Bridge Replacement | $400,000 | |
OKLAHOMA | CO. BR. OVER GUY SANDY CREEK, 7.6 MILES NORTH AND .7 MILE WEST OFSULPHUR IN MURRAY COUNTY | Bridge Replacement | $600,000 | |
OKLAHOMA | CO BR.: OVER CLEAR CR, 1.9 MI EAST & 7.0 MI SOUTH OF THE I-35/SH-51 JCT. | Bridge Replacement | $400,000 | |
OKLAHOMA | CO BR: OVER AN UNNAMED CREEK, 1.0 MI SOUTH & 3.9 MI WESTOF PIEDMONT | Bridge Replacement | $462,972 | |
OKLAHOMA | CO BR: OVER A TRIB OF THE N. CANADIAN RIVER, 2.0 MI NORTH &3.6 MI EAST OF GEARY | Bridge Replacement | $166,877 | |
OKLAHOMA | CO. BR.: ON (EW-185) OVER A TRIB. TO EASR CACHE CR., 2.0 MI SOUTH &1.0 MI EAST OF SH-53/SH-5 JCT., IN WALTERS | Bridge Replacement | $239,425 | |
OKLAHOMA | CO. BR. OVER MUD CREEK, 7.8 MILES WEST SH-89 ON EW-193 | Bridge Replacement | $477,024 | |
OKLAHOMA | CO. BR. OVER SIMON CR. 5.3 MI NORTH & 3.0 MI EAST OF SH-76/SH-32 JCT.(REPLACE LOW WATER CROSSING) | New Bridge Construction | $519,881 | |
OKLAHOMA | CO BR OVER DEER CR, 3.5 MI SOUTH & 7.7 MI EAST OF SH-53/US-81 JCT | Bridge Replacement | $382,956 | |
OKLAHOMA | CO BR OVER STAGE STAND CR, 6.0 MI SOUTH & 6.0 MI WEST OF THE NORTHSH-7/US-81 JCT, | Bridge Replacement | $452,164 | |
OKLAHOMA | CO. BR. OVER BUFFALO CREEK LOCATED 7.5 MILES NORTH OF ERICK ON EW-117 | Bridge Replacement | $707,000 | |
OKLAHOMA | CO. BR.: OVER BARNITZ CR., 4.0 MI WEST & 3.5 MI NORTH OF CLINTON | Bridge Replacement | $465,500 | |
OKLAHOMA | CO BR: OVER THE SOUTH CANADIAN RIVER, 1.7 MILES NORTH AND6.8 MILES WEST OF OAKWOOD | Bridge Replacement | $1,726,572 | |
OKLAHOMA | CO. BR. OVER UNNAMED CR, 5.5 MI WEST & 3.0 MI SOUTH OF WILLOWON NS-189 | Bridge Replacement | $360,000 | |
OKLAHOMA | CO. BR. OVER DEEP RED CR., 0.6 MI. S. & 3.2 MI. E. OF LOVELAND, OKLAHOMA ONNS-239 | Bridge Replacement | $445,109 | |
OKLAHOMA | CO RD: ON NS-271, FROM SH-45, 1.0 MILE WEST OF GOLTRY, NORTH | Pavement Improvement | $468,364 | |
OKLAHOMA | CO BR: (NS-146) OVER COON CR, APPROX. 7.0 MI EAST & 3.5 MI SOUTHOF ELMWOOD | Bridge Replacement | $496,040 | |
OKLAHOMA | CO. BR. OVER THE BEAVER RIVER, 1.2 MI NORTH OF FELT, ON NS-13 | Bridge Improvement | $267,370 | |
OKLAHOMA | CO. BR.: OVER SKELETON CR., 0.6 MI NORTH & 6.6 MI EAST OFWAUKOMIS (CN #188) | Bridge Replacement | $539,870 | |
OKLAHOMA | CO. BR. OVER SAND CREEK, I MILE NORTH AND 1.5 MILES EAST OF THESH-11/SH-132 JCT | Bridge Replacement | $516,378 | |
OKLAHOMA | CO. RD. BEGIN 5.3 MI. S. OF POND CREEK @ GARFIELD C/L, EXTEND N. 5.3 MI. | Pavement Improvement | $50,000 | |
OKLAHOMA | CO BR: OVER A TRIBUTARY OF CAMPBELL CREEK, 4.5 MILES WEST OF SH-74F INCASHION | Bridge Replacement | $571,545 | |
OKLAHOMA | CO. BR: OVER RED ROCK CREEK, 0.7 MI WEST OF THE US-77/SH-15 JCTSOUTHWEST OF CERES | Bridge Replacement | $765,687 | |
OKLAHOMA | CO. BR. OVER BULL CR., 3.0 MI WEST & 3.4 MI NORTH OF THE SH-3/US-83JCT AT BRYAN'S CORNER (NS-119) | Bridge Replacement | $439,600 | |
OKLAHOMA | CAUSEWAY OVER LAKE EUFAULA APPROX. 2 MI EAST OF CROWDER, EAST 0.75 MI(PHASE I) (ROADWAY) (6110C) | Pavement Widening | $450,000 | |
OKLAHOMA | OKLAHOMA CITY | TRAFFIC SIGNAL UPGRADES & INTERCONNECT ON 24TH AVE WEST BEG @ SH-9 &EXT NORTH TO TECUMSEH RD, IN NORMAN | Safety/Traffic Management | $598,663 |
OKLAHOMA | I-35: FROM MILE MARKER 198 TO 203(RESURFACE) **AUTH** | Pavement Widening | $8,474,000 | |
OKLAHOMA | SH-3 BEG 0.36 MILES S. OF THE KINGFISHER C/L EXTENDING S.E. 15.54 MILES. | Pavement Improvement | $2,500,000 | |
OKLAHOMA | US-60 BEG @ MAJOR C/L & EXTEND EAST APPROX 5.0 MILE. | Pavement Improvement | $2,201,741 | |
OKLAHOMA | US183: FROM APPROX 2.8 MI SOUTHWEST OF SH-152, NORTHEAST APPROX 2.5 MI(RECON TO 4-LN UNDIVIDED)(DEL FR 03-09, ADD TO 04-09; AS PER O.E) | Pavement Widening | $3,781,000 | |
OKLAHOMA | US-270 BEG APPROX 0.3 MILE WEST OF SH-58 NORTH & EXT EAST APPROX 7.9 MILE(EAST & WEST BND LNS) | Pavement Improvement | $2,778,000 | |
OKLAHOMA | TULSA | BROKEN ARROW ARRA: KENOSHA ST: MAIN ST TO SIXTH ST | Pavement Improvement | $321,000 |
OKLAHOMA | TULSA | BROKEN ARROW ARRA: KENOSHA ST: HICKORY COURT TO ASPEN AVE (145TH E AVE) | Pavement Improvement | $344,000 |
OKLAHOMA | TULSA | SAND SPRINGS ARRA: EUCHEE CR BLVD TO NW | Pavement Improvement | $585,000 |
OKLAHOMA | TULSA | TULSA ARRA: MOHAWK BLVD - CINCINNATI TO HARTFORD | Pavement Improvement | $1,900,000 |
OKLAHOMA | TULSA | TULSA ARRA: 31ST STREET S., FROM 129TH E. AVE TO 145TH E. AVE | Pavement Improvement | $1,500,000 |
OKLAHOMA | US-60: BEGIN .75 MI EAST OF OSAGE/KAY CO. LINE, EXTEND EAST 4.44 MI.(ADD ALTERNATES) | Pavement Improvement | $1,240,000 | |
OKLAHOMA | SH-99: BEGIN 0 .86 MI. NORTH OFJCT. SH-99/SH-20, EXTEND NORTH 4.17 MI. | Pavement Improvement | $670,000 | |
OKLAHOMA | US-64: BEGIN AT INTERSECTION OF SH-99, EXTEND EAST 7.65 MI.(ADD ALTERNATES) | Pavement Improvement | $2,108,340 | |
OKLAHOMA | US-64: BEGIN 0.6 MI. E. OF JCT. US-64/SH-48, EXTEND EAST 6.7 MI. | Pavement Improvement | $1,141,660 | |
OKLAHOMA | I-40: BEG 0.53 MI W OF W END ARK RVR BR EXTEND E 2.77 MI, SH-10 FROM S RAMP OF I-40 EXTEND N 1.62 MI. | Pavement Improvement | $2,360,000 | |
OKLAHOMA | LAWTON | I-44: FROM 1.6 MILES NORTH OF SH-7, NORTH 1.52 MI TO JUST SOUTH OFSITTING BEAR CREEK (DEL FR 05-09, ADD TO 06-09; BID REJECT) | Pavement Improvement | $14,217,384 |
OKLAHOMA | US-412/US-56 BEG @ US-287 SOUTH & EXT EAST APPROX 7.5 MILE | Pavement Improvement | $2,150,000 | |
OKLAHOMA | OKLAHOMA CITY | CASHION ARRA: COUNTY LINE RD, FROM SEWARD RD TO FOREST HILL RD | Pavement Improvement | $225,000 |
OKLAHOMA | OKLAHOMA CITY | CLEVELAND CO. ARRA: ETOWAH RD, FROM 108TH AVE TO 180TH AVE SE | Pavement Improvement | $587,300 |
OKLAHOMA | OKLAHOMA CITY | FOREST PARK ARRA: NE 36TH FROM BRYANT TO COLTRANE | Pavement Improvement | $225,000 |
OKLAHOMA | OKLAHOMA CITY | JONES ARRA: MAIN STREET | Pavement Improvement | $225,000 |
OKLAHOMA | OKLAHOMA CITY | LOGAN CO. ARRA: PENNSYLVANIA FROM THE OK COUNTY LINE, NORTH | Pavement Improvement | $506,400 |
OKLAHOMA | OKLAHOMA CITY | MOORE ARRA; NW 27TH:SANTA FE TO JANEWAY, NW 12TH: SANTA FE TOJANEWAY, JANEWAY: NW 27TH TO NW 12TH | Pavement Improvement | $600,000 |
OKLAHOMA | OKLAHOMA CITY | MUSTANG ARRA: N SARA RD FROM SH-152 TO SW 59TH & S MUSTANG RDFROM SW 89TH TO SH-152 | Pavement Improvement | $517,200 |
OKLAHOMA | OKLAHOMA CITY | NICOMA PARK ARRA: HICKMAN FROM NE 10TH TO SEWELL | Pavement Improvement | $100,000 |
OKLAHOMA | OKLAHOMA CITY | NORMAN ARRA: MULTIPLE LOCATIONS, CITY WIDE | Pavement Improvement | $2,210,400 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: E. MEMORIAL AVE FROM EASTERN TO MIDWEST BLVD | Pavement Improvement | $1,750,000 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: MULTIPLE LOCATIONS ON MACARTHUR, MAY, PENN, CLASSEN& NE 36TH | Pavement Improvement | $3,480,000 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: NW 23 FROM E. OVERHOLSER TO COUNCIL & COUNCIL FROMNW 10 TO NW 23 | Pavement Improvement | $720,000 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: MAY FROM SW 44TH TO RENO | Pavement Improvement | $1,080,000 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: S. SHIELDS FROM SE 44TH TO SE 89TH & SE 89TH FROM SHIELDSTO I-35 | Pavement Improvement | $1,514,850 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: MULTIPLE LOCATIONS IN OKC ON SW 89TH, PENN, SW 119TH &MAY (PART IN OK COUNTY) | Pavement Improvement | $1,416,273 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: MULTIPLE LOCATIONS ON MACARTHUR, MERIDIAN, MAY &NW 10TH | Pavement Improvement | $2,600,000 |
OKLAHOMA | OKLAHOMA CITY | OKC ARRA: MIDWEST BLVD FROM SOUTH CITY LIMITS NORTH TO MEMORIAL | Pavement Improvement | $2,600,000 |
OKLAHOMA | OKLAHOMA CITY | OK COUNTY ARRA: LUTHER RD FROM SH-66 NORTH | Pavement Improvement | $710,300 |
OKLAHOMA | OKLAHOMA CITY | PIEDMONT ARRA: PIEDMONT RD FROM ARROWHEAD ST (192) TO APACHE ST (206) | Pavement Improvement | $188,523 |
OKLAHOMA | OKLAHOMA CITY | SPENCER ARRA: SPENCER RD FROM NE 23 TO NE 36 | Pavement Improvement | $225,000 |
OKLAHOMA | OKLAHOMA CITY | THE VILLAGE ARRA: PENNSYLVANIA AVE FROM BRITTON TO HEFNER | Pavement Improvement | $295,000 |
OKLAHOMA | TULSA | SAND SPRINGS ARRA: E 2ND STREET - MAIN TO ADAMS | Pavement Improvement | $233,203 |
OKLAHOMA | US-287: FROM APPROX. 7.0 MI SOUTH OF US-64, SOUTH 0.83 MILES | Pavement Improvement | $2,084,606 | |
OKLAHOMA | CO. BR. OVER EIGHT MILE CR, 1.6 MI SOUTH OF HENNEPIN | Bridge Replacement | $300,000 | |
OREGON | EWEB BIKE PATH: PIONEER PKWY - 31ST STREET (SPRINGFIELD) LOCAL 3 IN OVERLAY IN ACCORDANCE W/ 1R GUIDELINES LANE | Other | $5,000 | |
OREGON | SALEM AVE: SHERMAN ST-UP RAILROAD PAVEMENT OVERLAY VARIOUS HIGHWAYS LINN COUNTY | Pavement Improvement | $869,009 | |
OREGON | SALEM AVE: SHERMAN ST.- UP RAILROAD PAVEMENT OVERLAY LOCAL PAVEMENT OVERLAY IN ACCORDANCE WITH 1R GUIDELINES LINN | Other | $10,000 | |
OREGON | HERSEY ST: OAK ST-ANN ST SIDEWALK (ASHLAND) VARIOUS HIGHWAYS JACKSON COUNTY | Transportation Enhancements | $135,735 | |
OREGON | MEDFORD | ASHLAND CITY STREETS: PAVEMENT OVERLAY LOCAL 2 IN PAVEMENT OVERLAY IN ACCORDANCE WITH 1R GUIDELINES JACKSON | Other | $20,000 |
OREGON | HERSEY ST: OAK ST-ANN ST SIDEWALK (ASHLAND) LOCAL SIDEWALK RECONSTRUCTION JACKSON | Other | $5,000 | |
OREGON | MEDFORD | ASHLAND CITY STREETS: PAVEMENT OVERLAY JACKSON COUNTY | Pavement Improvement | $417,241 |
OREGON | OR99E: MAIN ST - 4TH ST SIDEWALK (AURORA) PACIFIC EAST HIGHWAY MARION COUNTY | Transportation Enhancements | $139,817 | |
OREGON | OR99E: MAIN ST - 4TH ST SIDEWALK (AURORA) LOCAL CONSTRUCT SIDEWALKS, CURB, DRAINAGE & LANDSCAPE ON 99E MARION | Other | $10,000 | |
OREGON | PORTLAND (WA) | HALL BLVD: HART RD - RIDGECREST DR OVERLAY LOCAL 2 IN OVERLAY IN ACCORDANCE WITH 1R GUIDELINES WASHINGTON | Other | $50,000 |
OREGON | PORTLAND (WA) | LAURELWOOD AVE & 87TH AVE SIDEWALKS (BEAVERTON) LOCAL CONSTRUCTING SIDEWALKS & ADA RAMPS WASHINGTON | Other | $240,000 |
OREGON | BEND | CITY OF BEND STREET PAVING LOCAL 2 IN OVERLAY IN ACCORDANCE W/ 1R GUIDELINES DESCHUTES | Other | $50,000 |
OREGON | N KNIGHTS BRIDGE RD: KNIGHTS BR N GRANT ST (CANBY) LOCAL 2 IN OVERLAY IN ACCORDANCE WITH 1R GUIDELINES CLACKAMAS | Other | $40,000 | |
OREGON | MEDFORD | PINE ST: 1ST ST TO 6TH ST (CENTRAL POINT) LOCAL REPAVE ROADWAY & OVERLAY, INSTALL SIGNAGE & SIGNALS JACKSON | Other | $25,000 |
OREGON | US30 @ BREWERY GRADE INTERSECTION (THE DALLES) BREWERY GRADE ROAD WASCO COUNTY | Pavement Improvement | $2,524,024 | |
OREGON | EUGENE | E. LOCUST ST-N. DIAMOND ST PRESERVATION (COBURG) LOCAL OVERLAY ROADWAYS & IMPROVE STREET DRAINAGE LANE | Other | $10,000 |
OREGON | OR 8: N 10TH AVE-N 19TH AVE (CORNELIUS) TUALATIN VALLEY RECONSTRUCT MAIN ST COUPLET/+ CURBS,SIDEWALK, & SIGNAL WASHINGTON | Other | $40,000 | |
OREGON | PORTLAND (WA) | OR 8: N 10TH AVE-N 19TH AVE (CORNELIUS) TUALATIN VALLEY HIGHWAY WASHINGTON COUNTY | Pavement Improvement | $385,000 |
OREGON | CORVALLIS | ARRA FHWA GRIND/INLAY (CORVALLIS) SEC VARIOUS HIGHWAYS BENTON COUNTY | Pavement Improvement | $1,246,491 |
OREGON | CORVALLIS-PHILOMATH PATH RESURFACING VARIOUS HIGHWAYS Benton County | Pavement Improvement | $483,000 | |
OREGON | DALLAS CITY STREETS: PAVING POLK COUNTY | Pavement Improvement | $318,807 | |
OREGON | DALLAS CITY STREETS: PAVING LOCAL PAVEMENT PRESERVATION PROJECT POLK | Other | $10,000 | |
OREGON | EUGENE TRAIN DEPOT (UNIT 2) LANE COUNTY | Transportation Enhancements | $177,946 | |
OREGON | EUGENE | Delta Ponds Path: Goodpasture Island Rd. - Robin Hood Ave. City of Eugene Lane County | Transportation Enhancements | $2,053,583 |
OREGON | EUGENE | GARFIELD ST: W 6TH AVE - W 11TH AVE (EUGENE) LOCAL LOCAL PAVEMENT PRESERVATION PROJECT LANE | Other | $81,000 |
OREGON | EUGENE | CRESCENT AVE: GAMEFARM RD - 50'W OF SHADOWVIEW (EUGENE) LOCAL LOCAL PAVEMENT PRESERVATION LANE | Other | $35,000 |
OREGON | EUGENE | HIGH ST: 3RD AVE - 17TH AVE (EUGENE) LOCAL LOCAL PAVEMENT PRESERVATION LANE | Other | $76,000 |
OREGON | CITY OF FLORENCE STREET PAVING PROJECT LOCAL PAVEMENT OVERLAY IN ACCORDANCE WITH 1R GUIDELINES LANE | Other | $15,000 | |
OREGON | PORTLAND (WA) | FOREST GROVE TOWN CENTER PED. IMPRV LOCAL RD INCREAST PED/BIKE SAFETY THRU CONNECTIVITY WASHINGTON | Other | $170,000 |
OREGON | PORTLAND (WA) | FOREST GROVE PED IMPROVEMENTS:19TH AVE-PACIFIC AVE WASHINGTON COUNTY | Transportation Enhancements | $1,490,000 |
OREGON | PORTLAND (WA) | FOREST GROVE PED IMPROVEMENTS: 19TH AVE - PACIFIC AVE N/A INCREASE PED/BIKE SAFETY THRU CONNECTIVITY WASHINGTON | Other | $66,978 |
OREGON | PORTLAND (WA) | GLADSTONE PAVEMENT PRESERVATION PROJECT LOCAL 2 IN OVERLAY IN ACCORDANCE W/1R GUIDELINES, W/GRIND AT INTERSECTION CLACKAMAS | Other | $100,000 |
OREGON | GRANTS PASS CITY STREETS: PAVEMENT RESURFACING LOCAL 2 IN OVERLAY IN ACCORDANCE W/1R GUIDELINES JOSEPHINE | Other | $45,000 | |
OREGON | PORTLAND (WA) | 242ND / HOGAN RD: GLISAN ST-STARK ST WIDENING LOCAL WIDEN ST TO INCLUDE 4 TRAVEL LANES, CENTER & BIKE LANES, SIDEWALKS MULTNOMAH | Other | $50,000 |
OREGON | PORTLAND (WA) | CITY OF HAPPY VALLEY STREET MAINT. & RECONSTRUCTION LOCAL RESURFACE, SLURRY SEAL, CRACK & CHIP SEAL- MINOR ART STREETS CLACKAMAS | Other | $77,000 |
OREGON | 1ST ST & MAIN AVE SIDEWALK & BIKE LANES (IRRIGON) VARIOUS HIGHWAYS MORROW COUNTY | Transportation Enhancements | $845,214 | |
OREGON | 1ST ST & MAIN AVE SIDEWALK & BIKE LANES (IRRIGON) LOCAL CONSTRUCT WIDEWALKS, BIKE LANE AND A PLANTER STRIP W/TREES MORROW | Other | $85,356 | |
OREGON | MEDFORD | C ST: BIKE / PED IMPROVEMENTS (JACKSONVILLE) LOCAL CONSTRUCT BIKE LANES AND SIDEWALKD JACKSON | Other | $21,000 |
OREGON | INTERMODAL PEDESTRIAN CONNECTIONS (KLAMATH FALLS) KLAMATH COUNTY | Transportation Enhancements | $136,098 | |
OREGON | PORTLAND (WA) | ROYCE & MCNARY ST: PVMT GRIND/OVERLAY (LAKE OSWEGO) LOCAL GRIND & REPLACE 2 IN OF ASPHALT IN ACCORDANCE W/1R GUIDELINES CLACKAMAS | Other | $40,000 |
OREGON | 2ND ST & AIRPORT RD PAVING & STRIPING (LEBANON) LOCAL 2 IN OVERLAY & STRIPING IN ACCORDANCE WITH 1R GUIDELINES LINN | Other | $50,000 | |
OREGON | MCMINNVILLE STREETS:PAVEMENT RESURFACING&ADA RAMPS VARIOUS HIGHWAY YAMHILL COUNTY | Pavement Improvement | $874,200 | |
OREGON | MCMINNVILLE STREETS:PAVEMENT RESURFACING&ADA RAMPS LOCAL 2 IN OVERLAY IN ACCORDANCE WITH 1R GUIDELINES YAMHILL | Other | $10,000 | |
OREGON | US26: MAIN ST SIDEWALKS & STREETSCAPE (MT VERNON) JOHN DAY HIGHWAY GRANT COUNTY | Transportation Enhancements | $75,000 | |
OREGON | BAY BLVD SIDEWALK, LIGHTS & PAVING (NEWPORT) LINCOLN COUNTY | Pavement Improvement | $583,000 | |
OREGON | BAY BLVD SIDEWALK, LIGHTS & PAVING (NEWPORT) LOCAL GRINDING & RESURFACING, CURBS, GUTTERS AND SIDEWALKS: LIGHTS LINCOLN | Other | $10,000 | |
OREGON | MEDFORD | TALENT AND PHOENIX OVERLAYS VARIOUS HIGHWAYS JACKSON COUNTY | Pavement Improvement | $465,693 |
OREGON | NEWPORT CITY STREETS: PAVEMENT RESURFACING LOCAL PAVEMENT PRESERVATION PROJECT LINCOLN | Other | $10,000 | |
OREGON | NEWPORT CITY STREETS: PAVEMENT RESURFACING LINCOLN COUNTY | Pavement Improvement | $216,483 | |
OREGON | N OREGON ST: IDAHO AVE-NW 1ST ST (ONTARIO) VARIOUS HIGHWAY MALHEUR COUNTY | Pavement Improvement | $1,947,282 | |
OREGON | PORTLAND (WA) | WARNER MILNE RD: BEAVERCREEK-MOLALLA (OREGON CITY) VARIOUS HIGHWAYS CLACKAMAS COUNTY | Safety/Traffic Management | $885,000 |
OREGON | MCLOUGHLIN PROMENADE:7TH ST-S 1ST ST (OREGON CITY) VARIOUS HIGHWAYS CLACKAMAS COUNTY | Transportation Enhancements | $1,065,721 | |
OREGON | PORTLAND (WA) | WARNER MILNE RD: BEAVERCREEK-MOLALLA (OREGON CITY) LOCAL REALIGn INTERSECTION, UPDATE SIGNAL TIMING AND ADD SIDEWALKS CLACKAMAS | Other | $15,000 |
Source: FDIC