Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
MARYLAND | Safety & Resurfacing | Pavement Improvement | $1,669,548 | |
MARYLAND | Safety & Resurfacing | Pavement Improvement | $2,133,956 | |
MARYLAND | Geometric Improvements | Pavement Improvement | $835,824 | |
MARYLAND | MD 26 @ KLEE MILL RD / MD 850 - WIDEN & RESURFACE | Pavement Improvement | $2,432,740 | |
MARYLAND | Geometric Improvements | Pavement Improvement | $1,284,501 | |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $2,107,066 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $2,011,527 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $953,783 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $3,849,356 |
MARYLAND | Safety & Resurfacing | Pavement Improvement | $986,514 | |
MARYLAND | Safety & Resurfacing | Pavement Improvement | $841,137 | |
MARYLAND | 4 Line Divided Highway Construct | Pavement Widening | $7,351,494 | |
MARYLAND | BALTIMORE,MD | Resurfacing | Pavement Improvement | $928,143 |
MARYLAND | BALTIMORE,MD | Resurfacing | Pavement Improvement | $2,528,090 |
MARYLAND | BALTIMORE,MD | Resurfacing | Pavement Improvement | $1,340,347 |
MARYLAND | BALTIMORE,MD | Bridge Rehabilitation | Bridge Improvement | $7,269,104 |
MARYLAND | BALTIMORE,MD | Rehabitation | Pavement Improvement | $7,572,091 |
MARYLAND | Safety and Resurfacing | Pavement Improvement | $1,690,416 | |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $11,529,372 |
MARYLAND | WASHINGTON (DC-MD-VA) | Intersection Reconstruction | Pavement Improvement | $1,678,058 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $3,023,705 |
MARYLAND | WASHINGTON (DC-MD-VA) | MD 28: @ MD 586 ( INTERSECTION MODIFICATIONS ) | Pavement Improvement | $1,471,290 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety and Resurfacing | Pavement Improvement | $4,488,347 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety and Resurfacing | Pavement Improvement | $2,630,027 |
MARYLAND | WASHINGTON (DC-MD-VA) | Safety & Resurfacing | Pavement Improvement | $2,632,686 |
MARYLAND | WASHINGTON (DC-MD-VA) | MD 212 @ ALLVIEW DRIVE / EVANS TRAIL - WIDEN & RESURFACE | Pavement Improvement | $1,744,696 |
MASSACHUSETTS | The project will begin at the Adams/Cheshire town boundary (MM 66.3) and will end just north of Commonwealth Avenue (MM 67.8) for a project length of approximately 1.5 miles. MassHighway will resurfac | Pavement Improvement | $2,199,456 | |
MASSACHUSETTS | TAUNTON | This project consists of the maintenance resurfacing and drainage improvements on a portion of State-Owned Route 18/28 in the Towns of Bridgewater and Middleborough. The project extends form Bridgewat | Pavement Improvement | $2,923,530 |
MASSACHUSETTS | FALL RIVER (RI) | Project ERP-001S(899) Fall River / Freetown Rte 24 Interchange Access Improvements, Executive Park Dr, South Main St, DESIGN/BUILD | Pavement Improvement | $70,172,997 |
MASSACHUSETTS | HYANNIS | The purpose of this project is to resurface the Bourne Route 6 Scenic Highway from the intersection with Nightingale Pond Road to just east of the intersection with Bourndale Road. | Pavement Improvement | $1,805,110 |
MASSACHUSETTS | NEW BEDFORD | The proposed project consists of resurfacing and related work on Route 6 in the Town of Westport. Beginning west of the DartmouthlWestport Town Line at Sta. 1+30± (Westbound Milemarker 20.9±) & Sta. 1 | Pavement Improvement | $5,857,100 |
MASSACHUSETTS | This resurfacing project consists of 2" milling and resurfacing on a section Rte 122 and a section of Rte 62 in Barre. Section 1 is state-owned and begins just west of the intersection of Rte 122 and | Pavement Improvement | $2,795,740 | |
MASSACHUSETTS | The purpose of this project is to perform resurfacing and related work on the state owned sections of Route 6A in Barnstable. Also included in the project is the resurfacing of existing sidewalks wit | Pavement Improvement | $3,701,540 | |
MASSACHUSETTS | This is a State Highway resurfacing project including new pavement, guardrail, painting and signage. | Pavement Improvement | $1,796,330 | |
MASSACHUSETTS | BOSTON-LAWRENCE-HAVERHILL(MA-NH-RI) | This is a State Highway resurfacing project including new pavement, guardrail, painting and signage. | Pavement Improvement | $4,959,250 |
MASSACHUSETTS | PROVIDENCE-PAWTUCKET-WARWICK (RI) | Work on this project consists of milling and resurfacing of Route 6 in Swansea from the Somerset Town Line to the Rehoboth Town Line. Repair of frost heaves and the reconstruction of existing sidewal | Pavement Improvement | $4,440,310 |
MASSACHUSETTS | The work for this project shall consist of milling and resurfacing Route 6A in Dennis from the Yarmouth Town Line to the Brewster Town Line, a distance of approximately 4.3 miles. | Pavement Improvement | $1,703,730 | |
MASSACHUSETTS | This is a Pavement Preservation Project for Route 24 in Avon and Stoughton. | Pavement Improvement | $5,071,620 | |
MASSACHUSETTS | BOSTON-LAWRENCE-HAVERHILL(MA-NH-RI) | PROJECT ERP-001S(931), Burlington-Lexington-Reading-Woburn, Rte I-95 Traffic Sign Replacement. | Safety/Traffic Management | $3,774,620 |
MASSACHUSETTS | Project consists of 2" milling and resurfacing on a section of Route 32 (Main Street). The section begins at the WareÐNew Braintree TL MM 22.383 and proceeds northerly past the New Braintree-Hardwick | Pavement Improvement | $622,600 | |
MASSACHUSETTS | FITCHBURG-LEOMINSTER | ERP-001S(933)X, Gill-Erving-Orange-Wendell: Route 2 Resurfacing and Related Work | Pavement Improvement | $3,988,870 |
MASSACHUSETTS | ERP-001S(934)X, Easthampton-Greenfield-Northampton-Southampton-Westfield: Resurfacing & related work on Routes 5 and 10. | Pavement Improvement | $4,243,640 | |
MASSACHUSETTS | This project will commence at Route 140 in Shrewsbury and continue in a westerly direction to Massasoit Road in Worcester, a distance of approximately 3.5 miles. | Pavement Improvement | $3,453,780 | |
MASSACHUSETTS | The focus of the Northfield Street Improvement Project is to reconstruct sidewalks on Main Street and Parker Avenue in Northfield from a point north of the intersection with River Street continuing no | Pavement Improvement | $1,685,890 | |
MASSACHUSETTS | PITTSFIELD | Reconstruction of State Highway from the Route 7 intersection north for approximately 1.25 miles to the end of the State Highway just south of the intersection with Route 183. Included in the work is | Pavement Improvement | $4,490,240 |
MASSACHUSETTS | Milling and resurfacing of Milestone Road beginning at the limit of State Highway just west of rotary that intersects Orange St., Sparks Ave., and Old South Rd., proceeding easterly and ending at the | Pavement Improvement | $5,601,520 | |
MASSACHUSETTS | PROJECT ERP-001S(942)X, Belchertown-Ware, Rte 9 Resurfacing & related work | Pavement Improvement | $4,833,910 | |
MASSACHUSETTS | PROJECT ERP-001S(945)X Cheshire, resurfacing & related work Rte 8 | Pavement Improvement | $1,265,387 | |
MASSACHUSETTS | The proposed project consists of roadway modifications and the reconstruction of Route 27, Pleasant Street, West Street and Westgate Mall Road. Vehicular operations are anticipated to be improved as | Pavement Improvement | $4,867,672 | |
MASSACHUSETTS | PROJECT ERP-001S(947)X, New Ashford - Lanesborough, Rte 7 Resurfacing & related work | Pavement Improvement | $2,406,702 | |
MASSACHUSETTS | BOSTON-LAWRENCE-HAVERHILL(MA-NH-RI) | The Project limits are Route 2 in Harvard from the vicinity of the Littleton Road Bridge over Route 2 easterly about 1 mile to the Littleton Town Line, then continuing another 3.4 miles to the Boxboro | Pavement Improvement | $5,646,160 |
MASSACHUSETTS | The project involves roadway and sidewalk rehabilitation on town-owned Elm Street in the Town of Hatfield, and includes coldplaning, roadway reclamation, hot mix asphalt paving, replacement of sidewal | Pavement Improvement | $1,114,560 | |
MASSACHUSETTS | BOSTON-LAWRENCE-HAVERHILL(MA-NH-RI) | The proposed expansion of the Newburyport Park & Ride facility will add 105 parking spaces. Work will include the construction of a soil nail retaining wall, upgrades to the existing lighting, as well | Safety/Traffic Management | $3,587,090 |
MASSACHUSETTS | This project consists of demolishing and replacing the Red Bridge Road Bridge over the Utilities Canal in Wilbraham. The new bridge will be a superstructure replacement constructed on an improved alig | Bridge Improvement | $2,499,054 | |
MASSACHUSETTS | FITCHBURG-LEOMINSTER | The proposed project consists of resurfacing and related work on Route 6 in the Town of Westport. Beginning west of the DartmouthlWestport Town Line at Sta. 1+30± (Westbound Milemarker 20.9±) & Sta. 1 | Pavement Improvement | $7,898,960 |
MASSACHUSETTS | SPRINGFIELD-CHICOPEE-HOLYOKE (CT) | This multi-use recreational rail trail project starts at Ferry Street in Easthampton and ends at Earle Street in Northampton, for a total length of 4,400 Meters. It links the Manhan Bike Trail in Eas | Transportation Enhancements | $4,707,800 |
MASSACHUSETTS | ERP-001S(964)X, Westford: Intersection and signal improvements at Route 110 (Littleton) and Route 225 ( Concord Road). | Pavement Improvement | $4,123,590 | |
MICHIGAN | SOUTH LYON-HOWELL-BRIGHTON | Design & construction of ITS | Safety/Traffic Management | $632,422 |
MICHIGAN | resurface | Pavement Improvement | $200,000 | |
MICHIGAN | Crack Relief Layer and Resurf | Pavement Improvement | $3,402,383 | |
MICHIGAN | HMA Crush and Shape | Pavement Improvement | $1,566,004 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $93,591 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $93,591 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $33,120 | |
MICHIGAN | Major Rehabilitation | Pavement Improvement | $20,616,393 | |
MICHIGAN | HOLLAND | Install new cable barrier rail | Safety/Traffic Management | $667,076 |
MICHIGAN | Renovate Rest Area | Other | $2,230,143 | |
MICHIGAN | Deep Overlay | Bridge Replacement | $395,635 | |
MICHIGAN | Resurface | Pavement Improvement | $120,000 | |
MICHIGAN | Crush & Shape, Resurface | Pavement Improvement | $772,026 | |
MICHIGAN | Chip Seal | Pavement Improvement | $526,311 | |
MICHIGAN | Pave existing Carpool Lots | Other | $74,596 | |
MICHIGAN | Scour countermeasures | Pavement Improvement | $65,189 | |
MICHIGAN | HMA Resurfacing | Pavement Improvement | $249,791 | |
MICHIGAN | HMA Resurfacing | Pavement Improvement | $1,827,957 | |
MICHIGAN | BAY CITY | Trenching & HMA shldr paving | Pavement Improvement | $4,284,067 |
MICHIGAN | BAY CITY | Safety Improvement | Pavement Improvement | $480,000 |
MICHIGAN | BENTON HARBOR | Reconstruction | Pavement Improvement | $309,925 |
MICHIGAN | BENTON HARBOR | Install median barrier | Safety/Traffic Management | $3,684,997 |
MICHIGAN | BENTON HARBOR | Chip and seal | Pavement Improvement | $89,104 |
MICHIGAN | SOUTH BEND-MISHAWAKA, IN-MI | Chip and seal | Pavement Improvement | $69,565 |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $91,801 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $90,283 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $77,658 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $85,200 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $55,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $80,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $85,500 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $57,378 | |
MICHIGAN | BATTLE CREEK | Resurface | Pavement Improvement | $231,918 |
MICHIGAN | BATTLE CREEK | Resurface | Pavement Improvement | $289,898 |
MICHIGAN | BATTLE CREEK | Resurface | Pavement Improvement | $440,648 |
MICHIGAN | Sidewalk | Pavement Improvement | $241,521 | |
MICHIGAN | Resurface | Pavement Improvement | $550,473 | |
MICHIGAN | BATTLE CREEK | Resurface | Pavement Improvement | $454,396 |
MICHIGAN | BATTLE CREEK | Resurface | Pavement Improvement | $242,065 |
MICHIGAN | Resurface | Pavement Improvement | $145,000 | |
MICHIGAN | BATTLE CREEK | Resurface | Pavement Improvement | $330,773 |
MICHIGAN | SOUTH BEND-MISHAWAKA, IN-MI | Chip and seal | Pavement Improvement | $45,000 |
MICHIGAN | SOUTH BEND-MISHAWAKA, IN-MI | Chip and seal | Pavement Improvement | $12,150 |
MICHIGAN | Resurface | Pavement Improvement | $50,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $90,555 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $74,416 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $78,150 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $32,550 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $83,025 | |
MICHIGAN | Resurface | Pavement Improvement | $20,000 | |
MICHIGAN | Mill and HMA Overlay | Pavement Improvement | $739,969 | |
MICHIGAN | Pere Marquette HMA Paving | Pavement Improvement | $795,008 | |
MICHIGAN | LANSING | Concrete pavement restoration | Pavement Improvement | $1,995,030 |
MICHIGAN | mill and fill existing surface | Pavement Improvement | $183,166 | |
MICHIGAN | LANSING | Resurface and sidewalk repair | Pavement Improvement | $264,000 |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $376,613 |
MICHIGAN | Sealcoat existing surface | Pavement Improvement | $86,880 | |
MICHIGAN | Mill and fill existing surface | Pavement Improvement | $148,645 | |
MICHIGAN | Reconstruct | Pavement Improvement | $49,866,926 | |
MICHIGAN | Resurface | Pavement Improvement | $275,443 | |
MICHIGAN | Paver Placed Surface Seal | Pavement Improvement | $353,401 | |
MICHIGAN | I-75 3000 feet south of NYC RR to 3000 feet north of M-93 Crush and shape with HMA resurfacing | Pavement Improvement | $4,672,879 | |
MICHIGAN | Reconstruct existing | Pavement Improvement | $1,443,886 | |
MICHIGAN | Center left turn lane | Pavement Improvement | $349,479 | |
MICHIGAN | Resurface | Pavement Improvement | $265,000 | |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $619,427 |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $252,388 |
MICHIGAN | LANSING | Reconstuction | Pavement Improvement | $239,876 |
MICHIGAN | COLD MILL & RESURFACE | Pavement Improvement | $2,095,377 | |
MICHIGAN | Streetscape Enhancement | Pavement Improvement | $724,434 | |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $143,922 |
MICHIGAN | Resurface | Pavement Improvement | $155,000 | |
MICHIGAN | Resurface | Pavement Improvement | $354,458 | |
MICHIGAN | Epoxy overlay and painting | Bridge Improvement | $157,518 | |
MICHIGAN | Mill & HMA Overlay with Joints | Pavement Improvement | $5,323,046 | |
MICHIGAN | Resurface existing Lots | Pavement Improvement | $101,873 | |
MICHIGAN | FLINT | Reconst, Pavt Reprs & Bridges | Other | $787,000 |
MICHIGAN | FLINT | Pavement repair | Pavement Improvement | $1,536,295 |
MICHIGAN | FLINT | Pavement repair | Pavement Improvement | $1,385,335 |
MICHIGAN | Rubblization and resurfacing | Pavement Improvement | $624,753 | |
MICHIGAN | FLINT | Preventative Maintenance | Pavement Improvement | $300,000 |
MICHIGAN | Resurface | Other | $387,200 | |
MICHIGAN | HMA cold mill and resurface | Pavement Improvement | $2,301,024 | |
MICHIGAN | Reconstruct | Other | $210,000 | |
MICHIGAN | Pavement Markings | Safety/Traffic Management | $277,500 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $75,478 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $47,283 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $94,491 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $92,897 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $84,359 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $93,945 | |
MICHIGAN | HMA Overlay with Joint Repairs | Pavement Improvement | $360,562 | |
MICHIGAN | HMA Overlay | Pavement Improvement | $360,386 | |
MICHIGAN | Construct bicycle lanes | Pavement Improvement | $183,626 | |
MICHIGAN | HMA Overlay | Pavement Improvement | $471,311 | |
MICHIGAN | Resurface | Pavement Improvement | $90,000 | |
MICHIGAN | Resurface | Pavement Improvement | $115,000 | |
MICHIGAN | Resurface | Pavement Improvement | $90,000 | |
MICHIGAN | Non-Motorized Shoulders | Pavement Improvement | $144,689 | |
MICHIGAN | Non-Motorized Shoulders | Pavement Improvement | $312,800 | |
MICHIGAN | Resurface | Pavement Improvement | $432,603 | |
MICHIGAN | Non-Motorized Shoulders | Pavement Improvement | $334,306 | |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $86,778 |
MICHIGAN | Chip and seal | Pavement Improvement | $94,500 | |
MICHIGAN | Chip and seal | Pavement Improvement | $94,500 | |
MICHIGAN | LANSING | Restore and Rehabilitate | Pavement Improvement | $452,978 |
MICHIGAN | LANSING | Reconstruct | Pavement Improvement | $803,286 |
MICHIGAN | Chip seal | Pavement Improvement | $61,220 | |
MICHIGAN | LANSING | Restore and rehabilitate | Pavement Improvement | $498,062 |
MICHIGAN | LANSING | Cold Mill & HMA Resuf | Pavement Improvement | $3,761,780 |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $770,470 |
MICHIGAN | LANSING | Resurface | Pavement Improvement | $538,495 |
MICHIGAN | Coldmill/Joints/Resurface | Pavement Improvement | $1,016,539 | |
MICHIGAN | Cold mill and resurface | Pavement Improvement | $265,000 | |
MICHIGAN | ASCRL and HMA Overlay | Pavement Improvement | $9,955,449 | |
MICHIGAN | Reconstruct | Pavement Improvement | $706,824 | |
MICHIGAN | JACKSON | Resurface | Pavement Improvement | $318,413 |
MICHIGAN | JACKSON | Resurface | Pavement Improvement | $378,047 |
MICHIGAN | JACKSON | Reconstruction | Pavement Improvement | $657,922 |
MICHIGAN | KALAMAZOO | Const SPUI, widen, soundwall | Pavement Widening | $47,717,637 |
MICHIGAN | KALAMAZOO | Reconstruction | Pavement Improvement | $900,000 |
MICHIGAN | KALAMAZOO | Reconstruction | Pavement Improvement | $665,676 |
MICHIGAN | KALAMAZOO | RCNST | Pavement Improvement | $1,045,676 |
MICHIGAN | KALAMAZOO | Reconstruction | Pavement Improvement | $515,457 |
MICHIGAN | Reconstruction | Pavement Improvement | $517,985 | |
MICHIGAN | KALAMAZOO | Resurface | Pavement Improvement | $531,000 |
MICHIGAN | KALAMAZOO | Restoration and Rehabilitation | Pavement Improvement | $216,540 |
MICHIGAN | KALAMAZOO | Mill and resurface | Pavement Improvement | $199,402 |
MICHIGAN | KALAMAZOO | Resurface | Pavement Improvement | $270,000 |
MICHIGAN | KALAMAZOO | Resurface | Pavement Improvement | $330,193 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $524,026 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $1,005,938 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $122,184 |
MICHIGAN | GRAND RAPIDS | Repair/resurface | Pavement Improvement | $275,118 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $761,000 |
MICHIGAN | GRAND RAPIDS | Deep Overlay, Pin and Hangers | Bridge Improvement | $1,740,844 |
MICHIGAN | GRAND RAPIDS | Reconstruct | Pavement Improvement | $1,460,000 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $70,136 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $76,696 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $79,502 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $79,502 |
MICHIGAN | GRAND RAPIDS | Reconstruct | Pavement Improvement | $332,036 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $1,100,000 |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $670,308 |
MICHIGAN | GRAND RAPIDS | Reconstruct | Pavement Improvement | $300,000 |
MICHIGAN | GRAND RAPIDS | Deep ovly, P/H, substr rep, pt | Bridge Improvement | $520,718 |
MICHIGAN | Deploy misc ITS technologies | Safety/Traffic Management | $780,037 | |
MICHIGAN | GRAND RAPIDS | Integrate ITS Devices | Safety/Traffic Management | $280,000 |
MICHIGAN | Jt Rprs, Substr Repr, bm rprs | Bridge Improvement | $582,404 | |
MICHIGAN | GRAND RAPIDS | Madison Avenue and Hall Street Hall St from Jefferson Ave Ornamental street lighting, street trees, benches,bulb outs, ENH 07109 | Pavement Improvement | $929,170 |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $91,940 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $93,367 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $89,005 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $73,501 | |
MICHIGAN | HMA paving of gravel lot | Pavement Improvement | $51,794 | |
MICHIGAN | Resurface existing Lot | Pavement Improvement | $21,075 | |
MICHIGAN | Reconstruct | Other | $240,000 | |
MICHIGAN | Chip Seal | Pavement Improvement | $874,819 | |
MICHIGAN | East bound passing relief lane | Pavement Widening | $1,735,083 | |
MICHIGAN | Milling and single course HMA | Pavement Improvement | $3,334,687 | |
MICHIGAN | New Carpool Lot | Pavement Improvement | $191,801 | |
MICHIGAN | Resurface | Other | $23,000 | |
MICHIGAN | SOUTH LYON-HOWELL-BRIGHTON | Resurface road | Pavement Improvement | $1,577,000 |
MICHIGAN | HMA MILL&FILL | Pavement Improvement | $2,864,179 | |
MICHIGAN | Resurface | Pavement Improvement | $400,284 | |
MICHIGAN | DETROIT,MI | Resurface road | Pavement Improvement | $628,581 |
MICHIGAN | mill and HMA resurfacing | Pavement Improvement | $497,713 | |
MICHIGAN | DETROIT,MI | Resurface road | Pavement Improvement | $450,000 |
MICHIGAN | DETROIT,MI | Resurface | Pavement Improvement | $565,287 |
MICHIGAN | Bituminous Resurfacing | Pavement Improvement | $1,848,504 | |
MICHIGAN | Resurface Rural Roads | Pavement Improvement | $322,092 | |
MICHIGAN | DETROIT,MI | Reconstruct | Pavement Improvement | $2,800,000 |
MICHIGAN | DETROIT,MI | Bituminous overlay. | Pavement Improvement | $4,605,766 |
MICHIGAN | Hot In-Place With Ultra-Thin | Pavement Improvement | $362,028 | |
MICHIGAN | Resurface | Pavement Improvement | $80,000 | |
MICHIGAN | Concrete Joint Repair | Pavement Improvement | $507,651 | |
MICHIGAN | Mill and HMA Overlay | Pavement Improvement | $552,119 | |
MICHIGAN | Reconstruction and Overlay | Pavement Improvement | $2,475,018 | |
MICHIGAN | Resurface | Pavement Improvement | $743,345 | |
MICHIGAN | Reconstruct | Pavement Improvement | $465,000 | |
MICHIGAN | Cold Mill and Resurface | Pavement Improvement | $463,039 | |
MICHIGAN | HMA Overlay | Pavement Improvement | $495,508 | |
MICHIGAN | Cold Mill & HMA Resurface | Pavement Improvement | $869,577 | |
MICHIGAN | deck ptch, jts,P/H, substr rpr | Bridge Improvement | $809,063 | |
MICHIGAN | Resurface | Pavement Improvement | $95,900 | |
MICHIGAN | Painting and Guardrails | Pavement Improvement | $122,015 | |
MICHIGAN | Penetrating Healer Sealer | Bridge Improvement | $476,980 | |
MICHIGAN | MONROE | Resurface | Pavement Improvement | $179,884 |
MICHIGAN | MONROE | Resurface | Pavement Improvement | $204,090 |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $403,967 | |
MICHIGAN | Resurface | Pavement Improvement | $150,000 | |
MICHIGAN | HMA Overlay | Pavement Improvement | $914,809 | |
MICHIGAN | Coldmill & Resurface/Chipseal | Pavement Improvement | $809,317 |