3.0
replace_exterior_window_construction
95116deb-0716-4cdc-af27-09c463befc7c
bb79400e-c308-442f-bd56-52e1238b4cd0
20221115T223608Z
6DE831F7
ReplaceExteriorWindowConstruction
Replace Exterior Window Constructions with a Different Construction from the Model.
Replace existing windows with different windows to change thermal or lighting performance. Window technology has improved drastically over the years, and double or triple-pane high performance windows currently on the market can cut down on envelope loads greatly. Window frames with thermal breaks reduce the considerable energy that can transfer through thermally unbroken frames. High performance windows typically also come with low-emissivity (low?e) glass to keep radiant heat on the same side of the glass from where the heat originated. This means that during the cooling months a low-e glass would tend to keep radiant heat from the sun on the outside of the window, which would keep the inside of a building cooler. Conversely, during heating months low-e glass helps keep radiant heat from inside the building on the inside, which would keep the inside of a building warmer. Life cycle cost values may be added for the new window applied by the measure.
Replace fixed and/or operable exterior window constructions with another construction in the model. Skylights (windows in roofs vs. walls) will not be altered. Windows in surfaces with "Adiabatic" boundary conditions are not specifically assumed to be interior or exterior. As a result constructions used on windows in "Adiabatic" surfaces will not be altered. Material & installation, demolition, and O&M costs can be added to the applied window construction. Optionally any prior costs associated with construction can be removed.
For costs added as part of a design alternatives "Years Until Costs Start? is typically "0?. For a new construction scenario "Demolition Costs Occur During Initial Construction?? is "false?. For retrofit scenario "Demolition Costs Occur During Initial Construction?? is "true?. O&M cost and frequency can be whatever is appropriate for the component.
construction
Pick a Window Construction From the Model to Replace Existing Window Constructions.
Choice
true
false
change_fixed_windows
Change Fixed Windows?
Boolean
true
false
true
true
true
false
false
change_operable_windows
Change Operable Windows?
Boolean
true
false
true
true
true
false
false
remove_costs
Remove Existing Costs?
Boolean
true
false
true
true
true
false
false
material_cost_ip
Material and Installation Costs for Construction per Area Used ($/ft^2).
Double
true
false
0
demolition_cost_ip
Demolition Costs for Construction per Area Used ($/ft^2).
Double
true
false
0
years_until_costs_start
Years Until Costs Start (whole years).
Integer
true
false
0
demo_cost_initial_const
Demolition Costs Occur During Initial Construction?
Boolean
true
false
false
true
true
false
false
expected_life
Expected Life (whole years).
Integer
true
false
20
om_cost_ip
O & M Costs for Construction per Area Used ($/ft^2).
Double
true
false
0
om_frequency
O & M Frequency (whole years).
Integer
true
false
1
Envelope.Fenestration
Measure Type
ModelMeasure
string
Measure Function
Measure
string
Requires EnergyPlus Results
false
boolean
Uses SketchUp API
false
boolean
EnvelopeAndLoadTestModel_01.osm
osm
test
10AA8866
ReverseTranslatedModel.osm
osm
test
0B94403D
EnvelopeAndLoadTestModel_01Costed.osm
osm
test
40BB59D1
README.md.erb
erb
readmeerb
703C9964
README.md
md
readme
CA45F32D
OpenStudio
2.0.0
2.0.0
measure.rb
rb
script
02D95F25
ReplaceExteriorWindowConstruction_Test.rb
rb
test
E1F8556C
LICENSE.md
md
license
64FFEBDE