Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
MICHIGAN | Resurface | Pavement Improvement | $669,549 | |
MICHIGAN | Deep Overlay | Bridge Improvement | $1,361,154 | |
MICHIGAN | Road Rehab; Add Roundabout | Pavement Improvement | $3,278,891 | |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Reconstruction | Pavement Improvement | $800,000 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Reconstruct | Pavement Improvement | $200,000 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Resurface-Mill and overlay | Pavement Improvement | $35,023 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Mill and resurface | Pavement Improvement | $50,000 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Reconstruction | Pavement Improvement | $190,000 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Resurface | Pavement Improvement | $503,211 |
MICHIGAN | DETROIT,MI | Resurface, Rehab, or Restore | Pavement Improvement | $802,000 |
MICHIGAN | DETROIT,MI | Resurface, rehabilitate | Pavement Improvement | $1,461,000 |
MICHIGAN | DETROIT,MI | Resurface, rehabilitate | Pavement Improvement | $415,000 |
MICHIGAN | Patch and overlay | Pavement Improvement | $5,849,298 | |
MICHIGAN | DETROIT,MI | Resurface, rehabilitate | Pavement Improvement | $512,000 |
MICHIGAN | DETROIT,MI | Resurface | Pavement Improvement | $350,000 |
MICHIGAN | DETROIT,MI | Reconstruct and Widen | Pavement Widening | $62,897,639 |
MICHIGAN | DETROIT,MI | Patch and Overlay | Pavement Improvement | $10,740,940 |
MICHIGAN | DETROIT,MI | Patch and overlay | Pavement Improvement | $497,673 |
MICHIGAN | DETROIT,MI | Resurface, Rehab, or Restore | Pavement Improvement | $1,749,000 |
MICHIGAN | DETROIT,MI | Resurface, Rehab, or Restore | Pavement Improvement | $879,000 |
MICHIGAN | DETROIT,MI | Resurface, Rehab, or Restore | Pavement Improvement | $827,000 |
MICHIGAN | Deck ptch, P/H, jts, subst rep | Bridge Improvement | $832,723 | |
MICHIGAN | Concrete Pavement Repair | Pavement Improvement | $939,188 | |
MICHIGAN | Culvert rehabilitation | Other | $47,297 | |
MICHIGAN | Culvert rehabilitation | Pavement Improvement | $1,194,651 | |
MICHIGAN | HMA Overlay | Pavement Improvement | $2,842,828 | |
MICHIGAN | Cold mill, HMA resurfacing | Other | $65,000 | |
MICHIGAN | Cold mill, HMA resurfacing | Pavement Improvement | $1,289,434 | |
MICHIGAN | Multiple Course Micro-Surface | Pavement Improvement | $477,204 | |
MICHIGAN | Reconstruct | Other | $331,098 | |
MICHIGAN | HOLLAND | Resurfacing | Pavement Improvement | $615,578 |
MICHIGAN | GRAND RAPIDS | Resurface and shoulder | Pavement Improvement | $1,449,734 |
MICHIGAN | Resurface road and shoulders | Pavement Improvement | $596,768 | |
MICHIGAN | Pin and Hanger Replacment | Bridge Improvement | $675,899 | |
MICHIGAN | Coldmill and HMA Resurface | Pavement Improvement | $2,135,170 | |
MICHIGAN | GRAND RAPIDS | Resurface | Pavement Improvement | $112,237 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Resurface | Pavement Improvement | $508,820 |
MICHIGAN | GRAND RAPIDS | Coldmill and HMA Resurface | Pavement Improvement | $396,018 |
MICHIGAN | GRAND RAPIDS | Cold Mill, HMA Resurface | Pavement Improvement | $2,915,170 |
MICHIGAN | GRAND RAPIDS | Cold Mill & HMA Resurface | Pavement Improvement | $1,849,644 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Resurface | Pavement Improvement | $230,691 |
MICHIGAN | MUSKEGON-MUSKEGON HEIGHTS | Resurface | Pavement Improvement | $200,000 |
MICHIGAN | Coldmill and HMA Resurface | Pavement Improvement | $236,955 | |
MICHIGAN | Guardrail Upgrade | Safety/Traffic Management | $211,886 | |
MICHIGAN | SAGINAW | Barrier Rail Replacement | Bridge Improvement | $1,105,965 |
MICHIGAN | SAGINAW | Reconstruct | Pavement Improvement | $5,727,070 |
MICHIGAN | SAGINAW | Resurface | Pavement Improvement | $1,794,668 |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $80,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $82,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $80,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $85,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $68,000 | |
MICHIGAN | Single Course Chip Seal | Pavement Improvement | $80,000 | |
MICHIGAN | Non-Motorized Shoulders | Pavement Improvement | $602,251 | |
MICHIGAN | Aggregate Shoulder Resurfacing | Pavement Improvement | $91,771 | |
MICHIGAN | Aggregate Shoulder Resurfacing | Pavement Improvement | $92,180 | |
MICHIGAN | Cold Mill & HMA Resuf | Pavement Improvement | $3,615,550 | |
MICHIGAN | Resurface | Pavement Improvement | $100,000 | |
MICHIGAN | Resurface | Pavement Improvement | $100,000 | |
MICHIGAN | PORT HURON | Street re-alignment | Pavement Improvement | $938,832 |
MICHIGAN | PORT HURON | Reconstruct road | Pavement Improvement | $512,371 |
MICHIGAN | Resurface road | Pavement Improvement | $213,948 | |
MICHIGAN | PORT HURON | Resurface road | Pavement Improvement | $446,124 |
MICHIGAN | Non-Motorized Shoulders | Pavement Improvement | $656,568 | |
MICHIGAN | Resurface | Pavement Improvement | $180,000 | |
MICHIGAN | Reconstruct | Pavement Improvement | $321,566 | |
MICHIGAN | Mill and two course overlay | Pavement Improvement | $16,359,686 | |
MICHIGAN | Mill & resurface | Pavement Improvement | $4,088,897 | |
MICHIGAN | ANN ARBOR | Resurface road | Pavement Improvement | $210,000 |
MICHIGAN | DETROIT,MI | Patch and Overlay | Pavement Improvement | $866,239 |
MICHIGAN | DETROIT,MI | Mill and Resurface | Pavement Improvement | $380,361 |
MICHIGAN | DETROIT,MI | Landscaping & Ornamental Fence | Other | $607,744 |
MICHIGAN | DETROIT,MI | Deck Replacement | Bridge Improvement | $13,733,403 |
MICHIGAN | DETROIT,MI | Deck Replacement | Bridge Improvement | $1,257,076 |
MICHIGAN | DETROIT,MI | Deck Replacement | Bridge Improvement | $4,187,589 |
MICHIGAN | DETROIT,MI | Resurface road | Pavement Improvement | $681,745 |
MICHIGAN | DETROIT,MI | Removal of Railroad Structures | Bridge Improvement | $955,120 |
MICHIGAN | DETROIT,MI | Resurface road | Pavement Improvement | $1,070,201 |
MICHIGAN | DETROIT,MI | Sound wall | Other | $6,788,223 |
MICHIGAN | DETROIT,MI | Resurface road | Pavement Improvement | $360,000 |
MICHIGAN | ANN ARBOR | Patch and Overlay | Pavement Improvement | $621,392 |
MICHIGAN | ANN ARBOR | Patch and Overlay | Pavement Improvement | $575,349 |
MICHIGAN | Reconstruct non-motorized path | Transportation Enhancements | $3,584,690 | |
MICHIGAN | DETROIT,MI | Resurface road | Pavement Improvement | $315,875 |
MICHIGAN | Bridge Replacement | Bridge Replacement | $233,642 | |
MICHIGAN | HMA Crack Treatment | Pavement Improvement | $180,194 | |
MICHIGAN | HMA Crack Treatment | Pavement Improvement | $296,665 | |
MICHIGAN | Install ESS | Safety/Traffic Management | $1,150,758 | |
MICHIGAN | DETROIT,MI | Upgrade existing system | Other | $7,000,000 |
MICHIGAN | Crack Treatment | Pavement Improvement | $130,575 | |
MICHIGAN | Guardrail Upgrading | Safety/Traffic Management | $380,834 | |
MICHIGAN | Install Dynamic Message Signs | Safety/Traffic Management | $1,400,224 | |
MICHIGAN | Install Environmental Sensors | Safety/Traffic Management | $1,723,100 | |
MINNESOTA | TH10: END OF 4 LN E OF WADENA TO W LIM OF MOTLEY - GR, BIT MILL & OVLY, PAVE SHLDRS & RUMBLE STRIPS | Pavement Improvement | $7,313,194 | |
MINNESOTA | TH 75: TH 12 IN ORTONVILLE TO 0.1 MI N OF TH 28 IN GRACEVILLE - GR, BIT MILL & OVLY | Pavement Improvement | $5,143,074 | |
MINNESOTA | TH 169: 0.3 MI N OF CSAH 13 TO 0.4 MI S OF CSAH 11, MILL & OVLY, PAVE SHLDRS | Pavement Improvement | $4,163,703 | |
MINNESOTA | I-35W: CSAH 48 SB ENT RAMP TO 0.1 MI N OF TH21 (NB & SB LNS - THICK BIT OVLY, REHAB 10 BRS | Pavement Improvement | $4,769,068 | |
MINNESOTA | DISTRICTWIDE: AT VARIOUS SITES ON TH 15,19,22,62,66,86,91,93,109,169 & 270-INSTALL GUARDRAIL & END TREATMENT (CABLE MEDIAN BARRIER | Safety/Traffic Management | $483,893 | |
MINNESOTA | DISTRICT WIDE: ON TH's 35, 14, 16, 44, 52, 56, 61, 63, 250 & 251 - GUARDRAIL INSTALL & REPLACEMENT | Safety/Traffic Management | $1,695,398 | |
MINNESOTA | TH 90: FR 2.5 MI E CSAH 1 TO 0.9 MI E TH 63 - (EB LANES, MILL & OVERLAY | Pavement Improvement | $2,108,897 | |
MINNESOTA | TH 90: FR W LIMITS ALDEN TO TH 13 - INSTALL HEAVY BIT OVLY ON I-90 (WB & UNBONDED CONCRETE OVLY ON I-90 (EB) | Pavement Improvement | $17,117,366 | |
MINNESOTA | TH 90: FR 2.3 MI E OF TH 74 TO 0.5 MI W OF W JCT TH 43 (WB LANES - INSTALL BIT OVLY | Pavement Improvement | $4,511,492 | |
MINNESOTA | TH 94: FR DOUGLAS / TODD CO LINE TO SAUK CENTRE - INSTALL HIGH TENSION CABLE MEDIAN BARRIER (GUARDRAIL) | Safety/Traffic Management | $1,551,326 | |
MINNESOTA | Districtwide:Various Locations-Curve Chevrons (Traffic Control Device) | Safety/Traffic Management | $45,740 | |
MINNESOTA | I-90: 0.69 MI W OF CSAH 12 OVERPASS TO NEAR TH 61 (EB & WB LNS, MILL & OVLY | Pavement Improvement | $3,016,818 | |
MINNESOTA | TH 93:FR TH 112 TO BR #9309 AT LESUEUR TO TH 169 - REPL CONCRETE PAVEMENT, MILL & OVLY, REPL EXP JOINTS & APPRO PANES FOR BR #72007 | Pavement Improvement | $437,312 | |
MINNESOTA | TH 23: CSAH 31 (END OF 4-LANE NEAR NEW LONDON TO CSAH 6 (BEGIN PAYNESVILLE BYPASS - MILL & OVERLAY | Pavement Improvement | $1,202,117 | |
MINNESOTA | TH 65: JCT TH 210 / 65 TO 1.1 MI S OF BR #5920, PVMT RELAMATION, CENTER & TURN LANES, REPL BR #6339 W CULV #01X04 | Pavement Improvement | $5,161,594 | |
MINNESOTA | TH 61: At Silver Cliff, Lafayette Bluff Tunnel, Skid Treatment | Safety/Traffic Management | $78,722 | |
MINNESOTA | I-35: 3.7 MI S OF TH 210, NEAR ATKINSON BR, LIVING SNOW FENCE (LANDSCAPING) | Transportation Enhancements | $77,971 | |
MINNESOTA | TH 169: 0.39 MI S OF CSAH 5 TO 0.43 MI W OF CSAH 67, CHISHOLM & HIBBING SUBSIDENCE, GR, REINFORCED CONC & BIT | Pavement Improvement | $7,451,852 | |
MINNESOTA | TH 197: IN BEMIDJI, AT RIDGEWAY AV NW & TH 2: IN CASS LAKE, AT GRANT UTLEY | Safety/Traffic Management | $265,584 | |
MINNESOTA | TH 1: FR WARREN TO THIEF RIVER FALLS IN MARSHALL & PENNINGTON CO's - BIT RECLAIM, MILL & OVERLAY | Pavement Improvement | $6,732,298 | |
MINNESOTA | TH 2: REPL BR #'s 04003 & 04004 WITH BOX CULVERT #04X04 0.5 MI W OF TH 89 (OVER ABANDONED RR TRACK), LOWERING GR TO IMPROVE SAFETY | Pavement Improvement | $2,515,000 | |
MINNESOTA | I-94: CSAH 75 TO 1.5 MI W OF TH 23 & STEARNS / WRIGHT CO LN TO TH 25, CONC PVMT REHAB / DIAMOND GRIND | Pavement Improvement | $6,312,466 | |
MINNESOTA | TH 94: 1.4 MI SE OF JCT TH 71 - REPLACE DECK & PAINT BR #73806A & 73842, MILL & OVERLAY TH 94: 1.4 MI SE OF JCT TH 71 - REPLACE DECK & PAINT BR #73806A & 73842, MILL & OVERLAY | Bridge Improvement | $1,592,142 | |
MINNESOTA | I-94 (EB & WB: 0.132 MI N OF N JCT TH 59 TO 0.453 MI E OF OTTERTAIL / GRANT CO LN, CONC PVMT REHAB, REST AREA PRESERVATION | Pavement Improvement | $8,762,711 | |
MINNESOTA | I-90: repl BRs 8929 at Dobbins Crk, 6807 (WB) & 6808 (EB over Twp Rd & Turtle Crk & 9176 (Oakland Av Flyover) in Austin, incl Appr | Bridge Replacement | $3,205,500 | |
MINNESOTA | TH 90: FR 1.98 MI W OF TH 169 TO 0.6 MI E OF TH 22 - BR APPR, PANEL REPL, BR LOW SLUMP, OVERLAY & BR JT REPAIRS | Pavement Improvement | $2,036,684 | |
MINNESOTA | TH169 (DESIGN BUILD): REPL UTIL, RECONST PVMT, SIG IMP IN ST PETER, CONC FR JEFFERSON TO CHATHAM, BIT FR CHATHAM TO UNION ST | Pavement Improvement | $14,483,026 | |
MINNESOTA | I-90: OVERLAY PARKING LOT & REHAB CURBWALK (ADA) AT 2 REST AREAS, CLEAR LAKE & DES MOINES | Pavement Improvement | $321,920 | |
MINNESOTA | TH 7: 2800' E OF CSAH 41 TO W END OF BR #12007, UNBONDED CONC OVLY | Pavement Improvement | $9,897,248 | |
MINNESOTA | Districtwide guardrail replacement project (MAX PRICE) | Safety/Traffic Management | $1,070,000 | |
MINNESOTA | TH 68: MILROY TO WABASSO (RURAL SECTIONS ONLY, MILL & OVLY | Pavement Improvement | $2,219,889 | |
MINNESOTA | TH 95: 0.4 MI E OF CSAH 2 TO .779 MI E OF ISANTI / CHISAGO CO LN, MILL & OVLY, REPL BR #92099 W #30X03, GUARDRAIL | Pavement Improvement | $2,771,586 | |
MINNESOTA | DULUTH-SUPERIOR (WI) | TH194: ANDERSON RD TO MESABA AVE IN DULUTH - PVMT REPAIR | Pavement Improvement | $1,572,086 |
MINNESOTA | DULUTH-SUPERIOR (WI) | TH 23: FOND DU LAC TO GARY, 1100' E OF 130TH ST TO 1515' N OF CR 3 (BECKS RD), M&O,DRAIN, C&G, SW, LIGHTING & SRTS:CONST BUMPOUTS | Pavement Improvement | $4,560,000 |
MINNESOTA | TH 53: FR 8.6 MI N OF N JCT TH 1-94 TO 2.2 MI N JCT TH 33 - UNBONDED OVLY, CONC PAVE, REHAB BR #69062 | Pavement Improvement | $12,170,817 | |
MINNESOTA | DISTRICTWIDE:SIGN REPLACEMENT @ CASS LAKE, OAK LAKE & FISHERS LANDING REST AREA & ERSKINE & MARCOUX CORNER INTERSECTION, SIGN REPL | Safety/Traffic Management | $115,825 | |
MINNESOTA | TH2: CSAH 18 TO 0.11 MI W OF TH46, ADD 3RD LN FR 0.11 MI TO 0.23 MI W OF TH46 & TH6: N LIM OF DEER RIVER TO 6.9 MI S OF TH286 | Pavement Improvement | $4,031,685 | |
MINNESOTA | TH-169, UBO (SB Only) from 0.5 mile N of Rum River to 0.3 mile N of CR 103/CSAH 19 S of Onamia - Unbonded Concrete overlay | Pavement Improvement | $4,788,587 | |
MINNESOTA | TH 23: OVER THE RUM RIVER, W OF MILACA, REPL BR #6673 W #48030 & APPROACHES | Bridge Replacement | $1,692,300 | |
MINNESOTA | TH 95: REPL BR #9075 WITH BR #30010 OVER RUM RIVER AT 3.7 MI W OF W LIM OF CAMBRIDGE & APPROACHES | Bridge Replacement | $1,410,631 | |
MINNESOTA | TH 107: REPL BR #6419 WITH BR #33002 OVER SNAKE RIVER AT S LIMITS OF GRASSTON & APPROACHES | Bridge Replacement | $1,322,178 | |
MINNESOTA | D-3 DISTRICTWIDE: COORDINATE 9 SIGNALIZED CORRIDORS (STUDY & MODIFICATION OF SIGNAL TIMING) | Safety/Traffic Management | $420,000 | |
MINNESOTA | TH 27 and CSAH 45TH 27: AT CSAH 45 / TH 94 RAMPS IN ALEXANDRIA MN - INSTALL TRAFFIC CONTROL SIGNAL SYSTEM | Safety/Traffic Management | $227,909 | |
MINNESOTA | TH210: AT JCT TH210 & REDWOOD LANE - INSTALL TRAFFIC SIGNAL | Safety/Traffic Management | $374,500 | |
MINNESOTA | TH9: NASHUA 2 MI W-INSTALL RR FLASHING LIGHT SIGNALS W/ GATES AT CPR'S AT-GRADE CROSSING | Safety/Traffic Management | $115,403 | |
MINNESOTA | TH 28: (DARNEN TWP) W OF MORRIS - INSTALL RR FLASHING LIGHTS SIGS W GATES & CANTS @ BNSF'S AT-GR XING | Safety/Traffic Management | $263,338 | |
MINNESOTA | I-90: 0.1 MI E OF TH 22 INTCHG TO 0.4 MI W OF TH 109, CONC PVMT REHAB, RESURF SHLDRS | Pavement Improvement | $3,923,374 | |
MINNESOTA | I-90: BEAVER CREEK REST AREA - STATE ENTRY SIGNS & LANDSCAPING REHAB | Transportation Enhancements | $80,250 | |
MINNESOTA | TH 371: AT TH 371 TRAVEL CRT & FROM FORT RIPLEY TO CR 48, LIVING SNOW FENCE, APPURTENANCES | Transportation Enhancements | $119,698 | |
MINNESOTA | DULUTH-SUPERIOR (WI) | MSAS 140: AERIAL LIFT BR #L6116 (LAKE AVE) - BR PAINTING & REHAB | Transportation Enhancements | $4,950,350 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | CSAH 4: RICE LAKE RD, ARROWHEAD RD TO MESABI AVE - MILL & OVLY | Pavement Improvement | $1,598,420 |
MINNESOTA | CSAH 14: LAKE AVE FROM 3.9 TO 4.1 MI NE OF JCT TH 65 - REPL BR #7238 W BR #01531 & APPROACHES OVER THE PRAIRIE RIVER | Bridge Replacement | $1,306,840 | |
MINNESOTA | CSAH 9: BETWEEN CSAH 10 & TH 71 - REPLACE OLD BR #29509 WITH NEW BR #29529, INCLUDES APPROACH GR & SURF | Bridge Replacement | $451,853 | |
MINNESOTA | CSAH 1: 0.9 MI S OF KITTSON CSAH 4 AT N BRANCH OF TWO RIVERS - REPLACE BR #7083 WITH BR #35536 | Bridge Replacement | $778,925 | |
MINNESOTA | MSAS108: BEMIDJI ON IRVINE AVE FR 3RD ST TO TH197-BIT RECLAMATION | Pavement Improvement | $2,053,169 | |
MINNESOTA | CSAH 7: OVER JUC DITCH #11, REPL BR #7445 WITH #45J02 | Bridge Replacement | $71,918 | |
MINNESOTA | CSAH15: REPL TIMBER BR #7479 W BOX CULVENT #45544 OVER THE SNAKE RIVER | Bridge Replacement | $560,954 | |
MINNESOTA | MSAS 125: TH 27 TO N CITY LIMITS - STREET RECONST, GR, PAVE, CURB & GUTTER | Pavement Improvement | $1,007,039 | |
MINNESOTA | CSAH 6: REPL BR #L2529 OVER STANCHFIELD CREEK WITH BR #30515 | Bridge Replacement | $475,463 | |
MINNESOTA | CR 203: (330TH ST) FR TH 10 TO CSAH 2 - GR, AGG BASE, BIT SURF & AGG SHOULDERS | Pavement Improvement | $786,114 | |
MINNESOTA | CSAH 7: OVER BUFFALO RIVER, REPL BR #7251 W #03J37 CULV, BIT SURF | Bridge Replacement | $410,688 | |
MINNESOTA | CSAH 7: N LIMITS OF BRANDON TO S LIMITS OF MILLERVILLE - BIT OVLY, BIT AGG SHLDS | Pavement Improvement | $1,004,623 | |
MINNESOTA | CSAH 33: OVER JUDICIAL DITCH #19, REPL BR #89468 WITH BOX CULV #79J19 | Bridge Replacement | $282,769 | |
MINNESOTA | CSAH 16: FR BR #78507 TO TH 75 N OF WHEATON - HOT MIX BIT, SHOULDERING & BIT SEAL COAT | Pavement Improvement | $2,428,830 | |
MINNESOTA | MSAS 135: REPL BR #5789 W/ BR #74537 CEDAR AVE OVER MAPLE CREEK, PRECAST CONC BEAM STRUCTURE & APPROACH GRADING... | Pavement Improvement | $1,363,231 | |
MINNESOTA | CSAH 1: FR 285TH ST TO FEATHERSTONE RD - GR, AGG BASE, BIT SURF, AGG SHLD, LTG SS & REPL BR #L0357 W BR #25J59 OVER A STREAM | Pavement Improvement | $1,784,727 | |
MINNESOTA | CSAH 20: REPL BR #89249 WITH BR #32564 OVER CO DITCH 3, APPROACH GR | Bridge Replacement | $326,354 | |
MINNESOTA | CSAH 3: REPL BR #7191, 1963 STEEL BEAM CONCRETE DECK STRUCTURE WITH THREE 12' x8' BOX CULVERTS #81J09 | Bridge Replacement | $766,010 | |
MINNESOTA | CSAH 3: REPL BR #7139, 1954 STEEL BEAM CONCRETE DICK STRUCTURE WITH THREE 12'X8' BOX CULVER #81J09 | Bridge Replacement | $408,832 | |
MINNESOTA | CSAH 1: FR N CITY LIM OF BREWSTER TO CSAH 18 - EDGE DRAIN TILE, PLANT MIX, BIT NON-WEAR & WEAR SURF, AGG SHLDS | Pavement Improvement | $1,685,712 | |
MINNESOTA | CSAH 12: OVER DM&E RR, CONST NEW BR #07589 | New Bridge Construction | $4,065,812 | |
MINNESOTA | CSAH 32: 1 MI S OF TH 7 / 55 - REPL BR #7137 WITH BR #12551 OVER THE CHIPPEWA RIVER | Bridge Replacement | $657,305 | |
MINNESOTA | CSAH 3: 0.9 MI N OF JCT CSAH 8 - REPL BR #4251 W BR #42565 OVER S BRANCH OF THE YELLOW MEDICINE RIVER | Bridge Replacement | $407,423 | |
MINNESOTA | CSAH 7: REPL BR #92467 OVER HIGH ISLAND CREEK WITH BR #43551, 4.3 MI S OF STEWART, INCL APPR GR | Bridge Replacement | $456,825 | |
MINNESOTA | ON CSAH 6: FR SO CO LINE TO TH 14, CSAH 9 FR CSAH 1 TO CSAH 2, CSAH 11 FR CSAH 8 TO E CO LINE - BIT OVLY | Pavement Improvement | $1,130,303 | |
MINNESOTA | CSAH 9: REPL BR #65527 W BR #65562 OVER CHETAMBA CR, INCLUDES APPROACH GR & SURF | Bridge Replacement | $459,776 | |
MINNESOTA | CSAH 3: REPL BR #7103 W BR #97658 OVER THE LAC QUI PARLE RIVER, INCL APPROACH GR & SURF | Bridge Replacement | $299,056 | |
MINNESOTA | MSAS 19:7TH AVE SE FR 17TH ST SE TO 33RD ST SE - REMOVALS, GR, BIT SURF, CONC C&G, STORM & SAN SWR, WATERMAIN, LIGHT & TRAFF STRIP | Pavement Improvement | $2,324,519 | |
MINNESOTA | CSAH 23: FR JCT CSAH 29 TO JCT CSAH 32 - BIT RESURF & BIT SHLDS | Pavement Improvement | $1,063,128 | |
MINNESOTA | CSAH 5: FR CSAH 4 TO THE RED LAKE RESERVATION LINE - SUB GR BASE REPAIR, BIT SURF & AGG SHLDRS | Pavement Improvement | $1,680,669 | |
MINNESOTA | CSAH 2: FR TH 28 W TO TODD CO CSAH 11 - BIT OVLY & MISC SAFETY IMPROVEMENTS, AGG SHOULDERS | Pavement Improvement | $898,365 | |
MINNESOTA | CSAH 5: REPL BR #7130 W BR #71525 OVER THE ST. FRANCIS RIVER, INCLUDES APPROACH GR & PAVE | Bridge Replacement | $578,176 | |
MINNESOTA | MSAS 104: (JAMISON AVE) FR CR 119 TO CSAH 18 -GR, AGG BASE, CURB & GUTTER, BIT SURF,STORM SEWER,BIT BIKE PATH & TRAFF CTRL SYSTEM | Pavement Improvement | $2,996,407 | |
MINNESOTA | CSAH 1: SOPHUS ANDERSON RD TO 0.25 MI E OF OTTER TAIL CSAH 10 - BIT OVLY & AGG SHLDR | Pavement Improvement | $1,910,477 | |
MINNESOTA | MSAS 121 (CONCORD ST): OVER OTTER TAIL RIVER, REPL BR #56507 WITH #56540 | Bridge Replacement | $1,026,000 | |
MINNESOTA | CSAH 8: FR TH 67 TO CSAH 5 E & N OF CLARKSFIELD - GR, SHLD WIDENING, INSLOPE INPR, BIT MILL & OVLY, AGG SHLD, PVT MKG | Pavement Improvement | $1,373,993 | |
MINNESOTA | CSAH 2/16: 1.38 MI S OF CR 77 TO TH 7, GR, SURF, REPL BR #94098 W #34J25 CULV | Pavement Improvement | $2,759,071 | |
MINNESOTA | CSAH 4: JCT CSAH 32 (ARROWHEAD) TO JCT CSAH 9 (MARTIN) - BIT PAVE RECLAMATION | Pavement Improvement | $2,562,578 | |
MINNESOTA | MSAS 165 (PINE CONE RD): CR 120 TO CR 134, GR, BASE, BIT, C&G, DRAINAGE, SIGNING, STRIPING, & APPURTENANT WORK | Pavement Improvement | $1,729,503 | |
MINNESOTA | ROCHESTER | MSAS 119: REPL BR #6839, 4TH ST OVER BEAR CREEK WITH BR #55588 | Bridge Replacement | $2,787,019 |
MINNESOTA | DISTRICT 1 (3 LOCATIONS): TH 61 @ GRAND PORTAGE, TH 2 @ BONG BRIDGE, I-535 @ BLATNIK BR, STATE ENTRY SIGN LANDSCAPE REHABILITATION | Transportation Enhancements | $132,579 | |
MINNESOTA | I-35: STATE ENTRY SIGN LOCATION LANDSCAPE REHAB AT ALVERT LEA, NO OF IA/MN BORDER - ENTRY AND EXIT SIGNS | Transportation Enhancements | $60,642 | |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | County Road 17 Interchange Living Snow Fence Landscaping south of North Branch | Transportation Enhancements | $79,895 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Pavement Preservation - TH95 in North Branch to Chisago County Road 9 unbonded concrete overlay, | Pavement Improvement | $13,738,800 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Lake Elmo intersection improvement | Pavement Improvement | $3,210,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Rebuild lighting system - TH 100 south of 394 | Safety/Traffic Management | $2,296,429 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Districtwide loop detectors plus 2 TH13 signals | Safety/Traffic Management | $963,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Rebuild Cable Median Barrier, Assign Resources | Safety/Traffic Management | $1,239,274 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Pavement Preservation - North junction of 35E/35W to North of TH 8 - bituminous mill and overlay, includes CMPS aux. lane. | Pavement Improvement | $8,239,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Landscaping between TH5 and I394 | Other | $535,000 |
MINNESOTA | FARGO-MOORHEAD (ND) | I-94: LANDSCAPING OF THE MOOREHEAD STATE ENTRY SIGN & LANDSCAPING | Transportation Enhancements | $90,950 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | TH 169 to Fernbrook - Construct new 4-lane freeway and interchanges | Pavement Widening | $56,215,303 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Districtwide Signal & Lighting Cabinet Replacement | Safety/Traffic Management | $1,926,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Interchange modification to allow WB 494 to enter WB 212 as an add lane, Layout work needs to begin soon | Pavement Improvement | $1,070,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Interchange modification to EB and WB I-494 ramps to SB I-35E, Layout work needs to begin soon | Safety/Traffic Management | $1,284,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Districtwide Fiber installation | Safety/Traffic Management | $1,177,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Districtwide Permanent Pavement Markings | Pavement Improvement | $1,070,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Lighting Replacement - 494 to 694 | Safety/Traffic Management | $5,350,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Pavement Preservation - TH97 to Stillwater, Bituminous Mill & Overlay | Pavement Improvement | $5,986,650 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | Districtwide CMS & shelters | Safety/Traffic Management | $1,605,000 |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | TH 7: AT WOODDALE AVE - CONST A GRADE SEPARATED INTERCHANGE, ETC & NEW BRIDGE #27B65 FR CP RR CR #5199 TO TH 100 SB | New Bridge Construction | $3,465,000 |
MINNESOTA | FARGO-MOORHEAD (ND) | MSAS 126 (20TH ST S): IN MOORHEAD, 12TH AV TO 24TH AV, URBAN GRADING & SURFACING | Pavement Improvement | $1,400,000 |
MINNESOTA | FARGO-MOORHEAD (ND) | MSAS 130: MOORHEAD CENTER / NP AVE OVER THE RED RIVER - REPL 18 PIN & HANGER ASSEMBLIES & REPAIR BR #5270 IN MOORHEAD | Bridge Improvement | $895,780 |
MINNESOTA | D-1 MESABI TRAIL: GIANTS RIDGE TO TH 135, CONST BIT SURFACED TRAIL INCL PED BR #69675 OVER NARROWS BETWEEN SABIN LAKE & WYNNE | Transportation Enhancements | $1,393,332 | |
MINNESOTA | MINNEAPOLIS-ST. PAU, MN | CSAH 10: REALINE & WIDEN CSAH 10 & CSAH 101 FR CSAH 101 TO WEST OF PEONY LN | Pavement Widening | $3,064,000 |
MISSISSIPPI | VAIDEN-FRENCH CAMP ROAD; KNOX CROSSING ROAD | Pavement Improvement | $1,375,600 | |
MISSISSIPPI | CARTER HILL ROAD AND BROWN'S WELLS ROAD | Pavement Improvement | $456,620 | |
MISSISSIPPI | US 45 FR KEMPER CL TO BROOKSVILLE | Pavement Improvement | $12,702,800 | |
MISSISSIPPI | US 45 FM JUST N OF DRYDEN RD TO THE LEE CL | Pavement Improvement | $3,656,300 | |
MISSISSIPPI | PASCAGOULA-MOSS POINT | US 90 from Dolphin Dr. to West Pascagoula River. PE & Const. 3R overlay, Add auxilary lane & signals. Jackson Co. | Pavement Improvement | $14,600,000 |
MISSISSIPPI | MT. LEVEL ROAD | Bridge Replacement | $804,700 | |
MISSISSIPPI | BENSON-HERRON ROAD | Bridge Replacement | $453,000 | |
MISSISSIPPI | STREETS IN THE TOWN OF ANGUILLA - VARIOUS STREETS [A - V] | Pavement Improvement | $90,200 | |
MISSISSIPPI | US 78 FROM EAST END OF THE TENN-TOM BRIDGE TO THE ALABAMA STATELINE | Pavement Improvement | $4,629,100 | |
MISSISSIPPI | US 78: UPGRADE TO INTERSTATE STANDARDS MCCULLOUGH BLDV @ BELDEN TO US 45 | Pavement Improvement | $3,227,900 | |
MISSISSIPPI | Upgrade roads in the Town of Webb in Tallahatchie Co. 2.9 Miles | Pavement Improvement | $47,000 | |
MISSISSIPPI | US 72 FM THE TIPPAH CL TO SR 2 | Pavement Improvement | $6,206,400 | |
MISSISSIPPI | US 49 from 1.5 mi. N of Seminary then run north for 17.6 miles (NB Lane) | Pavement Improvement | $4,206,800 | |
MISSISSIPPI | US 49 beg. 15.9 mi. north of the Covington CL then run north for 5.6 mi. | Pavement Improvement | $2,800,000 | |
MISSISSIPPI | US 49 beg. at the Covington CL then run north for 15.9 mi. (NB lane) | Pavement Improvement | $3,600,000 | |
MISSISSIPPI | US 49 IN YAZOO COUNTY FROM THE BIG BLACK RIVER TO THE CONCRETE SECTION AT BENTONIA | Pavement Improvement | $2,473,900 | |
MISSISSIPPI | US 49 from US 82 to SR 8 in Leflore County. Overlay. | Pavement Improvement | $3,340,000 | |
MISSISSIPPI | US 82 FROM NEAR MILITARY RD TO THE ALABAMA STATE LINE | Pavement Improvement | $3,473,000 | |
MISSISSIPPI | BURNED BRIDGE-PINE GROVE ROAD | Bridge Replacement | $2,199,700 | |
MISSISSIPPI | US 98 from Walthall CL to the west end of the Tylertown Bypass (EB & WB Lanes) | Pavement Improvement | $3,174,600 | |
MISSISSIPPI | US 98 from the west end of the Tylertown bypass to the east end of the Tylertown bypass | Pavement Improvement | $1,809,000 | |
MISSISSIPPI | US 84 from the US 61 Intersection to the Franklin CL | Pavement Improvement | $3,620,000 | |
MISSISSIPPI | US 84/US 65 MS River Bridge Lighting | Transportation Enhancements | $1,702,600 | |
MISSISSIPPI | US 84 FROM 7.5 MILES EAST OF ADAMS COUNTY LINE TO WEST END OF BUDE-MEADVILLE BYPASS IN FRANKLIN COUNTY. OVERLAY. | Pavement Improvement | $4,383,300 | |
MISSISSIPPI | SR 8 FROM CLEVELAND TO SUNFLOWER C.L. (ADD 2 LNS) | Pavement Widening | $8,630,000 | |
MISSISSIPPI | SR 8 Bolivar County Hospital to Ruleville | Pavement Improvement | $2,500,000 | |
MISSISSIPPI | SR 570 BTW AMITE CL AND W CORP MCCOMB NOTE: P.E. IS 100838 | Pavement Improvement | $5,910,000 | |
MISSISSIPPI | SR 15 from 15th Street to Old Hwy 15 | Pavement Improvement | $1,331,400 | |
MISSISSIPPI | SR 15 FM N CONN OF SR 15 BYPASS TO PONTOTOC CL | Pavement Improvement | $2,571,300 | |
MISSISSIPPI | SR 29 REPLACE BR 12.8 AT BLACK CREEK [BR # 12.8] | Bridge Improvement | $4,258,100 | |
MISSISSIPPI | SR 35 multilane section in Kosciusko from Natchez Trace Parkway to SR 12. Overlay | Pavement Improvement | $1,300,000 | |
MISSISSIPPI | SR 19 FROM NEWTON CL TO SR 492 | Pavement Widening | $34,406,000 | |
MISSISSIPPI | EDDICETON-CASEYVILLE ROAD | Pavement Improvement | $1,801,880 | |
MISSISSIPPI | MISS 305 FROM COCKRUM TO LEWISBURG BR NOS. 14.9, 15.2,15.3,15.6 | Bridge Replacement | $7,551,300 | |
MISSISSIPPI | SR 13 from 4.7 miles north of Marion CL to US 84 at Prentiss in Jefferson Davis County. Overlay | Pavement Improvement | $1,749,000 | |
MISSISSIPPI | ROCKPORT-SHIVERS & MT. ZION ROADS | Bridge Replacement | $701,000 | |
MISSISSIPPI | SR 1 2.878 miles N SR 8 to Bungee Corp Turnoff | Pavement Improvement | $3,026,300 | |
MISSISSIPPI | SR 27 From Intersection of 27 & 28 to 10 miles North ending at end of maintenance section | Pavement Improvement | $3,421,000 | |
MISSISSIPPI | SR 25 FR SR 471 TO SR 43 | Pavement Improvement | $8,833,500 | |
MISSISSIPPI | I-59 Widen Bridge Shoulders | Bridge Improvement | $10,000,000 | |
MISSISSIPPI | I-20/59 Hawkins Crossing Rd. and 23rd Ave. East between SR 19 and US 80 | New Construction | $15,311,899 | |
MISSISSIPPI | I-59 FROM I-20/I-59 SPLIT TO SR 19 | Bridge Improvement | $10,000,000 |