Road and bridge projects are expected to make up one of the biggest chunks of the jobs created in the stimulus package. Below, you’ll find a chart of more than 5,800 projects that have been approved by the U.S. Department of Transportation. Once given the green light, states can put the projects out to bid, contract them and begin construction work. So far, about 2,300 projects are under way.
Help us find out how much progress has been made on these projects by participating in our Stimulus Spot Check.
For more on the stimulus, check out our blog and resource page.
State | Urban Area | Project Description | Improvement Type | ARRA Funds Obligated |
---|---|---|---|---|
MISSISSIPPI | SR 438 From Hwy 61 through Arcola to Hwy 1 | Pavement Improvement | $2,500,800 | |
MISSISSIPPI | ELLISON RIDGE ROAD | Pavement Improvement | $525,000 | |
MISSISSIPPI | SR 6 between I-55 and Lafayette CL in Panola County. Overlay East Bound Lanes. | Pavement Improvement | $3,300,000 | |
MISSISSIPPI | SR 39 FR I-20 TO 52ND ST, MERIDIAN | Pavement Improvement | $3,867,400 | |
MISSISSIPPI | US 45 A FM WEST POINT TO 1 MI N OF SR 25 | Pavement Improvement | $4,000,000 | |
MISSISSIPPI | US 45A FM APPRX 9 MI N OF NOX CL TO THE CLAY CL | Pavement Improvement | $2,735,100 | |
MISSISSIPPI | US 45 A FM THE S MON CL TO THE N MON CL | Pavement Improvement | $4,000,000 | |
MISSISSIPPI | SR 331 REPLACE BRIDGE BT CALHOUN C.L. & SR 334 | Bridge Replacement | $3,960,000 | |
MISSISSIPPI | HATTIESBURG | US 49 from Edwards St. to 31st Avenue | Pavement Improvement | $8,636,900 |
MISSISSIPPI | SR 365 FM PRENTISS CL TO US 72 | Pavement Improvement | $1,548,700 | |
MISSISSIPPI | SR 198 REPLACE BRIDGE 179.0 OVER DICKEY CREEK AT BEAUMONT | Bridge Replacement | $1,469,900 | |
MISSISSIPPI | POORHOUSE ROAD | Pavement Improvement | $1,608,700 | |
MISSISSIPPI | SR 32 between SR 7 & SR 330, PE, ROW & CON for bridge rep., Calhoun & Yalobusha Cos. | Bridge Replacement | $7,080,000 | |
MISSISSIPPI | JACKSON | US 80 AND SHAW ROAD IN JACKSON, HINDS COUNTY, TRAFFIC SIGNAL | Safety/Traffic Management | $134,800 |
MISSISSIPPI | JACKSON | US 80 FR SPRINGRIDGE RD TO TERRY RD | Pavement Improvement | $6,478,100 |
MISSISSIPPI | SR 570 FR W CORP LIMITS OF MCCOMB EAST .9 MI NOTE: P.E. IS 100838 | Pavement Improvement | $1,670,000 | |
MISSISSIPPI | Base and Surface on North Holly Springs Industrial Park Access Road for approximately 2.0 miles in Marshall County. | New Construction | $2,436,600 | |
MISSOURI | ARRA,, ROUTE 2, CASS COUNTY, THIN LIFT OVERLAY FROM COMMERICAL ST TO RTE. ZZ, 14.656 MILES | Pavement Improvement | $504,700 | |
MISSOURI | ARRA, RT 5, CAMDEN CO, WIDEN TO THREE LANES TO IMPROVE CAPACITY FROM RTE F NORTH APPROXIMATELY 0.9 MILE IN SUNRISE BEACH, 0.9 MI | Pavement Widening | $894,800 | |
MISSOURI | ARRA, ROUTE 7, BENTON COUNTY, REHAB OF 2 BR DECKS OVER TRUMAN RESERVOIR FROM 1.8 MILES NORTH OF RT 77 TO WEST OF WARSAW, 2.0 MI | Bridge Improvement | $5,026,400 | |
MISSOURI | ARRA, ROUTE 15, MONROE COUNTY, PAVEMENT & SHOULDER IMPROVEMENTS FROM RT 154 N JUNCTION TO 1.1 MILES NORTH OF RT 22, 24.572 MILES | Pavement Improvement | $2,227,800 | |
MISSOURI | ARRA, ROUTE 15, AUDRAIN COUNTY, PAVEMENT IMPROVEMENTS FROM 1.1 MILES NORTH OF RTE 22 TO 0.2 MILE NORTH OF RTE 54, 5.038 MILES | Pavement Improvement | $880,500 | |
MISSOURI | ARRA, ROUTE 17, TEXAS COUNTY, THIN LIFT OVERLAY FROM RTE 106 N SUMMERSVILLE TO RTE 60 IN MT VIEW, 14.628 MILES | Pavement Improvement | $547,500 | |
MISSOURI | ARRA, ROUTE 17, HOWELL COUNTY, THIN LIFT OVERLAY FROM RTE 60 IN MT VIEW TO RTE 160, 21.067 MILES | Pavement Improvement | $879,300 | |
MISSOURI | ARRA PROJECT-RTE 17, MILLER COUNTY, REPLACE BRIDGE OVER THE OSAGE RIVER, 1 MILE EAST OF TUSCUMBIA .486 MILES | Bridge Replacement | $8,277,485 | |
MISSOURI | ARRA, RTE 17, COLE COUNTY, THIN LIFT OVERLAY FROM RTE 54 TO BRUSH CREEK, 19.266 MILES | Pavement Improvement | $848,200 | |
MISSOURI | ARRA, ROUTE 21, WASHINGTON COUNTY, PAVEMENT IMPROVEMENTS FROM 1.7 MILES SOUTH OF RTE 8 N POTOSI TO RTE N, 20.7 MILES | Pavement Improvement | $2,311,900 | |
MISSOURI | ROUTE 28, MARIES COUNTY, THIN LIFT OVERLAY FROM ROUTE 63 TO DIXON, 17.5 MILES | Pavement Improvement | $829,300 | |
MISSOURI | ARRA I-29, PLATTE COUNTY; RESURFACE PAVEMENT AND SHOULDERS AT VARIOUS LOCATION FROM RT 273 TO VIVION RD.; 19.45 MI | Pavement Improvement | $11,799,300 | |
MISSOURI | ARRA, ROUTE 31, BUCHANAN COUNTY, THIN LIFT OVERLAY FROM RTE 36 TO RTE 169, 6.222 MILES | Pavement Improvement | $301,800 | |
MISSOURI | ARRA, RTE 34, WAYNE CO, WIDEN, BUILD SHOULDERS, GRADING, PAVING, DRAINAGE & RESURFACING OF RTE 34 PIEDMONT TO RTE 67, 7.6 miles | Pavement Widening | $15,172,600 | |
MISSOURI | ARRA PROJECT-RTE 35, CLINTON, RESURFACING & BR REHAB, N/O SHOAL CREEK TO N/O RTE 166 NEAR LATHROP, BR OVER SHOAL & BRUSHY CK, 7.8 | Pavement Improvement | $14,156,500 | |
MISSOURI | ARRA, ROUTE 36, LINN COUNTY, THIN LIFT OVERLAY FROM RT 36 TO RT 11, 1.772 MILES | Pavement Improvement | $172,000 | |
MISSOURI | ARRA, ROUTE 39, LAWRENCE COUNTY, THIN LIFT OVERLAY FROM RTE 60 TO 1.5 MILES NORTH OF RTE 248, 12.127 MILES | Pavement Improvement | $498,500 | |
MISSOURI | ARRA ROUTE 41, CARROL COUNTY, PAVEMENT & SHOULDER IMPROVEMENTS FROM ROUTE 24 TO ROUTE 240 IN SALINE & CARROLL COUNTIES, 17.846 MI | Pavement Improvement | $1,569,300 | |
MISSOURI | ROUTE 41, SALINE COUNTY, THIN LIFT OVERLAY FROM RTE 240 TO RTE TT, 10.268 MILES | Pavement Improvement | $574,500 | |
MISSOURI | ARRA, ROUTE 44, PHELPS COUNTY, MAJOR PAVEMENT REHAB/RECONSTRUCTION ON I-44 WBL FM BUS LOOP 44 (ROLLA) TO SUGARTREE RD, 8.213 MILES | Pavement Improvement | $11,128,700 | |
MISSOURI | ARRA, RTE 44, PULASKI CO, MILL/FILL OVERLAY ON BUS LOOP 44 FROM RTE H TO SPUR 44 & ON RTE H FROM BUS LOOP 44 TO I-44, 5.085 MILES | Pavement Improvement | $865,600 | |
MISSOURI | ARRA, ROUTE 44, CRAWFORD COUNTY, PAVEMENT REHAB ON WESTBOUND LANES FROM 0.6 MILE WEST OF RTE H TO PHELPS COUNTY LINE, 12.507 MILES | Pavement Improvement | $897,500 | |
MISSOURI | ARRA, RT 44, FRANKLIN CO, FULL-DEPTH PAVEMENT REPLACEMENT ON EB & WB LANES FROM W/O VIADUCT ST IN PACIFIC TO RT 100 WEST, 5.072 MI | Pavement Widening | $24,595,400 | |
MISSOURI | ARRA, ROUTE 45, PLATTE COUNTY, THIN LIFT OVERLAY FROM RTE 273 TO SPUR 45 SOUTH, 11.89 MILES | Pavement Improvement | $507,200 | |
MISSOURI | ARRA, ROUTE 51, PERRY COUNTY, PAVEMENT IMPROVEMENTS FROM I-55 TO RTE 72, 16.297 MILES | Pavement Improvement | $1,722,800 | |
MISSOURI | ARRA, ROUTE 52, HENRY COUNTY, THIN LIFT OVERLAY FROM THE ST CLAIR COUNTY LINE TO RT 13, 15.143 MILES | Pavement Improvement | $509,600 | |
MISSOURI | ARRA, ROUTE 52, BATES COUNTY, THIN LIFT OVERLAY FROM RT BB TO 1.6 MILES EAST OF RT W, 5.268 MILES | Pavement Improvement | $212,200 | |
MISSOURI | ARRA, ROUTE 52, ST CLAIR COUNTY, THIN LIFT OVERLAY FROM 1 MILE WEST OF RT P TO 1.8 MILES EAST OF RT A, 4.741 MILES | Pavement Improvement | $192,400 | |
MISSOURI | ARRA PROJ - I-55, NEW MADRIDPVMNT REHAB, N - 0.3 M S/O RTE 84 TO SCOTT/NEW MADRID CO LINE, S -SCOTT/NEW MADRID CO LINE TO ARK LINE | Pavement Improvement | $15,743,400 | |
MISSOURI | ARRA, RTE 55, PEMISCOT CO, PAVEMENT REHAB-NB LANE-RTE I-55 PEMISCOT CO FROM ARKANSAS ST LINE TO 2.0 MI S OF RTE I-155 , 15.00 M | Pavement Improvement | $16,085,700 | |
MISSOURI | ARRA, ROUTE 55, NEW MADRID COUNTY, WELCOME CENTER AT MARSTON, 0.3 MILE | Transportation Enhancements | $6,439,650 | |
MISSOURI | ARRA, ROUTE 59, ATCHISON COUNTY, THIN LIFT OVERLAY FROM IOWA STATE LINE TO RT 136, 9.90 MILES | Pavement Improvement | $692,700 | |
MISSOURI | ARRA PROJECT - RTE 60, BARRY CO - RESURFACING FROM 0.6 M E/O BUS 60 WEST IN MONETT TO 0.3 M E/O RTE 14, 17.617 MILES | Pavement Improvement | $1,820,200 | |
MISSOURI | ARRA PROJECT - RTE 60, BARRY CO - CAPACITY IMPROVEMENTS FROM E/O CHAPELL DR IN MONETT TO KANSAS AVE IN REPUBLIC, 27.807 MI | Pavement Improvement | $6,286,450 | |
MISSOURI | SPRINGFIELD | ARRA, RTE 60, GREENE COUNTY, INTERCHANGE IMPROVEMENTS AT JAMES RIVER FREEWAY AND NATIONAL AVENUE IN SPRINGFIELD, 0.474 MI | Pavement Widening | $4,569,383 |
MISSOURI | ARRA, ROUTE 62, MISSISSIPPI COUNTY, THIN LIFT OVERLAY FROM RTE B IN BERTRAND TO THE CITY OF CHARLESTON, 5.856 MILES | Pavement Improvement | $323,100 | |
MISSOURI | ARRA, ROUTE 63, HOWELL COUNTY, ASPHALT MILL AND FILL FROM RTE 63 TO BROADWAY IN WEST PLAINS, 1.801 MILES | Pavement Improvement | $506,000 | |
MISSOURI | ARRA, RTE 63, ADAIR CO, CONSTRUCT NEW TWO LANE ROADWAY EAST OF KIRKSVILLE, 6.189 MI | New Construction | $17,433,500 | |
MISSOURI | ARRA, RT 65, GREENE CO, GRADING & PAVING TO ADD LANES FOR 6-LANE FREEWAY FROM BUS 65 (CHESTNUT EXPWY) TO RT D (SUNSHINE ST), 2.027 | Pavement Widening | $10,431,200 | |
MISSOURI | ARRA, RT 65, GREENE, GRADING, PAVING TO ADD LANES FOR 6-LANE FREEWAY FROM RT D (SUNSHINE ST) TO RT 60 (JAMES RIVER FREEWAY) 3.466 | Pavement Widening | $9,809,900 | |
MISSOURI | SPRINGFIELD | ARRA, RT 65, GREENE CO, GRADING, PAVING TO ADD LANES FOR 6-LANE FREEWAY FROM I-44 TO BUS RT 65 (CHESTNUT EXPWY) IN SPGFD, 2.794 MI | Bridge Improvement | $2,359,316 |
MISSOURI | ARRA, ROUTE 65, BENTON COUNTY, BRIDGE DECK REHAB OVER OSAGE RIVER JUST SOUTH OF WARSAW, 0.194 MILE | Bridge Improvement | $1,497,700 | |
MISSOURI | ARRA, RT 67, ST LOUIS CO, ADA SIDEWALK IMPROVEMENTS ON RT 67 FROM OLD ST CHARLES RD TO I-270 & ON RT AC FROM I-270 TO RT 67, 7.538 | Transportation Enhancements | $1,997,400 | |
MISSOURI | ROUTE 69, CLAY COUNTY, THIN LIFT OVERLAY FROM THE CLINTON COUNTY LINE TO ROUTE 92, 6.017 MILES | Pavement Improvement | $260,300 | |
MISSOURI | ROUTE 70, LAFAYETTE COUNTY, PAVEMENT & SHOULDER TREATMENTS FROM THE JACKSON COUNTY LINE TO JOHNSON DR IN CITY OF ODESSA, 29.114 MI | Pavement Improvement | $6,861,500 | |
MISSOURI | ROUTE 70, COOPER COUNTY, RESURFACE THE WESTBOUND LANES FROM 0.3 MILE EAST OF ROUTE B TO THE SALINE COUNTY LINE, 17.1 MILES | Pavement Improvement | $7,612,000 | |
MISSOURI | ARRA, ROUTE 70, BOONE COUNTY, THIN LIFT OVERLAY FROM RTE 63 CONNECTOR TO RTE Z, 5.34 MILES | Pavement Improvement | $290,000 | |
MISSOURI | ARRA, RT 70, ST LOUIS CITY, PAVEMENT REPLACE & RDWAY IMPROVEMENTS FROM I-44/I-55 INTERCHANGE TO WASHINGTON AVE(MEMORIAL DR), .57 M | Pavement Improvement | $4,975,000 | |
MISSOURI | ARRA, ROUTE 71, BARTON COUNTY, CONSTRUCT INTERCANGE AT RTE 126, 0.6 MILE | New Construction | $4,516,400 | |
MISSOURI | ARRA, ROUTE 71, BARTON COUNTY, CONSTRUCT INTERCHANGE AT RTES DD AND EE, 0.6 MILE | New Construction | $3,667,300 | |
MISSOURI | ARRA, ROUTE 71, BARTON COUNTY, CONSTRUCT INTERCHANGE AT RTES V AND C, 0.6 MILE | New Construction | $3,681,800 | |
MISSOURI | ARRA, ROUTE 71, BATES COUNTY, CONSTRUCT INTERCHANGE AND RIGHT OF WAY ACQUISITION AT RTE 52 (SOUTH), 0.6 MILE | New Construction | $5,096,700 | |
MISSOURI | ARRA, RTE 76, TANEY COUNTY, SIDEWALK IMPROVEMENTS FROM ROARK VALLEY ROAD TO GRETNA, 2.864 MILES | Transportation Enhancements | $1,303,100 | |
MISSOURI | Right of Way to construct roundabout and new bridge over Lake Taneycomo | Other | $750,000 | |
MISSOURI | ARRA, ROUTE 83, BENTON COUNTY, REHAB OF BRIDGE DECK OVER TRUMAN RESERVOIR NEAR MOCKINGBIRD ROAD, 0.5 MILE | Bridge Improvement | $2,399,300 | |
MISSOURI | ROUTE 86, NEWTON COUNTY, PAVEMENT, SHOULDER IMPROVEMENTS AND RUMBLE STRIPES FROM RTE P TO 0.2 MILE WEST OF RTE 71, 9.952 MILES | Pavement Improvement | $845,800 | |
MISSOURI | ROUTE 86, BARRY COUNTY, PAVEMENT, SHOULDER IMPROVEMENTS AND RUMBLE STRIPS FROM RTE F TO 2.9 MILES EAST OF RTE H, 11.799 MILES | Pavement Improvement | $949,700 | |
MISSOURI | Thin lift overlay from Rte. 60 to south of railroad. | Pavement Improvement | $28,100 | |
MISSOURI | Rehabilitate pavement surface from I-55 to Kingshighway. | Pavement Improvement | $556,600 | |
MISSOURI | Thin lift overlay from County Road 462 to Rte. 67. | Pavement Improvement | $357,800 | |
MISSOURI | Thin lift overlay from Rte. V west of Doniphan to Rte. 160 in Doniphan. | Pavement Improvement | $763,700 | |
MISSOURI | Thin lift overlay from Rte. WW in Poplar Bluff to Rte. 158. | Pavement Improvement | $276,700 | |
MISSOURI | Resurface and improve shoulders from Lasalle Ave. to Lexington Ave. | Pavement Improvement | $1,791,300 | |
MISSOURI | Thin lift overlay from Rte. 164 to the Arkansas State line. | Pavement Improvement | $472,400 | |
MISSOURI | Thin lift overlay from Rte. U to Rte. 164. | Pavement Improvement | $365,800 | |
MISSOURI | Thin lift overlay on Spur 113 in Holt County from Rte. 113 to Rte. A and on Rte. A in Nodaway County from Spur 113 to Rte. 71 | Pavement Improvement | $670,300 | |
MISSOURI | Painting, redeck and bridge repairs of Missouri River bridge at Brownville, NE. | Bridge Improvement | $7,574,880 | |
MISSOURI | Thin lift overlay from Rte. 63 to Rte. N in Schuyler and Putnam counties. | Pavement Improvement | $977,000 | |
MISSOURI | Right of way acquisition to relocate/construct Route 141 from Rte. 40 to Rte. 340 (Olive Blvd). In cooperation with St. Louis County, construct Rte. 141 from Rte. 340 (Olive Blvd) to Rte. 364 (Page A | Other | $18,060,000 | |
MISSOURI | ARRA, RTE 141, ST LOUIS COUNTY, GRADING FOR UTILITY RELOCATIONS AT RTE 340, 0.5 MI | Pavement Improvement | $402,200 | |
MISSOURI | Widen from two lanes to four lanes from Horridge Road to Route 291. | Pavement Widening | $20,802,100 | |
MISSOURI | Thin lift overlay from Rte. D to Rte. DD | Pavement Improvement | $107,800 | |
MISSOURI | ADA Sidewalk improvements from Route 92 to Route KK. | Transportation Enhancements | $1,374,500 | |
MISSOURI | Pavement and shoulder improvements from Rte. 31 to I-29. | Pavement Improvement | $2,694,300 | |
MISSOURI | Thin lift overlay from east of Rte. 65 to Rte. 41. | Pavement Improvement | $67,300 | |
MISSOURI | Pavement and shoulder improvements from Rte. 5 to Rte. 40. | Pavement Improvement | $1,047,300 | |
MISSOURI | Thin lift overlay from Rte. 76 to Rte. 165. | Pavement Improvement | $295,000 | |
MISSOURI | Thin lift overlay from Rte. AB to Farm Road 107. | Pavement Improvement | $62,800 | |
MISSOURI | Extend Page Ave. from 0.3 mile west of Harvester to 0.6 mile east of Central School Road at Woodstream. | New Construction | $20,505,400 | |
MISSOURI | Extend Page Ave. from 0.6 mile east of Central School Road at Woodstream to 0.3 mile west of Central School Road. | New Construction | $22,474,500 | |
MISSOURI | Cold in Place Recycling in Shelby, Clark, Marion, Montgomery, Audrain and Monroe counties. | Pavement Improvement | $5,937,500 | |
MISSOURI | ST. LOUIS (IL) | ARRA CHURCH ST REPLCMNT BRDG, RESURFACING PROJECT; ASPHALT REPAVEMENT; SIDEWALK ON BOTH SIDES OF RD; LANDSCAPING; UNION; 1.2 MI. | Transportation Enhancements | $207,932 |
MISSOURI | Pavement improvements on westbound and eastbound lanes from Broadway to Rte. 63. | Pavement Improvement | $2,201,500 | |
MISSOURI | COLUMBIA | Build a railroad bridge over Route 63 north of Rte. B in Columbia. | Safety/Traffic Management | $3,307,857 |
MISSOURI | ST. LOUIS (IL) | RESURFACING | Pavement Improvement | $933,220 |
MISSOURI | ST. LOUIS (IL) | RESURFACING | Pavement Improvement | $411,980 |
MISSOURI | ST. LOUIS (IL) | RESURFACING | Pavement Improvement | $242,550 |
MISSOURI | ST. LOUIS (IL) | RESURFACING | Pavement Improvement | $112,027 |
MISSOURI | ST. LOUIS (IL) | PRELIMINARY ENGINEERING | Pavement Improvement | $628,253 |
MISSOURI | ST. LOUIS (IL) | RESURFACING | Pavement Improvement | $631,016 |
MISSOURI | ST. LOUIS (IL) | PRELIMINARY ENGINEERING | Other | $890,000 |
MISSOURI | ST. LOUIS (IL) | RECONSTRUCTION, SIDEWALKS | Other | $206,814 |
MISSOURI | ST. LOUIS (IL) | RESURFACING, SIDEWALKS, UTILITIES | Other | $105,504 |
MISSOURI | Rail extension, switch, crossings and siding for new tenant. | Other | $27,646 | |
MISSOURI | Dock and dolphin construction, site development | Other | $67,797 | |
MISSOURI | ARRA, ROUTE 111, ATCHISON COUNTY, THIN LIFT OVERLAY FROM RT 136 TO I-29, 3.75 MILES | Pavement Improvement | $274,200 | |
MISSOURI | ARRA, ROUTE 246, NODAWAY COUNTY, THIN LIFT OVERLAY FROM RTE 148 TO RTE E, 8.133 MILES | Pavement Improvement | $376,500 | |
MISSOURI | ARRA, ROUTE O, ATCHISON COUNTY, THIN LIFT OVERLAY FROM RT C TO RT 136, 9.881 MILES | Pavement Improvement | $573,200 | |
MISSOURI | Thin lift overlay from Rte. 48 to Rte. E. | Pavement Improvement | $414,900 | |
MISSOURI | ARRA, ROUTE DD, BUCHANAN COUNTY, THIN LIFT OVERLAY FROM RTE 371 TO RTE MM. 4.036 MILES | Pavement Improvement | $214,300 | |
MISSOURI | ROUTE A, CLINTON COUNTY, THING LIFT OVERLAY FROM RTE 69 TO RTE H, 11.323 MILES | Pavement Improvement | $577,500 | |
MISSOURI | ARRA, RTE AC, BUCHANAN COUNTY, RESURFACE DRIVING LANES AND SHOULDERS FROM RTE 6 (FREDERICK BLVD) TO RTE 36 IN ST JOSEPH, 2.407 MI | Pavement Improvement | $1,813,700 | |
MISSOURI | ARRA, ROUTE 190, LIVINGSTON COUNTY, THIN LIFT OVERLAY FROM DAVIESS COUNTY LINE TO RTE 65, 12.13 MILES | Pavement Improvement | $1,218,800 | |
MISSOURI | ARRA ROUTE D, MACON COUNTY, THIN LIFT OVERLAY FROM ROUTE 63 TO ROUTE 156 IN LAPLATA 1.003 MILES | Pavement Improvement | $89,000 | |
MISSOURI | ROUTE 156, MACON COUNTY, THIN LIFT OVERLAY FROM RTE 63 TO KNOX COUNTY LINE, 8.971 MILES | Pavement Improvement | $543,600 | |
MISSOURI | ROUTE 202, SCHUYLER COUNTY, THIN LIFT OVERLAY FROM THE IOWA STATE LINE TO RTE 63, 8.547 MILES | Pavement Improvement | $423,400 | |
MISSOURI | RT W, MARION CO, THIN OVERLAY ON RT W FROM RT 61 N JUNC TO RT 61 S JUNC AND RT 61 OUTER ROAD FROM RT W TO .3 MILE S OF RT W, 3.378 | Pavement Improvement | $177,500 | |
MISSOURI | ARRA, ROUTE A, RANDOLPH COUNTY, THIN LIFT OVERLAY FROM BUS RT 63 TO RT B, 9.56 MILES | Pavement Improvement | $577,200 | |
MISSOURI | ROUTE W, MONROE COUNTY, THIN LIFT OVERLAY FROM ROUTE 24 TO ROUTE J, 4.006 MILES | Pavement Improvement | $212,500 | |
MISSOURI | ARRA, ROUTE 151, SHELBY COUNTY, THIN LIFT OVERLAY FROM BUS RTE 36 TO RTE 24, 22.13 MILES | Pavement Improvement | $1,112,200 | |
MISSOURI | ARRA, ROUTE KK, LINCOLN COUNTY, THIN LIFT OVERLAY FROM OLD RTE 61 TO RTE W, 6.361 MILES | Pavement Improvement | $296,700 | |
MISSOURI | ARRA, ROUTE EE, LINCOLN COUNTY, THIN LIFT OVERLAY FROM RTE Y TO RTE 47, 5.259 MILES | Pavement Improvement | $261,200 | |
MISSOURI | ARRA, RTE 273, PLATTE COUNTY, PAVEMENT IMPROVEMENTS ON RTE 273 FROM RTE JJ TO I-29 AND SPUR 92 FROM RT 273 TO RTE 92, 4.907 MILES | Pavement Improvement | $478,800 | |
MISSOURI | ROUTE J, RALLS COUNTY, THIN LIFT OVERLAY FROM ROUTE EE TO ROUTE 154, 8.095 MILES | Pavement Improvement | $411,900 | |
MISSOURI | ROUTE EE, RALLS COUNTY, THIN LIFT OVERLAY FROM ROUTE J TO ROUTE 19, 4.648 MILES | Pavement Improvement | $247,100 | |
MISSOURI | ARRA, RTE 1, CLAY COUNTY, ADA SIDEWALK IMPROVEMENTS FROM VIVION ROAD TO 72ND STREET, 2.623 MILES. | Transportation Enhancements | $1,588,100 | |
MISSOURI | ARRA RT J LINCOLN/ WARREN CO THIN LIFT OVERLAY FROM 47 TO WARREN CO LINE/LINCOLN CO LINE TO I-70 N OUTER RD IN WARREN CO 11.634 MI | Pavement Improvement | $520,900 | |
MISSOURI | ROUTE M, RAY COUNTY, THIN LIFT OVERLAY FROM ROUTE C TO ROUTE 10, 5.763 MILES | Pavement Improvement | $206,200 | |
MISSOURI | ROUTE C, RAY COUNTY, THIN LIFT OVERLAY FROM ROUTE U TO ROUTE 10, 5.148 MILES | Pavement Improvement | $182,000 | |
MISSOURI | ARRA, ROUTE Z, BOONE COUNTY, THIN LIFT OVERLAY FROM RTE 124 TO I-70, 19.186 MILES | Pavement Improvement | $827,600 | |
MISSOURI | ROUTE FF, LAFAYETTE COUNTY, THIN LIFT OVERLAY FROM GILLESPIE DRIVE TO ROUTE O, 12.367 MILES | Pavement Improvement | $437,900 | |
MISSOURI | ARRA, ROUTE TT, WARREN COUNTY, THIN LIFT OVERLAY FROM RTE T TO RTE 94, 3.549 MILES | Pavement Improvement | $180,600 | |
MISSOURI | ARRA, ROUTE 131, JOHNSON COUNTY, PAVEMENT IMPROVEMENTS FROM RTE 50 TO RTE 2, 16.143 MILES | Pavement Improvement | $1,209,700 | |
MISSOURI | ARRA, ROUTE C, COLE COUNTY, PAVEMENT IMPROVEMENTS FROM RT AA TO RT 52, 21.054 MILES | Pavement Improvement | $2,054,900 | |
MISSOURI | ARRA, ROUTE 87, MONITEAU COUNTY, THIN LIFT OVERLAY FROM RTE O TO RTE C, 10.5 MILES | Pavement Improvement | $485,200 | |
MISSOURI | ARRA, ROUTE 47, ST FRANCOIS COUNTY, THIN LIFT OVERLAY FROM THE WASHINGTON COUNTY LINE TO THE CITY OF BONNE TERRE, 5.219 MILES | Pavement Improvement | $171,000 | |
MISSOURI | ARRA, ROUTE 47, ST FRANCOIS COUNTY, THIN LIFT OVERLAY FROM CITY OF BONNE TERRE TO RTE 67, 1.788 MILES | Pavement Improvement | $127,500 | |
MISSOURI | ARRA, ROUTE W, VERNON COUNTY, THIN LIFT OVERLAY FROM RTE 54 TO .9 MILE NORTH OF HIGHLAND, 2.377 MILES | Pavement Improvement | $135,900 | |
MISSOURI | ARRA, ROUTE K, VERNON COUNTY, THIN LIFT OVERLAY FROM BUS 71 TO COUNTY ROAD 507, 2.489 MILES | Pavement Improvement | $125,000 | |
MISSOURI | ARRA, ROUTE BB, VERNON COUNTY, THIN LIFT OVERLAY FROM RTE 54 TO RTE F, 5.969 MILES | Pavement Improvement | $282,400 | |
MISSOURI | ARRA, ROUTE 215, POLK COUNTY, THIN LIFT OVERLAY FROM RTE 123 TO RTE 13, 10.865 MILES | Pavement Improvement | $333,600 | |
MISSOURI | ROUTE P, JASPER COUNTY, THIN LIFT OVERLAY FROM RTE J TO RTE 66, 4.477 MILES | Pavement Improvement | $224,900 | |
MISSOURI | ARRA, ROUTE FF, JASPER COUNTY, CAPACITY IMPROVEMENTS FROM RTE 71 TO PRIGMOR AVENUE IN JOPLIN, 1.169 MILES | Pavement Improvement | $1,766,000 | |
MISSOURI | JOPLIN | ARRA, RTE. FF, JASPER COUNTY, INTERSECTION IMPROVEMENTS AT PRIGMOR AVENUE 1.2 MILES EO RTE. 71 IN JOPLIN, 0.2 MILES | Pavement Improvement | $1,248,500 |
MISSOURI | ARRA, ROUTE H, ST GENEVIEVE COUNTY, THIN LIFT OVERLAY FROM RTE 51 TO RTE 61, 6.844 MILES | Pavement Improvement | $328,400 | |
MISSOURI | ROUTE JJ, JASPER COUNTY, THIN LIFT OVERLAY FROM RTE Z TO RTE P, 3.969 MILES | Pavement Improvement | $179,600 | |
MISSOURI | ARRA, ROUTE EE, GREENE COUNTY, THIN LIFT OVERLAY FROM RT AB TO RT 160, 5.417 MILES | Pavement Improvement | $241,700 | |
MISSOURI | ARRA, ROUTE PP, WEBSTER COUNTY, THIN LIFT OVERLAY FROM RTE 60 TO 1.0 MILE WEST OF RTE FF, 1.78 MILE | Pavement Improvement | $50,800 | |
MISSOURI | ARRA, ROUTE H, GREENE COUNTY, THIN LIFT OVERLAY FROM SOUTH OF RTE KK TO NORTH OF VALLEY WATER MILL RD, 3.857 MILES | Pavement Improvement | $153,900 | |
MISSOURI | ARRA, ROUTE H, POLK COUNTY, PAVEMENT AND SHOULDER IMPROVEMENTS FROM RTE 32 TO RTE WW, 20.57 MILES | Pavement Improvement | $1,273,000 | |
MISSOURI | ARRA, ROUTE AB, GREENE COUNTY, THIN LIFT OVERLAY FROM ROUTE 160 TO ROUTE 266, 6.121 MILES | Pavement Improvement | $281,100 | |
MISSOURI | ARRA, ROUTE B, WEBSTER COUNTY, THIN LIFT OVERLAY FROM RTE AD TO BUS RTE 60, 5.683 MILES | Pavement Improvement | $162,700 | |
MONTANA | Wetland mitigation in the NW quadrant of the I-90 East Main Street Interchange in Bozeman. | Other | $232,865 | |
MONTANA | Reconstruction of existing Wylie Drive in Lewis & Clark County. | Safety/Traffic Management | $968,000 | |
MONTANA | Bridge replacement without added capacity on US 89 | Bridge Replacement | $2,728,753 | |
MONTANA | Overlay, Slope Flattening & Widening on US 89 within the Blackfeet Reservation | Pavement Improvement | $9,884,850 | |
MONTANA | Off site wetland mitigation reserve for Watershed #13 - Upper Yellowstone in Park County | Other | $346,767 | |
MONTANA | US-93 near Stevensville - Reconstruction with Added Capacity | Pavement Widening | $6,567,500 | |
MONTANA | I 15 Dearborn Rest Area Replacement | Safety/Traffic Management | $4,506,500 | |
MONTANA | Bridge Replacement Project on MT 7 North of Ekalaka | Pavement Improvement | $2,134,000 | |
MONTANA | Reconstruction of the existing roadway and structure work on MT 7 | Pavement Improvement | $8,217,000 | |
MONTANA | 14.2 mile chip seal on MT 13 in Daniels County north of Scoby | Pavement Improvement | $518,694 | |
MONTANA | 15.3 mile overlay on MT 16 between Plentywood and the Port of Raymond in Sheridan County. | Pavement Improvement | $3,022,926 | |
MONTANA | Mill and fill 5.5 miles of US 212 in Big Horn County and within the Northern Cheyenne Reservation. | Pavement Improvement | $2,004,800 | |
MONTANA | 8.1 mile pavement preservation, minor widening & pavement marking/guardrail upgrade on MT 39 in Rosebud County, just north of the Northern Cheyenne Reservation. | Pavement Improvement | $1,905,486 | |
MONTANA | 9 mile overlay on MT 200 west of Richey, in Dawson County | Pavement Improvement | $2,306,303 | |
MONTANA | 14.6 mile chip seal on MT 86 northeast of Bozeman in Gallatin County. | Pavement Improvement | $899,351 | |
MONTANA | 5 mile mill and resurface of I 90 in Sweet Grass County | Pavement Improvement | $3,205,584 | |
MONTANA | BILLINGS | Cold mill and overlay I -90 at the Pinehills Interchange and 3.2 miles to the west. | Pavement Improvement | $1,342,000 |
MONTANA | 13.3 mile full width overlay of I 90. Ramps will be cold milled and overlaid. The rest area parking lot will be crack sealed and s&c. | Pavement Improvement | $7,936,247 | |
MONTANA | I 94 Bridge Deck Rehabilitation In Rosebud County | Bridge Improvement | $4,931,200 | |
MONTANA | 6.2 mile mill and fill on I 94 east of Wibaux, in Wibaux County. | Pavement Improvement | $1,319,731 | |
MONTANA | BILLINGS | 1.4 mile overlay in Billings | Pavement Improvement | $556,542 |
MONTANA | BILLINGS | Reconstruct a portion of Shilo Road from 2 lane to 4 lane - Billings | Pavement Widening | $9,301,727 |
MONTANA | 0.7 mile mill and fill in Butte | Pavement Improvement | $768,730 | |
MONTANA | 3.5 mile chip seal on S 260 north of Libby | Pavement Improvement | $186,403 | |
MONTANA | 2.3 mile chip seal on S 271 northeast of Drummond in Powell County | Pavement Improvement | $111,165 | |
MONTANA | Installing post mounted flashers at the intersection of S-279 & S 231 north of Helena | Safety/Traffic Management | $35,000 | |
MONTANA | Installing post mounted flashers on York Road northeast of Helena | Safety/Traffic Management | $33,750 | |
MONTANA | 7.7 mile overlay on S-308 in Carbon County west of Belfry | Pavement Improvement | $1,444,840 | |
MONTANA | Pave State Secondary 323 from RP 24.83 to 37.1 This is the section that is currently under contract with a total reconstruct to a all weather gravel surface. | Pavement Improvement | $8,652,601 | |
MONTANA | MISSOULA | 2.6 mile seal and cover on a state highway west of Missoula. | Pavement Improvement | $233,249 |
MONTANA | 4.6 mile chip seal on S 424 west of Kalispell | Pavement Improvement | $186,479 | |
MONTANA | 3.5 mile chip seal on S 503 southwest of Kalispell | Pavement Improvement | $154,610 | |
MONTANA | 2.4 mile mill and fill on S 507 east of Alberton, Missoula County | Pavement Improvement | $460,118 | |
MONTANA | GREAT FALLS | 0.9 mile overlay in Great Falls | Pavement Improvement | $598,282 |
MONTANA | GREAT FALLS | 0.7 mile overlay in Great Falls. | Pavement Improvement | $355,008 |
MONTANA | GREAT FALLS | 0.6 mile overlay in Great Falls. | Pavement Improvement | $327,122 |
MONTANA | GREAT FALLS | 0.18 mile mill and fill in Great Falls | Pavement Improvement | $355,857 |
MONTANA | GREAT FALLS | Multiple Location sidewalk Improvment Project - Great Falls | Transportation Enhancements | $1,043,314 |
MONTANA | GREAT FALLS | Phase 3 of a Multiple Location sidewalk Improvment Project - Great Falls | Transportation Enhancements | $479,600 |
MONTANA | 1.09 mile mill and fill in Helena | Pavement Improvement | $675,340 | |
MONTANA | 0.3 mile mill and fill in Helena | Pavement Improvement | $242,918 | |
MONTANA | 0.83 mile overlay in Helena | Pavement Improvement | $383,990 | |
MONTANA | 0.7 mile mill and fill in Livingston | Pavement Improvement | $215,594 | |
MONTANA | MISSOULA | 0.8 mile mill and fill in Missoula | Pavement Improvement | $150,745 |
MONTANA | MISSOULA | 0.17 mile mill and fill in Missoula | Pavement Improvement | $76,845 |
MONTANA | MISSOULA | On the Scott Street overpass in Missoula, Bridge deck repair and replacing the surface with a high strength epoxy concrete. | Bridge Improvement | $2,013,827 |
MONTANA | MISSOULA | 0.3 mile mill and fill in Missoula | Pavement Improvement | $119,570 |
MONTANA | MISSOULA | Intersection & Signal Improvement in Missoula | Pavement Improvement | $689,800 |
MONTANA | MISSOULA | NORTH HIGGINS BIKE/PED-MSLA (PENG) Along both sides of State Urban Route 8119/Higgins Ave-Sidewalks, bike lanes, lighting.. | Other | $125,000 |
MONTANA | MISSOULA | 2 mile mill and fill in Missoula | Pavement Improvement | $616,301 |
MONTANA | MISSOULA | MULLAN RD BIKE/PED PATH-MSLACO (PENG) South side of State Urban Route 8123/Mullan Rd-Hard surfaced bike/ped path... | Other | $72,000 |
MONTANA | MISSOULA | SIDEWALK RAMPS-MISSOULA (PENG) Along various routes within the Missoula urban limits-ADA sidewalk ramps.. | Other | $20,000 |
MONTANA | MISSOULA | GREENOUGH DRIVE SIDEWALKS-MSLA (PENG) Both sides of Greenough Drive between Madison Ave & Water Works Hill Trailhead-Sidewalks... | Other | $30,000 |
MONTANA | Bridge & Approach Replacement without added Capacity | Bridge Replacement | $2,402,036 | |
MONTANA | Bridge Replacement Project | Pavement Improvement | $776,600 | |
N MARIANA | CROSS ISLAND RD, PHASE II RECON, WIDENING, DRAINAGE IMPRVMTS, 500 FT PAST INTERSXN W/KAGMAN RD TO INTERSXN W/TALOFOFO RD (1.73 MI) | Other | $4,500,000 | |
NEBRASKA | Resurf., S. Shld., Br. Repair | Pavement Improvement | $3,665,228 | |
NEBRASKA | Br. | Bridge Replacement | $2,966,171 | |
NEBRASKA | Resurf., S. Shld. | Pavement Improvement | $2,601,872 | |
NEBRASKA | Urban | Pavement Improvement | $1,645,634 | |
NEBRASKA | Resurf. | Pavement Improvement | $5,132,648 | |
NEBRASKA | LINCOLN | Resurf., S. Shld. | Pavement Improvement | $2,296,813 |
NEBRASKA | Gr., Culv., Br. | Bridge Replacement | $1,944,384 | |
NEBRASKA | Resurf., S. Shld., Str. | Pavement Improvement | $4,907,360 | |
NEBRASKA | Gr., Surf., Br. | Bridge Improvement | $1,717,017 | |
NEBRASKA | Resurf. | Pavement Improvement | $4,633,135 | |
NEBRASKA | Resurf. | Pavement Improvement | $6,943,834 | |
NEBRASKA | Joint Seal, Diamond Grinding | Pavement Improvement | $1,380,504 | |
NEBRASKA | Br. Deck Overlay | Bridge Improvement | $1,315,548 | |
NEBRASKA | Br. Deck Overlay | Bridge Improvement | $1,050,940 | |
NEBRASKA | Joint Repair, Diamond Grinding | Pavement Improvement | $2,164,435 | |
NEBRASKA | Resurf., S. Shld. | Pavement Improvement | $6,670,500 | |
NEBRASKA | Resurf. | Pavement Improvement | $5,255,421 | |
NEBRASKA | OMAHA (IA) | Gr., Surf., S. Shld. | Pavement Widening | $16,486,652 |
NEBRASKA | Viaduct | Bridge Replacement | $6,943,648 | |
NEBRASKA | Resurf., S. Shld. | Pavement Improvement | $3,914,863 | |
NEBRASKA | Resurf., S. Shld. | Pavement Improvement | $2,135,795 | |
NEBRASKA | Resurf. | Pavement Improvement | $3,745,305 | |
NEBRASKA | Resurf. | Pavement Improvement | $2,395,806 | |
NEBRASKA | Br. | Bridge Replacement | $372,654 | |
NEBRASKA | Resurf. | Pavement Improvement | $1,635,326 | |
NEBRASKA | Resurf., S. Shld. | Pavement Improvement | $3,304,415 | |
NEBRASKA | Resurf. | Pavement Improvement | $2,878,863 | |
NEBRASKA | Br. Repair/Rehab. | Bridge Improvement | $5,403,400 | |
NEBRASKA | Resurf., S. Shld. | Pavement Improvement | $3,139,546 | |
NEBRASKA | OMAHA (IA) | Br. | Bridge Replacement | $2,018,451 |
NEBRASKA | OMAHA (IA) | Br. | Bridge Improvement | $1,665,817 |
NEBRASKA | OMAHA (IA) | Gr., Culv., Surf., Br. Removal | Pavement Improvement | $13,955,039 |
NEBRASKA | OMAHA (IA) | Br. | Bridge Improvement | $3,296,000 |
NEBRASKA | Urban | Pavement Improvement | $1,157,694 | |
NEBRASKA | Gr., Culv., Resurf. | Pavement Improvement | $1,947,585 |
Source: FDIC