###### (Automatically generated documentation) # Replace Exterior Window Constructions with a Different Construction from the Model. ## Description ## Modeler Description ## Measure Type ModelMeasure ## Taxonomy ## Arguments ### Pick a Window Construction From the Model to Replace Existing Window Constructions. **Name:** construction, **Type:** Choice, **Units:** , **Required:** true, **Model Dependent:** false ### Change Fixed Windows? **Name:** change_fixed_windows, **Type:** Boolean, **Units:** , **Required:** true, **Model Dependent:** false ### Change Operable Windows? **Name:** change_operable_windows, **Type:** Boolean, **Units:** , **Required:** true, **Model Dependent:** false ### Remove Existing Costs? **Name:** remove_costs, **Type:** Boolean, **Units:** , **Required:** true, **Model Dependent:** false ### Material and Installation Costs for Construction per Area Used ($/ft^2). **Name:** material_cost_ip, **Type:** Double, **Units:** , **Required:** true, **Model Dependent:** false ### Demolition Costs for Construction per Area Used ($/ft^2). **Name:** demolition_cost_ip, **Type:** Double, **Units:** , **Required:** true, **Model Dependent:** false ### Years Until Costs Start (whole years). **Name:** years_until_costs_start, **Type:** Integer, **Units:** , **Required:** true, **Model Dependent:** false ### Demolition Costs Occur During Initial Construction? **Name:** demo_cost_initial_const, **Type:** Boolean, **Units:** , **Required:** true, **Model Dependent:** false ### Expected Life (whole years). **Name:** expected_life, **Type:** Integer, **Units:** , **Required:** true, **Model Dependent:** false ### O & M Costs for Construction per Area Used ($/ft^2). **Name:** om_cost_ip, **Type:** Double, **Units:** , **Required:** true, **Model Dependent:** false ### O & M Frequency (whole years). **Name:** om_frequency, **Type:** Integer, **Units:** , **Required:** true, **Model Dependent:** false