add_cost_per_floor_area_to_electric_equipment
42cf1acc-c0bc-46cd-af67-8a17cadaab7b
878740df-ba76-4b19-9baf-e845b66097e0
20221115T223556Z
35DA4ED3
AddCostPerFloorAreaToElectricEquipment
Add Cost per Floor Area to Electric Equipment
This measure will create life cycle cost objects associated with electric equipment. You can choose any electric equipment definition used in the model that has a watt/area power. You can set a material and installation cost, demolition cost, and O&M costs. Optionally existing cost objects already associated with the selected electric equipment definition can be deleted. This measure will not affect energy use of the building.
This measure has a choice input populated with watt/area electric equipment definitions used in spaces in the model. It will add a number of life cycle cost objects and will associate them with the selected definition. In addition to the inputs for the cost values, a number of other inputs are exposed to specify when the cost first occurs and at what frequency it occurs in the future. This measure is intended to be used as an 'Always Run' measure to apply costs to objects that design alternatives will impact. This will add costs to the baseline model before any design alternatives manipulate it. As an example, if you plan adjust the performance and cost of electric equipment by a percentage, you will want to use this to cost the baseline definition.
For baseline costs, 'Years Until Costs Start' indicates the year that the capital costs first occur. For new construction this will be typically be 0 and 'Demolition Costs Occur During Initial Construction' will be false. For a retrofit 'Years Until Costs Start' is between 0 and the 'Expected Life' of the object, while 'Demolition Costs Occur During Initial Construction' is true. O&M cost and frequency can be whatever is appropriate for the component
equip_def
Choose a Watts per Area Electric Equipment Definition to Add Costs to
Choice
true
false
remove_costs
Remove Existing Costs
Boolean
true
false
true
true
true
false
false
material_cost_ip
Material and Installation Costs for Construction per Area Used
Double
$/ft^2
true
false
0
demolition_cost_ip
Demolition Costs for Construction per Area Used
Double
$/ft^2
true
false
0
years_until_costs_start
Years Until Costs Start
Integer
whole years
true
false
0
demo_cost_initial_const
Demolition Costs Occur During Initial Construction
Boolean
true
false
false
true
true
false
false
expected_life
Expected Life
Integer
whole years
true
false
20
om_cost_ip
O & M Costs for Construction per Area Used
Double
$/ft^2
true
false
0
om_frequency
O & M Frequency
Integer
whole years
true
false
1
Economics.Life Cycle Cost Analysis
Measure Type
ModelMeasure
string
Measure Function
Measure
string
Requires EnergyPlus Results
false
boolean
Uses SketchUp API
false
boolean
0416_NetArea_b.osm
osm
test
3D3EE8E9
README.md.erb
erb
readmeerb
703C9964
README.md
md
readme
F4D7E305
OpenStudio
2.0.0
2.0.0
measure.rb
rb
script
808F6B1D
AddCostPerFloorAreaToElectricEquipment_Test.rb
rb
test
146B4156
LICENSE.md
md
license
64FFEBDE