Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
UTAH | OGDEN | Asphalt Pavement Rehab | Pavement Improvement | $2,000,000 |
UTAH | PROVO-OREM | Rotomill, Micro-surface | Pavement Improvement | $3,811,434 |
UTAH | PROVO-OREM | Rotomill, Miro-Surface | Pavement Improvement | $1,948,677 |
UTAH | Bridge Replacement | Bridge Replacement | $6,300,000 | |
UTAH | SALT LAKE CITY | ROAD- WIDEN RAMPS , PROVIDE DUAL EXIT LANES | Pavement Widening | $2,200,228 |
UTAH | Grading, Drainage, Surfacing | Pavement Improvement | $2,000,000 | |
UTAH | PROVO-OREM | Trail - New Construction | Other | $2,400,000 |
UTAH | PROVO-OREM | ROAD - ASPHALT PAVEMENT RECONSTRUCTION | Pavement Improvement | $1,103,843 |
UTAH | Road - Asphalt Pavement Reconstruction | Pavement Improvement | $1,290,303 | |
UTAH | ENVIRONMENTAL/RIGHT OF WAY/CONSTRUCTION (Advance Construct) | Pavement Improvement | $2,400,000 | |
VERMONT | REHABILITATION OF TH3 ("VT143") IN SPRINGFIELD | Pavement Widening | $2,413,661 | |
VERMONT | BURLINGTON | NECESSARY IMPROVEMENTS TO TRUSS BR31 ON TH1 (BRIDGE ST.) IN RICHMOND VILLAGE, OVER THE WINOOSKI RIVER. | Bridge Improvement | $1,990,999 |
VERMONT | REPLACEMENT OF BR74 ON US2 IN EAST MONTPELIER, OVER THE WINOOSKI RIVER. | Bridge Replacement | $2,301,277 | |
VERMONT | PROJECT IS FOR REHABILITATION OF BRIDGE NO. 67 ON VT15 (TH1) IN HARDWICK, OVER COOPER BROOK. | Bridge Improvement | $1,400,336 | |
VERMONT | RESURFACE I-89 IN ROYALTON AND BETHEL | Pavement Improvement | $9,292,057 | |
VERMONT | CULVERT LINING ALONG I-89 UNDER BOTH BARRELLS. | Pavement Improvement | $1,301,016 | |
VERMONT | REPLACEMENT OF BR8 ON TH2 IN BROWNINGTON, OVER THE WILLOUGHBY RIVER. | Bridge Replacement | $1,225,051 | |
VERMONT | RESURFACING US5 IN HARTFORD AND NORWICH | Pavement Improvement | $2,302,625 | |
VERMONT | Resurfacing VT 25 in Bradford, Corinth, Topsham and Orange. | Pavement Improvement | $5,192,371 | |
VERMONT | Resurface VT104 in Fairfax and St. Albans. | Pavement Improvement | $5,061,875 | |
VERMONT | RESURFACE US5 IN NORWICH, ALSO INCLUDES VT10A (0.522 MILES) AND THE NORWICH STATE HIGHWAY | Pavement Improvement | $2,290,403 | |
VERMONT | RESURFACE US2 (CLASS I TH) IN MONTPELIER ALSO INCLUDES 0.036 MILE OF THE MONTPELIER STATE HIGHWAY | Pavement Improvement | $2,441,716 | |
VERMONT | RESURFACE VT4A IN FAIR HAVEN AND CASTLETON | Pavement Improvement | $2,783,556 | |
VERMONT | RESURFACE THE CLASS I PORTION OF VT4A IN FAIR HAVEN | Pavement Improvement | $1,217,777 | |
VERMONT | BURLINGTON | RESURFACE VT15 IN COLCHESTER AND ESSEX, | Pavement Improvement | $2,433,850 |
VERMONT | BURLINGTON | RESURFACE VT15 (CLASS I) IN WINOOSKI, INCLUDES RESEALING AND REPAIRING CONCRETE PAVEMENT JOINTS ON US7, AND THE US7 APPROACHES. | Pavement Improvement | $1,968,008 |
VERMONT | RESURFACE US302 IN MONTPELIER | Pavement Improvement | $711,504 | |
VERMONT | RESURFACE VT103 IN ROCKINGHAM AND CHESTER | Pavement Improvement | $4,095,864 | |
VERMONT | RESURFACE VT14 (CLASS I) IN HARTFORD, BEGINNING AT THE US5/US4 INTERSECTION AND INCLUDES US4, | Pavement Improvement | $1,623,410 | |
VERMONT | Resurface VT114 in Brighton, Morgan and Warren Gore. | Pavement Improvement | $6,870,730 | |
VERMONT | Resurface VT114 in Warren Gore and Norton. | Pavement Improvement | $6,529,154 | |
VERMONT | BURLINGTON | RESURFACE ASPHALT PAVEMENT AND RESEAL/REPAIR CONCRETE PAVEMENT ON US7 IN BURLINGTON, | Pavement Improvement | $940,713 |
VERMONT | BURLINGTON | RESEAL/REPAIR CONCRETE PAVEMENT JOINTS, AND RESURFACE ASPHALT PAVEMENT ON US7 (CLASS I) | Pavement Improvement | $726,308 |
VERMONT | REHABILITATION OF BRIDGE NO. 7 ON PROSPECT STREET IN BARRE CITY, OVER THE STEVENS BRANCH OF THE WINOOSKI RIVER. | Bridge Improvement | $1,341,315 | |
VERMONT | Resurface I-91 in Waterford, St. Johnsbury and Lyndon. | Pavement Improvement | $3,075,243 | |
VIRGIN ISLANDS | Red Hook Sidewalk and Drainage Improvements. St. Thomas, USVI | Other | $1,050,360 | |
VIRGIN ISLANDS | ARRA- Queen Mary Highway, Rte. 70. From Peter's Rest (Cool Out Bar) to Contentment. St. Croix, USVI | New Construction | $4,859,669 | |
VIRGIN ISLANDS | Route 104 Improvements, Phase II: Gift Hill Road, from the Westin Hotel to Susannaburg. St. John, USVI | New Construction | $4,782,469 | |
VIRGINIA | ROANOKE | ConcreteUndersealing/Pavingw/guardrail upgrades on I81 in Botetourt County | Pavement Improvement | $18,368,862 |
VIRGINIA | RICHMOND | Resurfacing and guardrail items | Pavement Improvement | $7,659,095 |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | CRCP/overlay, guardrail upgrade, shoulder restoration and median barrier replacement | Pavement Improvement | $17,940,849 |
VIRGINIA | Resurfacing and guardrail upgrade | Pavement Improvement | $6,572,402 | |
VIRGINIA | BRISTOL (VA-TN) | Milling, paving and guardrail upgrade | Pavement Improvement | $3,065,402 |
VIRGINIA | Pavement rehabilitation, guardrail replacement and drainage structures | Pavement Improvement | $4,429,997 | |
VIRGINIA | Resurfacing and guardrail items | Pavement Improvement | $2,951,120 | |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | Pavement overlay and guardrail upgrade | Pavement Improvement | $5,783,940 |
VIRGINIA | FREDERICKSBURG | Asphalt resurfacing | Pavement Improvement | $13,155,856 |
VIRGINIA | Asphalt resurfacing | Pavement Improvement | $3,286,262 | |
VIRGINIA | Asphalt resurfacing | Pavement Improvement | $5,767,597 | |
VIRGINIA | Asphalt resurfacing | Pavement Improvement | $4,625,261 | |
VIRGINIA | CHARLOTTESVILLE | Resurfacing | Pavement Improvement | $4,847,872 |
VIRGINIA | Asphalt resurfacing | Pavement Improvement | $1,596,086 | |
VIRGINIA | WASHINGTON (DC-MD-VA) | Asphalt resurfacing | Pavement Improvement | $4,415,118 |
VIRGINIA | WASHINGTON (DC-MD-VA) | Pavement resurfacing | Pavement Improvement | $5,737,608 |
VIRGINIA | Culvert replacements and rehabilitations | Pavement Improvement | $10,965,900 | |
VIRGINIA | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $9,616,497 | |
VIRGINIA | ARRA Lynchburg District Design Build Culvert Rehabilitation | Pavement Improvement | $6,567,000 | |
VIRGINIA | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $15,168,450 | |
VIRGINIA | ROANOKE | ARRA Salem District 2009 Design Build - Culverts | Pavement Improvement | $681,450 |
VIRGINIA | Culvert replacements and rehabilitations | Pavement Improvement | $1,303,500 | |
VIRGINIA | FREDERICKSBURG | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $3,281,850 |
VIRGINIA | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $6,753,450 | |
VIRGINIA | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $785,400 | |
VIRGINIA | WASHINGTON (DC-MD-VA) | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $1,518,000 |
VIRGINIA | ROANOKE | Bridge superstructure replacements and substructure rehabilitations | Pavement Improvement | $1,126,950 |
VIRGINIA | ARRA Staunton District Superstructure Replacements | Pavement Improvement | $8,324,250 | |
VIRGINIA | FREDERICKSBURG | ARRA RTE 3 ADD THROUGH & RIGHT TURN LANES EBL & WBL | Pavement Widening | $25,214,915 |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | ARRA BRAC FT EUSTIS RTE 105 - CN OF PARALLEL LANES (WB) | Pavement Widening | $27,731,101 |
VIRGINIA | Resurfacing and guardrail upgrade | Pavement Improvement | $1,836,741 | |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | Pavement overlay and guardrail upgrade | Pavement Improvement | $7,815,875 |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | Asphalt Resurfacing (James City County - Rtes. I64, 60, 143 and 321) | Pavement Improvement | $7,311,083 |
VIRGINIA | Resurfacing and Guardrail Work on Rtes. 58 and 220 in Henry County | Pavement Improvement | $4,122,108 | |
VIRGINIA | Asphalt resurfacing | Pavement Improvement | $2,944,493 | |
VIRGINIA | Asphalt resurfacing | Pavement Improvement | $472,898 | |
VIRGINIA | WASHINGTON (DC-MD-VA) | ARRA - Semper Fidelis Memorial Park Trails | Other | $500,000 |
VIRGINIA | ROANOKE | ARRA- City of Salem, Roanoke River Greenway | Other | $600,000 |
VIRGINIA | ROANOKE | ARRA - City of Roanoke, Roanoke River Greenway | Other | $1,400,000 |
VIRGINIA | RICHMOND | ARRA- Virginia Capital Trail, New Market Heights Phase | Other | $8,183,825 |
VIRGINIA | ARRA - High Bridge Trail | Other | $2,000,000 | |
VIRGINIA | ARRA - Tobacco Heritage Trail | New Construction | $6,000,000 | |
VIRGINIA | ARRA - Historic Valley Turnpike - Bike and Pedestrian Trails | Other | $850,000 | |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | ARRA - WITCHDUCK RD - 6 LANES | Pavement Widening | $10,607,101 |
VIRGINIA | NEWP NEWS-HAMPTON-VA BEACH-NORFOLK | ARRA- CIty of Chesapeake, Dismal Swamp Canal Trail | Other | $1,300,000 |
WASHINGTON | ARRA-SR2 / MONROE CITY LIMIT TO SULTAN PAVING SR2-1.85 TO 7.08 MILES EAST OF JUNCTION SR522. | Pavement Improvement | $1,946,979 | |
WASHINGTON | ARRA - JUNCTION SR211 TO NEWPORT - PAVING SR2-VICINITY JUNCTION SR211 TO THE IDAHO / WASHINGTON STATE LINE. | Pavement Improvement | $7,819,040 | |
WASHINGTON | ARRA - WILBUR PEDESTRIAN IMPROVEMENTS SR2-1.05 TO 1.41 MILES EAST OF JUNCTION SR21. | Safety/Traffic Management | $160,000 | |
WASHINGTON | ARRA - Dayton, West Dayton Street Beautification FROM:WSDOT Maint Shop TO:Main/Pine LEN: 0.166MI | Transportation Enhancements | $148,593 | |
WASHINGTON | ARRA - CLIFFS ROAD VICINITY TO CHAMBERLAIN / GOODNOE ROAD - CHIP SEAL SR14-7.26 TO 12.62 MILES EAST OF JUNCTION SR97. | Pavement Improvement | $509,307 | |
WASHINGTON | ARRA - Washougal, SR 14 Pedestrian Tunnel FROM:500' E of 15th St TO: LEN: 0.000MI | Transportation Enhancements | $594,366 | |
WASHINGTON | Construct two roundabouts, center median, sidewalks, drainage, bike lanes, and turn lanes. | Pavement Widening | $1,959,623 | |
WASHINGTON | ARRA - Arlington, 188th Street Pedestrian Trail FROM:59th Ave TO:67th Ave. LEN: 0.570MI | Transportation Enhancements | $122,000 | |
WASHINGTON | ARRA - NORTH KELSO TO CASTLE ROCK - PAVING AND SAFETY SR5-12.48 TO 19.61 MILES SOUTH OF JUNCTION SR505. | Pavement Improvement | $8,104,791 | |
WASHINGTON | ARRA - SR5 / SR501 RIDGEFIELD INTERCHANGE - REBUILD SR501 INTERCHANGE SR5-2.23 TO 2.91 MILES NORTH OF JUNCTION SR502. | Bridge Replacement | $10,000,000 | |
WASHINGTON | PORTLAND-VANCOUVER, OR-WA | ARRA - I-205 JUNCTION TO DIKE ROAD - MEDIAN CABLE I-5 - VICINITY JUNCTION I-205 TO 14.76 MILES NORTH. | Safety/Traffic Management | $2,711,330 |
WASHINGTON | ARRA - KOONTZ ROAD TO HARRISON AVENUE VICINITY - PAVING AND SAFETY SR5-6.02 TO 19.31 MILES NORTH OF JUNCTION SR505. | Pavement Improvement | $3,479,263 | |
WASHINGTON | SEATTLE-TACOMA, WA | PORT OF TACOMA ROAD TO KING COUNTY LINE - H.O.V. SR5-0.47 TO 4.45 MILES NORTHEAST OF JUNCTION SR167. | Pavement Widening | $48,678,860 |
WASHINGTON | TACOMA | ARRA - EASTBOUND NALLEY VALLEY - ADD H.O.V. SR5-4.36 TO 5.36 MILES NORTH OF JUNCTION SR512. | Other | $7,784,925 |
WASHINGTON | ARRA - MARYSVILLE TO STILLAGUAMISH RIVER VICINITY - MEDIAN BARRIER SR5-VICINITY JUNCTION SR530 TO 10.00 MILES SOUTH. | Safety/Traffic Management | $2,500,000 | |
WASHINGTON | ARRA - SR532 VICINITY TO STARBIRD ROAD VICINITY - PCCP REHABILITATION SR5-1.77 TO 7.87 MILES SOUTH OF JUNCTION SR534. | Pavement Improvement | $7,184,050 | |
WASHINGTON | ARRA - Oroville ,5th Ave./SR 97 to 23rd Ave./SR 97 FROM:5th Ave/Hwy 97 TO:300' N of Westlke/97 LEN: 1.580MI | Transportation Enhancements | $1,055,000 | |
WASHINGTON | ARRA - CENTERVILLE RD. VIC. TO BICKELTON RD. BR. & SATUS PASS VIC. - PAVING SR97-30.63 TO 53.95 MILES SOUTH OF JUNCTION SR22. | Pavement Improvement | $3,536,233 | |
WASHINGTON | ARRA - Aberdeen, Heron Street Sidewalk Improvements FROM:K Street TO:F Street LEN: 0.400MI | Transportation Enhancements | $614,448 | |
WASHINGTON | ARRA - Orting, SR 162 Rechannelization/Streetscape FROM:Calistoga Street TO:Bridge Street LEN: 0.260MI | Pavement Improvement | $420,000 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Renton, Rainier Ave S/Shattuck Ave Stormwater FROM:S 4th Place TO:S 7th Street LEN: 0.220MI | Other | $2,000,000 |
WASHINGTON | ARRA - Castle Rock, Riverfront Trail Restoration FROM:Shintaffer St TO:800ft S of Shntffr LEN: 0.152MI | Transportation Enhancements | $66,578 | |
WASHINGTON | ARRA - STEPTOE TO SR271 - RUMBLE STRIPS - CENTERLINE SR195-5.82 TO 23.57 MILES NORTH OF JUNCTION SR26. | Safety/Traffic Management | $132,000 | |
WASHINGTON | Replace existing timber bridge with new pre stressed concrete bridge. | Pavement Improvement | $350,000 | |
WASHINGTON | ARRA - JUNCTION SR2 TO BRUCE ROAD - PAVING SR206-VICINITY JUNCTION SR2 TO 2.44 MILES EAST. | Pavement Improvement | $716,066 | |
WASHINGTON | Construct 4,700 LF of 5' wide sidewalk along Okoma Drive (SR 215) form Jasmine St. to W. 4th Avenue; installation of ADA compliant sidewalk ramps at intersections; crosswalks; 2,400 LF of new curb; an | Transportation Enhancements | $177,000 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Edmonds, Annual Asphalt Overlay Program FROM: TO: LEN: 2.000MI | Pavement Improvement | $999,985 |
WASHINGTON | ARRA - SPOKANE COUNTY LINE TO LOON LAKE - PAVING SR395-0.18 TO 6.89 MILES SOUTH OF JUNCTION SR292. | Pavement Improvement | $2,176,575 | |
WASHINGTON | ARRA - LOON LAKE TO IMMEL ROAD - PAVING SR395-16.95 TO 39.23 MILES SOUTH OF JUNCTION SR20 (COLVILLE). | Pavement Improvement | $8,225,774 | |
WASHINGTON | ARRA - Benton City ,7th Street Sidewalk FROM:Ellen Ave. TO:150' N of Hope Lane LEN: 0.436MI | Transportation Enhancements | $207,000 | |
WASHINGTON | ARRA - Wahkiakum Co., Ferry Ramp Replacement FROM:MP 3.92 TO: LEN: 0.020MI | Bridge Replacement | $590,000 | |
WASHINGTON | LONGVIEW (OR) | ARRA - LEWIS AND CLARK BRIDGE 433/1 - SUPERSTRUCTURE PAINTING SR433-0.40 TO 0.94 MILES SOUTH OF JUNCTION SR432. | Other | $1,000,000 |
WASHINGTON | ARRA - Tenino, Sussex Avenue Street Illumination FROM:Ritter TO:Ragless LEN: 0.400MI | Transportation Enhancements | $544,000 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Normandy Park, 1st Ave Phase II-A FROM:192 St SW TO:200th St SW LEN: 0.500MI | Pavement Improvement | $3,834,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Redmond, NE 36th Street Bridge FROM:NE 31st St TO:N 36th St Ovr SR 520 LEN: 0.500MI | New Bridge Construction | $4,594,075 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Everett, West Marine View Dr. Ped/Bike Imp FROM:10th St TO:16th St LEN: 0.530MI | Transportation Enhancements | $1,676,331 |
WASHINGTON | ARRA - Hoquiam ,Citywide Ped Safety & Mobility FROM: TO: LEN: 0.000MI | Transportation Enhancements | $195,000 | |
WASHINGTON | ARRA - Ilwaco, Beards Hollow Overlook FROM:SR 100 TO:@ Beard's Hollow LEN: 0.100MI | Transportation Enhancements | $100,000 | |
WASHINGTON | ADA ramps and sidewalk transition improvements on East and West Washington Street. | Transportation Enhancements | $170,000 | |
WASHINGTON | OLYMPIA | ARRA - Lacey, Woodland Trail Develpment Ph. 2 FROM:Chehalis Wstrn Trail TO:Woodland Crk Com.Ctr LEN: 2.400MI | Transportation Enhancements | $1,000,000 |
WASHINGTON | YAKIMA | ARRA - VALLEY MALL BOULEVARD INTERCHANGE IMPROVEMENTS SR82-1.23 TO 1.83 MILES SOUTH OF JUNCTION SR24. | Other | $1,264,317 |
WASHINGTON | ARRA - GRANGER TO W. GRANDVIEW WB - DOWEL BAR RETROFIT AND CONCRETE REHAB. SR82-9.76 TO 24.49 MILES NORTHWEST OF JUNCTION SR22. | Pavement Improvement | $6,898,932 | |
WASHINGTON | ARRA - SNOQUALMIE PASS VICINITY - CAMERA REPLACEMENT I-90 -19.58 TO 58.32 MILES EAST OF JUNCTION SR18. | Safety/Traffic Management | $60,000 | |
WASHINGTON | ARRA - YAKIMA RIVER TO WEST ELLENSBURG - PAVING SR90- 1.06 TO 8.25 MILES NW OF JUNCTION SR82. | Pavement Improvement | $2,428,622 | |
WASHINGTON | ARRA - SLIDE CURVE VICINITY TO CABIN CREEK EASTBOUND - PAVEMENT RESTORATION SR90-21.63 TO 26.31 MILES WEST OF JUNCTION SR970. | Pavement Improvement | $2,973,679 | |
WASHINGTON | ARRA - SNOQUALMIE SUMMIT TO HYAK - DOWEL BAR RETROFIT AND PCCP REHAB. WB. SR90-26.60 TO 29.81 MILES EAST OF JUNCTION SR18. | Pavement Improvement | $3,790,826 | |
WASHINGTON | LAKE EASTON VICINITY TO BULLFROG ROAD INTERCHANGE - REPLACE PCCP SR90-6.86 TO 16.36 MILES NORTHWEST OF JUNCTION SR970. | Pavement Improvement | $20,789,432 | |
WASHINGTON | ARRA - EASTON VICINITY TO BIG CREEK BRIDGE VICINITY EASTBOUND - REPLACE/REHAB PCCP SR90-10.86 TO 16.36 MILES NW OF JUNCTION SR970 | Other | $600,000 | |
WASHINGTON | ARRA - MEDICAL LAKE TO I-90 - RUMBLE STRIPS - CENTERLINE SR902-MILEPOST 0.16 TO MILEPOST 12.00. | Safety/Traffic Management | $41,229 | |
WASHINGTON | Highway is due for resurfacing by least life cycle cost method. Resurface the existing roadway pavement. This will prolong the life of the roadway at the least life cycle cost and provide for a smoot | Pavement Improvement | $4,575,382 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Kent, East Valley Highway Improvements FROM:SR 167 TO:S. 212th Street LEN: 0.850MI | Pavement Widening | $2,000,000 |
WASHINGTON | SPOKANE | ARRA - Spokane, Fish Lake Trail FROM:Fish Lk/S View Acres TO:Scribner/Sunset Hwy LEN: 7.000MI | Transportation Enhancements | $778,317 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Burien, 4th Ave SW Non-Motorized Project FROM:SW 153rd Street TO:SW 156th Street LEN: 0.220MI | Transportation Enhancements | $625,000 |
WASHINGTON | YAKIMA | Construct approximately 3,100 linear feet of 8-foot wide pedestrian pathway. | Transportation Enhancements | $158,643 |
WASHINGTON | WENATCHEE | ARRA - Wenatchee, Historic Pipeline/Pedestrian Bridge FROM:450' E of Bridge St TO:150' W of SR 28 LEN: 0.208MI | Transportation Enhancements | $1,506,749 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Seattle, South Spokane Street Viaduct FROM:Harbor Isl Offramp TO:I-5 I/C LEN: 0.750MI | Pavement Widening | $15,443,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Sammamish, East Lake Sammamish Pkwy - Ph. 1b FROM:NE 18th Place TO:2300 block LEN: 0.120MI | Pavement Improvement | $3,500,000 |
WASHINGTON | Historic railroad grade on North side of Lake Crescent will be restored and reconstructed as a multi-user regional trail. | Transportation Enhancements | $335,000 | |
WASHINGTON | ARRA - Jamestown Tribe, Jamestown Community Center to Blyn Rd Trl FROM:Tribal campus/Heron TO:Blyn Rd LEN: 0.682MI | Transportation Enhancements | $111,000 | |
WASHINGTON | ARRA - Garfield Co., Countywide Pavement Preservation FROM:Various TO:Various LEN: 0.000MI | Pavement Improvement | $230,915 | |
WASHINGTON | Preservation of roadways in Island County. Locations include: Island Co: Maxwelton Rd; Langley: 3rd St; Coupeville: Front St, N.Main St, Alexander St, S. Main St (Alternate to Front, N.Main, or Alexa | Pavement Improvement | $325,167 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - King Co., SW 98th Street Phase I Ped Corridor FROM:11th Ave SW TO:12th Ave SW LEN: 0.050MI | Transportation Enhancements | $1,270,557 |
WASHINGTON | ARRA - Kittitas Co., Yakima River Canyon Center - Ph. 1 FROM:SR 821 & Thrall Rd TO:SR 821 & Thrall Rd LEN: 0.000MI | Transportation Enhancements | $50,000 | |
WASHINGTON | ARRA - Kittitas Co., Guardrail Hazard Elimination FROM:various TO:various LEN: 0.000MI | Safety/Traffic Management | $530,000 | |
WASHINGTON | ARRA - Skamania Co., Cascade Drive Pedestrian Walkway FROM:Dam Access Rd TO:Greenleaf LEN: 0.253MI | Transportation Enhancements | $13,719 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Mountlake Terrace, 52nd Avenue Reconstruction FROM:212th St TO:220th St LEN: 0.500MI | Pavement Improvement | $1,000,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Lynnwood, I-5/196th St SW I/C Ped Impvmts FROM:196th/36th TO:196th/Poplar Way LEN: 0.300MI | Transportation Enhancements | $1,250,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Marysville ,67th Ave NE Overlay FROM:Grove Street TO:SR 528 LEN: 0.750MI | Pavement Improvement | $500,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Tulalip Tribe ,116th/34th Fish Passage Culvert FROM:MP 201.38 TO:MP 203.07 LEN: 0.114MI | Pavement Improvement | $2,000,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Snohomish Co., Harbour Pt Blvd - St Reconstruction FROM:St Andrews Dr. TO:Chennault Beach Rd LEN: 0.511MI | Pavement Improvement | $888,692 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Everett, Holly Drive Non-Motorized FROM:4th Ave. West TO:92nd Street SW LEN: 0.200MI | Transportation Enhancements | $447,886 |
WASHINGTON | ARRA - Stanwood, 68th Road Realign & School Safety FROM:279th St NW TO:280th St NW LEN: 0.200MI | Pavement Improvement | $750,000 | |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Puyallup, Shaw Road Extension Phase III FROM:1000' S of Pioneer TO:East Main St. LEN: 0.760MI | New Construction | $2,000,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - Port of Tacoma, Lincoln Ave. Grade Sep. (ARRA) FROM:Marc Street TO:Thorne Road LEN: 0.400MI | New Bridge Construction | $15,408,000 |
WASHINGTON | ARRA - Spokane Co., Rutter Parkway Bridge Rehab FROM: TO: LEN: 0.044MI | Bridge Improvement | $448,329 | |
WASHINGTON | RICHLAND-KENNEWICK | ARRA - Kennewick, Columbia Overlook - Phase 1 FROM:Volland St TO:Neel St. LEN: 0.000MI | Transportation Enhancements | $140,000 |
WASHINGTON | RICHLAND-KENNEWICK | ARRA - Richland, First Street Improvements FROM:Stevens Dr. TO:George Washington Wy LEN: 0.500MI | Pavement Widening | $1,600,000 |
WASHINGTON | ARRA - Sumas, Bob Mitchell Avenue FROM:W Front St TO:Cherry St LEN: 0.720MI | Pavement Improvement | $120,000 | |
WASHINGTON | SPOKANE | ARRA - Spokane Valley ,Sprague Ave. Resurfacing Project #1 FROM:University St. TO:Evergreen St. LEN: 2.000MI | Pavement Improvement | $2,606,469 |
WASHINGTON | SPOKANE | ARRA - Spokane, Five Mile Rd. - Ash to Lincoln FROM:Ash Rd. TO:Lincoln Rd. LEN: 1.300MI | Pavement Improvement | $112,720 |
WASHINGTON | SPOKANE | ARRA - Spokane Co., 5 Mile & Strong Rd Reconstruction FROM:Strong to Berridae TO:Rustle to Five Mile LEN: 1.950MI | Pavement Improvement | $859,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - NORTHEAST 8TH STREET TO SR520 - BRAIDED RAMPS (DESIGN / BUILD) SR405-3.11 TO 4.61 MILES SOUTH OF JUNCTION SR908. | Pavement Improvement | $30,000,000 |
WASHINGTON | SEATTLE-TACOMA, WA | ARRA - SR405 / NORTHEAST 195TH STREET TO SR527 - NORTHBOUND WIDENING - DESIGN / BUILD SR405-2.68 TO 5.68 MILES S. OF JCT. SR524. | Pavement Widening | $38,414,757 |
WASHINGTON | YAKIMA | Improve Nob Hill Boulevard from 64th Avenue to 72nd Avenue including curb & gutter, sidewalk, storm drainage system, illumination and intersection improvements (64th Avenue). | Pavement Improvement | $950,000 |
WASHINGTON | Overlay Existing Roadway from MP 0.94 to MP 1.93. Upgrade handicap ramps to current ADA standards. The work will involve overlaying approximately 4.5 lane miles with Hot Mix Asphalt and upgrades. | Pavement Improvement | $400,000 | |
WASHINGTON | YAKIMA | ARRA - Moxee, Beaudry Road Improvements FROM:Duffield Rd TO:1500 l.f. South LEN: 0.284MI | Pavement Improvement | $500,000 |
WASHINGTON | YAKIMA | ARRA - Selah, Speyers Road Improvements FROM:W Fremont St TO:N 13th St LEN: 0.680MI | Pavement Improvement | $1,598,000 |
WASHINGTON | OLYMPIA | ARRA - Tumwater, Capitol Blvd Sidewalk and Bike Lane FROM:S end Of E St. TO:N End of M St. LEN: 0.660MI | Transportation Enhancements | $360,000 |
WASHINGTON | OLYMPIA | ARRA - Tumwater, Capitol Blvd - Dennis to Israel FROM:Dennis St. TO:Isreal Rd. LEN: 0.250MI | Pavement Improvement | $234,000 |
WASHINGTON | OLYMPIA | ARRA - Olympia, Union Avenue Overlay FROM:Capitol Way TO:Plum Street LEN: 0.440MI | Pavement Improvement | $1,098,824 |
WASHINGTON | ARRA - Thurston Co., Steilacoom Rd. Ped. Enhancements FROM:Stonewood Dr. SE TO:Duterrow/Deerbrush LEN: 0.170MI | Transportation Enhancements | $110,244 | |
WASHINGTON | ARRA - Lewis Co., Jackson Highway (MP 1.22 to 2.81) FROM:Chehalis Valley Dr. TO:Hillcrest Rd. LEN: 1.590MI | Pavement Improvement | $775,898 | |
WASHINGTON | ARRA - Asotin Co., Scenic Way Overlay FROM:2nd Ave. TO:Fleshman Way LEN: 0.980MI | Pavement Improvement | $641,147 | |
WASHINGTON | ARRA - Moses Lake, Lakeshore & Peninsula Recnstruction FROM:Battery Road TO:Pommer St LEN: 1.000MI | Pavement Improvement | $1,200,000 | |
WASHINGTON | ARRA - Grant Co. ,Fairgrounds Path FROM:S/Side Fairgrnds TO:N/Side Fairgrnds LEN: 0.480MI | Transportation Enhancements | $56,894 | |
WASHINGTON | ARRA - Sunnyside, Yakima Valley Hwy/Lincoln Ave O'lay FROM:@ I/S TO:@ I/S LEN: 0.200MI | Pavement Improvement | $150,000 | |
WASHINGTON | YAKIMA | ARRA - Toppenish, S Toppenish/Washington Ave Imp FROM:Division St TO:W 1st St LEN: 0.210MI | Pavement Improvement | $320,000 |
WASHINGTON | BREMERTON | ARRA - Poulsbo, Viking Avenue - Phase II FROM:SR 305 TO:Finn Hill LEN: 0.660MI | Pavement Improvement | $2,729,358 |
WASHINGTON | BREMERTON | ARRA - Bainbridge Island, Core 40 Shldr Widen-Blakely-Ph. 2 FROM:Sta 28+00 TO:Sta 35+50 LEN: 0.133MI | Transportation Enhancements | $150,000 |
WASHINGTON | LONGVIEW (OR) | ARRA - Cowlitz Co., Coal Creek Road Improvements FROM:Pacific Way TO:MP 1.50 LEN: 1.230MI | Pavement Widening | $1,056,593 |
WASHINGTON | LONGVIEW (OR) | ARRA - Kelso, 13th Avenue Overlay FROM:Colorado St TO:Grade St LEN: 0.975MI | Pavement Improvement | $290,587 |
WASHINGTON | ARRA - Ellensburg, Canyon Road Overlay FROM:N I-90 ROW TO:Umptanum Rd LEN: 0.500MI | Pavement Improvement | $394,865 | |
WASHINGTON | ARRA - College Place, Whitman Drive Multi-Use Path FROM:Academy Way TO:Doans Ave. LEN: 0.270MI | Transportation Enhancements | $58,000 | |
WASHINGTON | ARRA - Walla Walla, 13th Avenue Improvements FROM: Rose/280' N of Abd TO:Cherry to Rees LEN: 0.714MI | Pavement Widening | $1,980,000 | |
WASHINGTON | MOUNT VERNON | ARRA - Mount Vernon, Anderson/Laventure- Fwlr to Blkbrn FROM:Fowler St. TO:Blackburn St. LEN: 0.250MI | New Construction | $971,970 |
WASHINGTON | ARRA - Sedro-Woolley ,Fruitdale & McGarigle Arterial Imp FROM:SR 20/Fruitdale Int TO:SR 9/McGarigle Int LEN: 1.340MI | Pavement Improvement | $134,867 | |
WASHINGTON | Resurfacing 1760 l.f. of collector arterial: Whitman St from Kamiaken to Maple, Maiden Lane from Whitman to Opal, and Opal from Maiden Lane to Campus. | Pavement Improvement | $358,819 | |
WASHINGTON | Reconstruct and widen existing road. | Pavement Improvement | $500,000 | |
WASHINGTON | ARRA - Cheney, Cheney Spangle Road Improvements FROM:100' S of SR 904 TO:City limits LEN: 0.400MI | Transportation Enhancements | $700,000 | |
WASHINGTON | ARRA - Island Co., Ault Field Road Widening FROM: Oak Harbor Rd. TO:Goldie Road LEN: 0.240MI | Pavement Improvement | $1,500,000 | |
WASHINGTON | ARRA - Ferndale ,2nd Avenue Extension FROM:Wash/2nd I/S TO:Portal Way/I-5 I/C LEN: 0.500MI | New Construction | $1,541,000 | |
WASHINGTON | ARRA - Grandview, Euclid Road Resurfacing FROM:Forsell Road TO:Stassen Way LEN: 0.767MI | Pavement Improvement | $318,327 | |
WASHINGTON | ARRA - Lynden, Grover Street FROM:Lawrence St. TO:BNSF RR LEN: 0.600MI | Pavement Improvement | $981,169 | |
WASHINGTON | Grinding and overlay of existing street. Project will include striping, installing handicap ramps & utility adjustments as needed. | Pavement Improvement | $393,000 | |
WASHINGTON | ARRA - Eatonville, SR 161 Rural Town Center & Corridor FROM:Lynch St TO:Mashell R. Br Vic. LEN: 1.000MI | Pavement Widening | $588,101 | |
WASHINGTON | ARRA - Stevens Co. ,Countywide Pavement Preservation FROM:SR 25 TO:SR 395 LEN: 33.370MI | Pavement Improvement | $980,276 | |
WASHINGTON | BELLINGHAM | ARRA - Bellingham, 2009 Pedestrian Crossing Safety FROM:various TO:various LEN: 0.000MI | Transportation Enhancements | $349,948 |
WASHINGTON | YAKIMA | Grind and overlay Rudkin Road and Main Street/ Ahtanum Road Intersection including new traffic signal trip wires (traffic loops). | Pavement Improvement | $322,000 |
WASHINGTON | ARRA - PACIFIC COUNTY 2009 - PAVING SR101-ASTORIA BRIDGE TO JUNCTION SR4. AND SR103-ENTIRE ROUTE. | Pavement Improvement | $394,691 | |
WASHINGTON | ARRA - MOSES LAKE TO EPHRATA - PASSING LANE AND SAFETY SR17-VICINITY JUNCTION SR282 TO 18.60 MILES SOUTH. SR282-ENTIRE ROUTE. | Pavement Improvement | $6,088,296 | |
WASHINGTON | ARRA - NORTH CENTRAL REGION 2009 CHIP SEAL - STAGE 2 SR155-MP62.80 TO MP78.82, SR243-MP0.00 TO MP28.26, SR262-MP0.00 TO MP22.24 | Pavement Improvement | $3,574,243 | |
WASHINGTON | ARRA - UPGRADE SR20 HAR AND INSTALL NEW RADIO AT SR395 / SR26. SR20-VICINITY 7.35 MILES EAST OF JUNCTION SR21. | Safety/Traffic Management | $244,788 | |
WASHINGTON | ARRA - STATEWIDE CENTERLINE RUMBLE STRIP - STATEWIDE - | Other | $200,000 | |
WASHINGTON | ARRA - STATEWIDE CABLE MEDIAN BARRIER - STATEWIDE - | Other | $675,000 | |
WASHINGTON | ARRA - EASTERN WASHINGTON - CENTERLINE RUMBLE STRIPS - EASTERN WASHINGTON - | Safety/Traffic Management | $812,608 | |
WASHINGTON | This section of SR 7 has a high frequency of crossover collisions. By installing centerline rumble stirips and replacing pavement markings, this project will reduce this type of collision and improve | Safety/Traffic Management | $913,689 | |
WASHINGTON | ARRA - NORTHWEST REGION - CENTERLINE RUMBLE STRIPS SELECTED AREAS ON SR'S 9, 20, 92, 164, 530, 539, 542 AND 546. | Safety/Traffic Management | $757,389 | |
WASHINGTON | ARRA - WESTERN WASHINGTON - MEDIAN CABLE BARRIER SELECTED AREAS ON SR'S: I-5, SR18 AND I-90. | Safety/Traffic Management | $1,164,810 | |
WASHINGTON | ARRA-THORP VIC (MP100.25to100.5) & MOSES LK(MP164.15to170.39&MP173.7to174.52)-MEDIAN CABLE BARRIER I-90. | Safety/Traffic Management | $1,369,902 | |
WASHINGTON | ARRA - Benton Co., Webber Canyon Road - Phase 2 FROM:Kiona TO:SR 224/I-82 LEN: 0.300MI | Pavement Improvement | $1,200,000 | |
WASHINGTON | ARRA - Prosser, Sheridan Avenue Improvements FROM:Third St TO:Sixth St LEN: 0.275MI | Pavement Improvement | $500,000 | |
WASHINGTON | ARRA - Chelan Co., North Road Improvements FROM:Chumstick Hwy TO:Fox Road LEN: 0.560MI | Pavement Improvement | $1,021,318 | |
WASHINGTON | ARRA - Forks, Bogachiel Way Improvements FROM:US 101 TO:6th Avenue LEN: 0.510MI | Pavement Improvement | $160,000 | |
WASHINGTON | ARRA - Kalama, First Street - Phase 2 FROM:Geranium St TO:Kingwood St LEN: 0.300MI | Transportation Enhancements | $416,250 | |
WASHINGTON | ARRA - Lincoln Co., Kiner Road No. 9115 - Phase 1 FROM:900' S of Tolonn I/S TO:Monson Rd I/S LEN: 4.240MI | Pavement Improvement | $654,000 | |
WASHINGTON | ARRA - Skamania Co., Wind River Road FROM:MP 0.01 TO:MP 0.93 LEN: 0.920MI | Pavement Improvement | $306,711 | |
WASHINGTON | ARRA - Thurston Co. ,Old Hwy 99 Turn Ln. & Prairie Cr Br FROM:203rd TO:600' N of Sargent LEN: 0.400MI | Bridge Replacement | $1,330,000 | |
WASHINGTON | ARRA - Whitman Co., Wawawai Road Overlay FROM:MP 13.96 TO:MP 19.40 LEN: 5.440MI | Pavement Improvement | $896,000 | |
WASHINGTON | ARRA - Harrah ,Harrah Road Overlay FROM:Mauch St TO:Canal Rd LEN: 0.625MI | Pavement Improvement | $360,000 | |
WASHINGTON | ARRA - Adams Co., Lee Road Overlay - Phase 1 FROM:Reynolds Rd TO:Lemaster Road LEN: 3.030MI | Pavement Improvement | $832,923 | |
WASHINGTON | ARRA - Dayton, Dayton Avenue Overlay FROM:Front St TO:US 12 LEN: 0.250MI | Pavement Improvement | $225,000 | |
WASHINGTON | ARRA - Franklin Co., R-170 Land Slide Area FROM:Sagehill I/S TO:Klamath Road I/S LEN: 2.810MI | Pavement Improvement | $750,000 | |
WASHINGTON | ARRA - Pacific Co., Sandridge Road - MP 0.99 to 2.61 FROM:MP 0.99 TO:MP 2.61 LEN: 1.620MI | Pavement Improvement | $588,412 | |
WASHINGTON | ARRA - Wapato ,Camas Avenue Grind and Overlay FROM:3rd St. TO:9th St. LEN: 0.400MI | Pavement Improvement | $312,000 | |
WASHINGTON | ARRA - PAVE WEST LITTLE ISLAND ROAD MILEPOST 0.00 TO MILEPOST 1.80. | Pavement Improvement | $200,000 | |
WASHINGTON | ARRA - Pend Oreille Co. ,Deer Valley Rd. (MP 8.42 to 9.55) FROM:MP 8.42 TO:MP 9.55 LEN: 1.170MI | Pavement Improvement | $471,000 | |
WASHINGTON | ARRA - San Juan Co., Fisherman Bay Road MP 0.43 - 2.19 FROM:Hummel Lake Rd. TO:Military Rd. LEN: 1.760MI | Pavement Improvement | $416,620 | |
WASHINGTON | ARRA - La Conner, 2009 Maple Avenue Resurfacing FROM:Caledonia St TO:Morris St. LEN: 0.502MI | Pavement Improvement | $267,000 | |
WASHINGTON | ARRA - Conconully, Main St/Lake St Resurfacing FROM:SCL TO:ECL LEN: 0.540MI | Pavement Improvement | $126,198 | |
WASHINGTON | ARRA - Colfax, Fairview Street Overlay FROM:Main & Wawawai TO:Fairview & Meadow LEN: 0.284MI | Pavement Improvement | $192,000 | |
WASHINGTON | Place 0.15 ft of HMA overlay on McEwan Prairie Road. Recessed pavement markers, shoulder dressing, striping and miscellaneous traffic markings will be included in the project. | Pavement Improvement | $350,000 | |
WASHINGTON | ARRA - Rainier, Minnesota St N. of SR 507 Overlay FROM:2nd St SE TO:RR Trestle LEN: 0.300MI | Pavement Improvement | $742,800 | |
WASHINGTON | Resurfacing of 9 miles of Bridge Creek Rd. - MP 10.29 to MP 17.40. Work will consist of preleveling deficient areas of roadway surface with cold mix asphalt and a Bituminous Surface Treatment. | Pavement Improvement | $370,000 | |
WASHINGTON | ARRA - Klickitat Co., South Columbus Overlay FROM:Godendale City Limit TO:Hocter Road LEN: 2.390MI | Pavement Improvement | $521,656 | |
WASHINGTON | ARRA - Klickitat Co., Bickleton Hwy Overlay 2 FROM:Fenton Lane TO:MP 8.22 LEN: 1.580MI | Pavement Improvement | $255,000 | |
WASHINGTON | ARRA - Grant Co., Bridge #244 FROM:RR Tracks TO: Road O-NE LEN: 0.120MI | Bridge Replacement | $750,000 | |
WASHINGTON | ARRA - Grant Co., L-NE Road Overlay FROM:3-NE TO:Kittleson Rd LEN: 2.010MI | Pavement Improvement | $487,009 | |
WASHINGTON | ARRA - Blaine, Boblett Street Connector FROM:SR 543 TO:Odell Rd. LEN: 0.133MI | New Construction | $348,000 | |
WASHINGTON | ARRA - Jefferson Co., Center Road Overlay Phase 4 FROM:MP 2.3 TO:MP 4.3 LEN: 2.000MI | Pavement Improvement | $358,000 | |
WASHINGTON | ARRA - Whatcom Co., Scott Ditch Bridge #245 FROM:MP 10.04 TO:MP 10.09 LEN: 0.050MI | Bridge Replacement | $600,000 | |
WASHINGTON | ARRA - Cowlitz Co., Westside Hwy Road Improvement FROM:I/S PH10 & Westside TO:.54 Miles North LEN: 0.540MI | Pavement Improvement | $225,000 | |
WASHINGTON | ARRA - Cowlitz Co., Hall Rd Reconstruction Project FROM:SR 504 TO:Streeter Rd LEN: 0.730MI | Pavement Widening | $330,000 | |
WASHINGTON | ARRA - Lewis Co., Davis Lake Road (MP .33 to 2.620) FROM:Morton City limits TO:Priest Rd I/S LEN: 2.290MI | Pavement Improvement | $1,027,000 | |
WASHINGTON | ARRA - Deer Park, Crawford Ave Phase V FROM:Forest St TO:Airport Rd LEN: 0.610MI | Pavement Improvement | $1,674,431 | |
WASHINGTON | Currently numerous roads are closed or have load restrictions during inclement weather. This project will supplement our yearly paving and road weatherization efforts. | Safety/Traffic Management | $150,000 | |
WASHINGTON | ARRA - Naches, 2nd St and 3rd St Resurfacing FROM:1-Naches 2-Penny TO:1-Sinclair 2-Tieton LEN: 0.227MI | Pavement Improvement | $326,000 | |
WEST VIRGINIA | Resurfacing | Pavement Improvement | $906,900 |